Job Task Analysis

Job task analysis for utility training: when a procedure changes, the tasks, questions and retrain list change with it, before anyone switches the old way

Training built from the procedures crews actually use.

See one case, screen by screen ↓
target0peopleswitching on a changed procedure without the new steps: everyone on a changed task is briefed before their next switch
demo5of 15questions on the three changed tasks tested steps that rev 8 changed; all 5 redrafted, and the 2 new steps each given a question
demo64peopleauthorised persons in the plan for a practical re-assessment on the rig by 9 Apr 2027, six months from the revision, in 8 sessions of 8
demo11minfrom the revision being issued to draft tasks, questions, a lesson plan and a retrain list, all waiting for an SME
The problem

Why training falls behind every procedure change

A procedure revision arrives as a PDF with change bars. Someone in the training team has to read it against the task analysis, find each step that came from a changed clause, find each question that tests that step and each slide that teaches it, re-rate the task, then work out from the authorisation register who holds it and when they next switch. The learning system records who completed what, not which clause a lesson came from, so all of that is done by hand from a spreadsheet and memory.

Until it is done, the question bank still passes people who give the answer the old procedure wanted. At the demo utility, the rev 7 question “At the RMU, how do you confirm you have the right panel?” still accepted “check the panel label against the schedule”, the check that was done in the wrong-panel near-miss. For a reliability-related task, NERC PER-005-2 R3.1 asks for each person's capabilities to be verified within six months of the change, and R1.1 asks for the task list to be built by a documented method and reviewed each calendar year.

typical13.8per 100,000line installers and repairers die at work, against 3.3 for all workers
estimated6–10weeksfrom a procedure revision to updated training and assessments, by hand
Where a procedure revision's working days goestimated
By hand35 days
With the solution3.8 days
  • Reading the revision against the task analysis3 → 0.1 d
  • Rewriting task steps and re-rating criticality5 → 0.5 d
  • Finding and redrafting the questions that test changed steps8 → 1 d
  • Updating the lesson plan, slides and rig practical8 → 1 d
  • Working out who holds the task and when they next switch5 → 0.2 d
  • Subject-matter expert review and sign-off6 → 1 d

Estimated split for one procedure revision that changes three tasks, in working days, by hand and with the solution. The by-hand total matches the median of 7 weeks in the demo utility's 2025 change log (14 revisions, 6–10 weeks each).

How it works

How a revision becomes training

Six specialist agents turn each procedure revision into changed steps, redrafted questions and a retrain list; a subject-matter expert signs every item.

What comes in
Revision in4 sources · procedure, incidents, task list, authorisations
Agents at work
Procedure readerclause by clause
Then
Task analyststeps, knowledge, skills
Criticality raterdifficulty, importance, frequency
Then
Question writeritems from real errors
Lesson plannerplan, slides, practical
Then
Impact mapperwho retrains, by when
A person decides
Subject-matter expertsigns every task and question
What comes out
Updated task list
Redrafted questions
Retrain list
One case, step by step

How job task analysis works when a procedure changes: one revision, screen by screen

Lumina Utilities trains its HV authorised persons at Lumina Academy's Fernhollow Training Centre. The job “HV authorised person: distribution switching” has 31 tasks, taught by 9 lessons and tested by 310 questions. On Friday 9 October 2026 its 11 kV ring main unit procedure changed. Here is what happens next, in the working solution.

  1. 01Fri 9 Oct · 14:20

    Rev 8 of the RMU switching procedure is issued

    Joanne Pike · Procedure owner, network operations standards

    Joanne issues OP-SW-214 rev 8, “Switching and isolation of 11 kV ring main units”, under change notice CN-2026-041. It follows near-miss NM-2026-118 at Kilnsey Lane 4 RMU and lesson learned LL-2026-07 from the Fernhollow rig. The change inbox picks it up as a task change, beside a chlorine drum changeover revision at Saltmere water treatment works, a new RMU type commissioned at Ashgrove and a wording-only change to the LV pillar fuse procedure.

