- Before
- Runs training for 38 system operators in five crews at Harrow Ridge. “I know they're trained. Proving it task by task takes my team three weeks before every audit.”
- Now
- Opens the grid with every cell scored overnight, sees the gaps before the auditor does and books each one with its date.
One audit request, from the auditor's email to a released binder
Lumina Utilities runs the Harrow Ridge Control Centre, with 38 system operators — five crews of seven and three relief operators — against task list v14: 64 tasks in six areas. Granite Plains Reliability Council audits on site from 2 to 6 November 2026. It is Tuesday 13 October. Here is what happens next, screen by screen, in the working solution.
- 0106:00
The home screen is the proof itself
Hannah Lindqvist · Control-room training managerOperators run down the side by crew, the 64 tasks across the top by area, and each cell is verified, inside the six-month window or a gap. Overnight the agents read 412 new records from the learning system, simulator and document library, filed 409 to operator and task and set 3 course sign-ups aside. The grid reads 1,838 verified, 23 inside the window and 6 gaps — 98.4 % of 1,867 assignments.
06:03 · “New gap: Grace Whitfield, task 19 — check sheet CS-2026-0877 has no verifier signature”
- 02One click
RFI-07 asks for task 42 — the column lights up
Hannah Lindqvist · Control-room training managerYesterday at 15:40 the auditor, Dana Whitcombe, sent RFI-07: evidence verifying each system operator on task 42, “Shed firm load in a Level 3 energy emergency”, after its change on 14 May 2026 (PER-005-2 R2, R2.1). Hannah opens task 42 in the grid. Its record list reads 34 verified, 3 booked and 1 gap, and the window to re-verify closes on 14 Nov 2026.
“…the capability of each System Operator to perform task 42 … as modified, with dated records.” — Dana Whitcombe, auditor
- 03The gap
Malik Osei has a shift log entry, not a verification
Records readerMalik transferred from the Corran Vale backup centre. His only record for task 42 is LOG-2026-0911 of 11 Sep 2026, verified by nobody. Ethan Marsh, Priya Natarajan and Liam O’Rourke of crew D are already booked on SIM-2026-33; Malik is not.
“Why it is a gap. His only record for task 42 is a shift log entry: it says an event happened, not that a verifier assessed him against OP-118 rev 6.” (rule E-2)
- 04The record
The log page, with the reader's margin notes
Records readerThe record opens at the line: “M. Osei walked through OP-118 rev 6 load shed blocks with Y. Karim. No issues.” The margin notes say why it fails: an event, not an assessment; the initials “MO” are the operator's own, so Yusuf Karim did not sign as verifier. Name and date are present, after the 14 May change.
“The records reader checks the fields M2 asks for. Hannah Lindqvist decides what counts; changing a verdict needs a reason and is on the audit trail.”
- 05Booked
A simulator assessment, 17 days before the window closes
Hannah Lindqvist · Control-room training managerHannah books Malik on SIM-2026-33, Wed 28 Oct, 07:30–16:00 on the Harrow Ridge simulator with the rest of crew D: assessor Colm Brennan, verifier Yusuf Karim. The other choice on screen is a supervisor check sheet on shift on Thu 15 Oct. Malik and Yusuf are told by email and in the roster system.
“The booking is on the audit trail.”
- 06His record
Booked is not verified — the cell stays amber
Malik Osei · Transmission operator, crew DMalik's page shows 52 of 54 tasks verified, 0 gaps and 2 inside the window, and 24 of 32 hours of emergency operations training this year. His training history shows why: he was on annual leave for SIM-2026-24 in August, and the OP-118 rev 6 classroom briefing counts for delivery only.
“Task 42 booked … It stays amber until the signed record is filed.”
- 07The binder
46 pages, in the order the audit worksheet asks
Evidence binder builderThe binder builder matches RFI-07 to R2 and R2.1, collects 38 operator records for task 42, checks each against M2 and adds the dated task list v14 with change record MOC-2026-07. It writes the response narrative and bookmarks every page at the line naming the operator, task and verifier. The four open verifications are in the binder on pages 39–42, each with its booking.
“Open items are disclosed with their dates, never left out.”
- 08Release
Only the compliance lead releases to the auditor
Marcus Adeyemi · Reliability compliance leadHannah sends the binder to Marcus with a note: 34 verified; Ethan, Priya, Liam and Malik are on SIM-2026-33 on 28 Oct, before the 14 Nov window closes. Marcus reviews it, and only he can release it to Granite Plains Reliability Council. RFI-07 is due Fri 23 Oct.
“Nothing leaves Lumina until Marcus Adeyemi releases it.”
- 09Tonight, 19:00
Tonight's crew, checked against its desks
Tomás Reyes · Shift supervisor, crew CLine L-3417 Harrow Ridge–Ashby 345 kV comes out at 22:30 under switching order SO-26-1184, on Grace Whitfield's desk — and her task 19 check sheet is unsigned. The coverage checker suggests Hugo Lindahl, verified on task 19 (CS-2024-1765), takes the switching order and Grace monitors Transmission South. Tomás decides.
“The agent advises; Tomás Reyes decides who works which desk.”
- 10Waiting for Hannah
A new procedure revision — modification or rewording?
Task list keeperOP-131 rev 2, on voltage collapse actions, was published on 6 Oct. The task list keeper shows the difference: operators now act on a second trigger, within 5 minutes. If Hannah treats it as a modification to task 45, all 38 operators must be re-verified by 6 Apr 2027; rewording alone is not a modification.
“The agent proposes; the training manager decides.”