- Before
- “By the time the quarterly pack tells me a program is off, it has been off for a quarter.”
- Now
- Sees Brickline cross its re-price level the morning Corbel’s bordereau lands, with the commentary drafted and four options projected.
One program, from bordereau to decision
Corbel Program Underwriters writes the Brickline Habitational Program, apartment property and general liability in five states, on Harlow Ridge Specialty paper. On June 17 at 08:12 its May bordereaux land. Here is that morning, screen by screen, in the working solution.
- 0108:12
The bridge, as at April, with May waiting
Nadia Whitfield · Head of Program BusinessNadia opens Brickline’s loss ratio bridge: a 58.0% plan, plus rate (+2.0), mix (+1.5) and large losses (+3.1), less attritional (−1.2), to a projected ultimate of 63.4%. The re-price level in clause 9.3 is 1.6 points away. A banner says Corbel’s May bordereaux landed at 08:12, 13 days before they are due: 4,982 risk rows, 1,204 premium rows, 318 claims rows.
“Six agents are ready to check, re-rate, re-project and redraw. Nothing changes on the bridge until you apply.”
- 02One click
“Apply the May bordereaux”
The agentsThe run plays out in the right-hand rail. Corbel’s three files are mapped to one standard and checked against binder BH-2026-01. 212 May renewals are re-rated on rate guide v4.2. Two new large losses are found, the ultimate is re-projected, and the bridge redraws while April stays on screen as a ghost.
- 036.8 seconds later
Large losses lit up, re-price level crossed
Bridge builderThe large-loss bar grows from +3.1 to +9.4 points and is tagged “+6.3 since Apr”. Projected ultimate is now 69.4%, above the 65.0% re-price level and 2.6 points under the 72.0% off-ramp. The strip below updates too: written $36.8M against a $35.0M plan, six large losses for $2.6M, 99.5% of rows passing checks.
“May bordereaux applied at 08:14. Large losses moved most: +6.3 points since April. The re-price trigger at 65.0% is crossed.”
- 04Checked
Every row checked against the binder
Bordereau intake checkerRow counts tie to Corbel’s control totals, and the $7.41M written in May ties to account statement ST-CPU-2026-05. One risk in Lake Charles, Louisiana sits outside the binder territory and goes to Rhea Banerjee as a referral. 23 risks with $41.3M of TIV have no year built. They are queried back to Corbel and held out of the mix step.
“Held out of the mix step until Corbel replies. Nothing was filled in.”
- 05Drill
The rows behind the large-loss bar
Loss projectorSix claims over $250,000 come to $2,613,000, or 18.4 points of the $14.2M earned against a 9.0-point load. The biggest is new in May: Westmoor Commons in Houston, a dryer-vent fire in building C with 14 of 168 units out, $905,000 incurred, from claims bordereau row 112. Cypress Landing in Jacksonville, a negligent-security suit, adds $365,000.
“Large losses are taken at reported incurred, uncapped. Excess of $1M per risk is ceded under the per-risk treaty and is not on this bridge.”
- 06Drill
Where the rate guide was not followed
Rate monitorOn 1,146 renewals, rate achieved is +5.4% against +9.0% planned, and Texas is weakest at +4.0% against +10.0%. Rate guide v4.2 §3.1 adds 15% for frame buildings built before 1980. Corbel did not charge it on 61 of 214 pre-1980 renewals. Westmoor Commons is one of them: charged $96,400 where the rate guide gives $110,900.
“About a third of the shortfall is one rule not applied.”
- 07Drill
Older buildings than the plan allowed
Mix analystBuildings from before 1980 are 26.4% of insured value against 18.0% in the business plan, mostly new accounts in Houston and Atlanta. At the plan’s loss relativity for older frame (1.18), that is 1.6 points. The 23 risks with no year built stay out of the step. If all of them were pre-1980, it would be +1.8.
- 0808:14
The binder opens a re-price review
Bridge builderThe watchlist shows every program against its own re-price and off-ramp levels, month by month. Brickline’s re-price review is open under clause 9.3, with rate changeable on 60 days’ notice and a decision due July 17. Small Fleet Auto is above its 72.0% off-ramp level for a second month. Landscapers & Tree Care is on watch at 62.5% against 64.0%.
The agents open the review. They never send a notice; that needs Nadia’s signature.
- 09Signed 08:41
A loss pick he can trace to a claim
Owen Castellano · Program actuaryThe May commentary was drafted at 08:16 in the house layout: headline, large losses, rate, mix, attritional and what we ask of Corbel. Every sentence carries its source: a bordereau row, a binder clause, the rate guide or the business plan. Owen signs the 69.4% loss pick: chain ladder on incurred, with Bornhuetter-Ferguson at 58.0% a priori for months under 12. Nadia then approves the commentary, and it goes to Graham Tolliver at Corbel.
“We ask Corbel to (1) charge the pre-1980 surcharge on every renewal from July 1, (2) send the year built for the 23 risks by June 26, and (3) meet us on June 24 to review rates under clause 9.3.”
- 10Decided
Re-price, chosen and signed
Nadia Whitfield · Head of Program BusinessThe capacity review sets out four options with UY2027 projections: continue as written (68.1%), re-price (60.8%), reduce the line to 60% (68.1% on $52.9M), or off-ramp, which is closed because clause 14.2 needs two months above 72.0%. Nadia chooses re-price: the pre-1980 surcharge on every renewal, +6% on Houston and Atlanta frame, pre-1980 capped at 22% of insured value. A clause 9.3 notice is drafted for Graham Tolliver, with new rates on renewals from August 16, 2026.
“The agents project; they do not choose. The decision, the reason and the notice are yours.”