    NM-2026-118: “Hand on panel 2 when the schedule said panel 3; stopped by the second person”

  2. 0214:22

    Three clauses changed, eleven unchanged

    Procedure reader

    The procedure reader compares rev 8 with rev 7 clause by clause. §5.4 is new: lock the local/remote selector in LOCAL with a safety lock and record the lock number on the switching schedule. §6.3 replaces “check the panel label” with point and confirm. §7.2 adds a second proving of the voltage indicator after testing for dead. By 14:25 the task analyst has updated HV-B12, HV-B07 and HV-C09: 4 steps changed and 2 added, each cited to its clause.

    “Procedure reader · §5.4 new · §6.3, §7.2 changed”

  3. 03Tue 13 Oct · 08:40

    The procedure, its tasks and its questions, joined line to line

    Amira Solberg · Instructional designer, Lumina Academy

    Amira owns the task analyses and assessments for HV switching and earthing. She opens the breakdown: the procedure on the left with change bars, the tasks in the middle with each step tagged to its clause, and the questions on the right with the step each one tests. The banner reads 3 clauses changed, 3 tasks, 7 questions redrafted or added, 64 people retrain, 11 this week.

    “Draft · not live until an SME signs”

  4. 04Rev 7 · live today

    What the live training still teaches

    Amira Solberg · Instructional designer

    One click shows rev 7, the training people are assessed on today. HV-B12 stops at telling the control engineer the RMU is in local control: there is no selector lock and no lock number. Its question “You have selected LOCAL. What do you tell the control engineer?” and the HV-B07 question “At the RMU, how do you confirm you have the right panel?” are marked as testing steps that have changed.

    “Showing rev 7: the training that is live today”

  5. 0514:26 on Friday

    HV-B12 rises from high to critical, with the evidence

    Criticality rater

    The task statement reads as given, do and to the standard: transfer the RMU to local control and secure the selector so that it cannot be operated from the control room while anyone works on its circuits. Importance goes from 3 to 4, because in IR-2025-044 a selector left in REMOTE let the control room close a switch during cable work and a jointer was burned. Difficulty goes from 2 to 3 for the lock and its record. Rhys Calloway and Megan Holt agree; Yusuf Haddad has not yet confirmed.

    The criticality rater only proposes: three SMEs confirm a critical rating.

  6. 06The questions

    Distractors drawn from the near-miss

    Question writer

    Q-B07-3 now asks: “You are at Kilnsey Lane 4 RMU to open panel 3. What must happen before you operate it?” The right answer is point and confirm, cited to §6.3. Distractor A is the rev 7 answer, the check that was done in NM-2026-118; distractor C, asking the second person, is what stopped the near-miss but is not the rule. The rev 7 item is retired when the new one is signed, never deleted.

    Rhys Calloway: “If a question can be passed by someone who'd still open the wrong panel, it's the wrong question.”

  7. 07The lesson

    A 45-minute briefing and a 60-minute rig practical

    Lesson planner

    L-HV-214 “Point and confirm, double proving” is drafted from the changed steps: why it changed, point and confirm, locking the selector, prove-test-prove and a knowledge check, then the practical on the Fernhollow 11 kV RMU rig with instructor Colm Brennan. Each objective maps to a step and the question that tests it. Six of 22 slides in deck HV-SW-04 must change, and the practical checklist marks five critical steps.

    Practical checklist: “observed on the rig · critical steps 100%”

  8. 0814:31 on Friday

    64 people hold the changed tasks; 11 switch in the next 7 days

    Impact mapper

    From the authorisation register and the switching schedules, the impact mapper finds 64 authorised persons in four depots: Brackenford 19, Kilnsey Cross 16, Marrow Bay 17 and Ashgrove 12. Eleven are named on switching schedules for these tasks between Wed 14 and Tue 20 Oct, so they get the 45-minute briefing first. The first is Gareth Lowe, on Wed 14 Oct at 09:00, at Kilnsey Lane 4: the near-miss site.

    The impact mapper never suspends an authorisation; the training manager decides.

  9. 09Six months

    All 64 planned for re-assessment on the rig by 9 April

    Impact mapper

    The practical re-assessment is due six months from the revision, by 9 Apr 2027. The plan proposes 8 sessions of 8 seats on the Fernhollow rig, from RA-01 on Tue 3 Nov at Brackenford to RA-08 on Thu 18 Mar as a mixed catch-up session, with Colm Brennan as instructor and Rhys Calloway as assessor.

    “8 sessions × 8 seats = 64”

  10. 10Signed

    Daniel approves who retrains, and by when

    Daniel Okoro · Training manager, network operations

    Daniel signs the retrain plan with his password: 11 briefings before the next switch, and a practical re-assessment for all 64 authorised persons in 8 sessions by 9 Apr 2027. Nothing from rev 8 reaches a person until three people have signed: Rhys for each changed step and question, Amira for the three task analyses, and Daniel for the plan.

    Daniel Okoro: “Tell me who must be re-briefed before they next switch, not after.”

Who it’s for

Built for everyone who keeps training in step with the procedure.

The same revision, seen by the four people who own it: what a procedure change meant before, and what it means now.

AS
Amira SolbergInstructional designer, Lumina Academy · HV switching and earthing, 31 tasks and 310 questions
Instructional designer
Before
Rebuilds the training by hand from a PDF and a spreadsheet, weeks after each revision. “Network Ops issued rev 8 on Friday. I need to know by Monday which of my questions are now wrong.”
Now
Opens the breakdown on Tuesday morning with the changed clauses traced to 3 tasks and 7 questions already redrafted, and signs each task analysis.
RC
Rhys CallowaySenior authorised person, Brackenford depot · 22 years switching · signs each task and question
Subject-matter expert
Before
Reviews task analyses and question banks for technical accuracy, often long after the procedure has changed.
Now
Reviews the 7 rev 8 items side by side with the rev 7 item, the clause behind the right answer and why each distractor is there, then accepts, edits a distractor or returns it with a reason.
DO
Daniel OkoroTraining manager, network operations · 184 authorised persons in four depots
Training manager
Before
Approves who retrains and when, from lists built by hand after the change has already reached the field.
Now
Sees the 11 people who switch this week at the top of the list, and approves briefings and rig sessions for all 64 in one signature. “Tell me who must be re-briefed before they next switch, not after.”
JP
Joanne PikeProcedure owner, network operations standards · writes and issues switching and earthing procedures
Procedure owner
Before
Issues revisions that reach the training weeks later. “Every revision I issue should land in the training the same week.”
Now
Sees each change notice classified as a task change, a new task or wording only, with the clauses, tasks, questions and people it touches.
Built on the engine

6 agents. Each with one job, and hard limits.

Six specialist agents turn each procedure revision into changed steps, redrafted questions and a retrain list; a subject-matter expert signs every item.

Procedure reader

Compares each procedure revision with the issued version, clause by clause, quotes the old and new wording and classifies every change as a task change, a new task or wording only. Links the incidents and lessons learned the change notice cites.

  • Never edits a procedure; the procedure owner issues it
  • Quotes old and new wording for every change
  • “Wording only” needs a designer to confirm
Task analyst

Breaks a procedure into tasks and steps, writes each task statement as “Given …, do …, to the standard …” in observable terms, lists the knowledge and skills each step needs and tags every step with its source clause.

  • Every step cites its clause
  • Never removes a task; proposes, the designer decides
  • Keeps the previous version
Criticality rater

Proposes difficulty, importance and frequency, each 0–4, and the training decision, using incident history for importance and switching-schedule counts for frequency. A score of 10 or more, or importance 4, is critical.

  • Proposes only; three SMEs confirm a critical rating
  • Shows the evidence for each score
Question writer

Redrafts or adds knowledge questions, scenarios on named equipment and observed practical checks for each changed step, with distractors drawn from the old procedure and from real errors in incidents, and the clause behind the right answer.

  • Never puts a question live; an SME signs each one
  • Every right answer cites a clause
  • Retires the old item, never deletes it
Lesson planner

Updates the lesson plan for the changed steps: objectives mapped to steps, timing, activities, the rig practical and its checklist, and every slide that still teaches an old step.

  • Never publishes without the designer
  • Objectives map to steps one to one
Impact mapper

Lists everyone in the authorisation register who holds an affected task, reads the next 7 days of switching schedules so anyone named is briefed first, sets the practical re-assessment six months from the revision and proposes rig sessions of 8.

  • Never suspends an authorisation; the training manager decides
  • Names each person and the schedule that makes them urgent
SME and training manager

The expert signs each item; the manager approves who retrains. The agents propose; a named person decides.

Ask in plain words

Ask about any procedure, task, question or person

Ask in plain words, or say what to change. Every answer points to the clause, schedule or record behind it.

What changed in rev 8, and what does it break?

Three clauses, three tasks, seven questions. §5.4 is new: lock the local/remote selector and record the lock number. §6.3 replaces “check the label” with point and confirm. §7.2 adds a second proving of the indicator. That changes 4 steps and adds 2 in HV-B12, HV-B07 and HV-C09; 5 questions tested the old steps and 2 new steps had none.

Who must be briefed before they next switch?

11 of the 64. Their switching schedules fall between Wed 14 and Tue 20 Oct, starting with Gareth Lowe at Kilnsey Lane 4 tomorrow at 09:00, the RMU where the near-miss happened. The other 53 have no switching on these tasks this week; all 64 need the practical by 9 Apr 2027.

Why is HV-B12 now critical?

Its importance went from 3 to 4. A selector left in REMOTE let the control room close a switch during cable work at Marrow Bay, and a jointer was burned. Rev 8 adds a lock and a record, so difficulty rises from 2 to 3. The score goes from 7 to 9, and importance 4 makes any task critical. Rhys and two other SMEs still have to confirm it.

Draft the point-and-confirm question in Arabic too

Done, as a draft beside the English. The four options keep the same order and the same answer. It goes to Rhys with the English item; an Arabic-speaking SME, Yusuf Haddad, is added as a second reviewer.

Every screen

The working solution, as it ships.

13 screens from the working solution, on its sample data. Pick one to see it large.

The procedure breakdownThe procedure with its change bars, each task step tagged to its clause and each question tagged to the step it tests, joined by lines.
Rev 7, live todayThe training people are assessed on now, with the questions that test changed steps marked.
Agents at work on rev 8The revision replayed: the changed clauses, the steps they feed and the new step written in.
ChangesProcedure revisions, new equipment, incidents and lessons learned, each classified as a task change, a new task or wording only.
The task list31 tasks for HV switching with difficulty, importance and frequency, criticality, training decision, the procedure each is built on and the people who hold it.
One task analysisThe task statement, steps cited to their clauses, knowledge and skills, and the criticality votes of the rater and three SMEs.
Question reviewThe retired rev 7 item beside the rev 8 draft, the clause behind the right answer and why each distractor is there.
The lesson planTiming, objectives mapped to steps and questions, the slides to change and the rig practical checklist.
Who must retrain64 authorised persons, the 11 named on switching schedules by Tue 20 Oct first, with their schedule and RMU.
Rig re-assessment sessionsAll 64 by depot, and 8 practical sessions on the Fernhollow rig before the 9 Apr deadline.
Approve the retrain planThe training manager signs who is briefed, who re-assesses and by when.
Sign-off and audit trailThe three people who must sign before rev 8 reaches anyone, and every agent and human step with its time.
Your rulesCriticality scores, retrain windows, pass marks, who signs and the sources the agents read.
Governance

Cited, signed and on the record.

Every step and answer cites its clauseEach task step, each right answer and each lesson objective is tagged with the procedure clause it came from, and every criticality score shows the incidents and schedule counts behind it.
Nothing reaches a person unsignedThe SME signs the technical accuracy of each changed step and question, the instructional designer signs each task analysis and publishing, and the training manager approves the retrain plan. Each signature is given with a password.
Three SMEs confirm a critical ratingThe criticality rater only proposes difficulty, importance and frequency. A critical rating stands only when three subject-matter experts have confirmed it, and the task page shows who agrees and who has not yet.
Old versions are kept, not deletedEach task analysis and question records the procedure revision it was built on. A rev 7 question is retired when its rev 8 replacement is signed, and a task is never removed by an agent.
Agents read; people decideThe agents read the procedure library, change notices, safety reporting, the authorisation register, switching schedules and the learning system read-only. They never edit a procedure, publish a lesson or suspend an authorisation.
An append-only audit trailEvery agent step and every human decision, from the revision being issued to each signature, is on the audit trail with its time. It is append-only and kept 3 years or since the last audit.
Configuration

Your training rules, not ours

How tasks are rated, when people retrain, who signs and where the agents read from are settings, saved as a new version each time they change.

SettingDefaultChoose from
Critical at a score of10difficulty + importance + frequency, each 0–4
Importance 4 is always criticalOnOn · Off — importance 4 means injury or loss of supply is possible
SMEs to confirm a critical rating3a number of SMEs — the rater only proposes
Use incident history for importanceOnOn · Off — incidents and near-misses since 2019
Critical task changed: briefing before the next useOnOn · Off
Practical re-assessment within6 monthsmonths from the revision
Knowledge check pass mark80 %per cent; critical steps on the practical must all be passed (100 %)
Look ahead in switching schedules7 daysdays — anyone named in that window is briefed first
Connections

Works with the systems your training already runs on

Procedure libraryissued procedures and their revisions, read clause by clause
Change noticeswhat changed, why and when, with the incidents behind it
Safety reportingincidents, near-misses and lessons learned
Authorisation registerwho holds which task, by depot
Switching scheduleswho switches on which RMU, and when
Learning systemlessons, slides, question banks and results
What it changes

The difference, in numbers.

Every figure is labelled: a target the solution is built to, an estimate, a typical published result, or a proven one.

target
0
people switching on a changed procedure without the new steps
11 of 11 briefed
before their next switch
typical
100%
of people on a changed task re-verified inside the six-month window
target
Sameday
from a revision to draft tasks, questions and a retrain list
By hand6–10 weeks
With agentssame day

“demo” = seen in the working solution, on its sample data · “target” = the design goal, measured in the live solution · “estimated” = our estimate; 6–10 weeks and the working-days split are estimated from the demo utility's 2025 change log · “typical” = published figures (BLS Census of Fatal Occupational Injuries via Relia Magazine: line installers 13.8 deaths per 100,000 against 3.3 for all workers, not re-checked). Regulatory context: NERC PER-005-2 R1.1 and R3.1; DOE-HDBK-1078-94, A Systematic Approach to Training. Lumina Utilities, Lumina Academy and the people, depots, equipment, procedures and records named on this page are fictional — characters and sample data in the working solution.

Questions

What utility training teams ask us.

What is job task analysis software for utilities?

Software that turns a utility's procedures into a task list with steps, knowledge, skills and criticality, and into the lessons and assessment questions built on them. Job Task Analysis keeps every step and question joined to the procedure clause it came from, so when a procedure changes, the training that depends on it can be found and updated.

How does job task analysis work when a procedure changes?

The procedure reader compares the revision with the issued version clause by clause. The task analyst rewrites the affected steps, the criticality rater re-rates the task, the question writer redrafts the questions that test the old steps, the lesson planner updates the lesson and slides, and the impact mapper lists who must retrain and by when. In the demo, that took 11 minutes for three changed clauses.

How does it decide which tasks are critical?

The criticality rater proposes difficulty, importance and frequency, each scored 0–4, using incident history for importance and switching-schedule counts for frequency. A score of 10 or more, or importance 4, makes a task critical. The rater only proposes; three SMEs confirm a critical rating.

Does it support a PER-005 task list and six-month verification?

It keeps the task list, the documented method it was built with and its annual review date, and sets the practical re-assessment for everyone on a changed task six months from the revision, as NERC PER-005-2 R3.1 describes. In the demo, all 64 people on the changed tasks are booked on the rig by 9 Apr 2027. Your compliance team decides how you use it as evidence.

How are the new assessment questions written?

For each changed or new step, the question writer drafts knowledge questions, scenarios on named equipment and observed practical checks. Distractors come from the old procedure and from real errors in incidents, and every right answer cites its clause. An SME accepts, edits or returns each one with a reason.

Who must retrain, and who is briefed first?

The impact mapper reads the authorisation register for everyone who holds an affected task, and the next 7 days of switching schedules. Anyone switching on a changed critical task gets a briefing before their next switch; everyone else re-assesses within six months. The training manager approves the plan.

Do people stay in control of the training?

Yes. The agents read the source systems read-only and only draft and propose. An SME signs every task and question, the instructional designer signs each task analysis and publishes, and the training manager approves who retrains. Agents never edit a procedure, remove a task or suspend an authorisation.

How long does it take to go live?

The Agentic Solution Engine builds and deploys it from your requirements and documents: your procedures, task list, rating method, question bank and lesson plans. It goes live once every quality gate has passed. We will walk you through it on one of your own recent revisions first.

See it on
your procedures.

We'll run Job Task Analysis on one of your own recent procedure revisions and the task list behind it.