WorkflowGrid Operations & Outage Management

Planned Outage Management

Planned outage management that never approves an outage while its backup feed is out, and tells every customer in time

No outage approved while its backup feed is out, and every customer told in time.

See one case, screen by screen ↓
demo1,284customerswould have lost power instead of 412 had the Marsh Lane outage gone ahead on the day its backup feeder was out — caught the moment it was dropped
target0planned outages approved while their backup feed is out
target100%of medically dependent customers called before their outage
estimated$0.6M a yearin cancelled-outage costs avoided — 2,400 outages × 8 % cancelled late × half caught at planning × $6,200 each
The problem

Why a planned outage gets cancelled the day before

Maintenance, capital projects, new connections, tree cutting and water-main work all ask for outages, 40 to 60 a week. Each one needs a backup feeder to carry the customers outside the section being worked on, must not lean on the same normally-open point as another job, needs its crew free, must stay clear of event embargoes and weather warnings, and must give every affected customer notice inside the rules. Coordinators hold all of that in spreadsheets, a wall planner and the control engineer's memory.

So conflicts surface late. An outage is approved on a feeder whose backup is already out for another job, and the control room finds it the day before. The outage is cancelled, the jointing crew and kit are stood down, and every customer who was written to is written to again. Or it goes ahead on the wrong assumption, and a 412-customer outage becomes a 1,284-customer one, with medically dependent customers on the wider section who were never on the call list.

typical£35 / £70paid to each domestic / non-domestic customer in Great Britain when planned-work notice is under 2 days
typical4business daysof written notice a registered life-support customer must get before a planned interruption under Australia's National Energy Retail Rules
Where a coordinator's planning hours go each weekestimated
By hand31 days
With the solution7.5 days
  • Reading requests from emails, work orders and the connections portal6 → 1.5 d
  • Checking each outage's backup feed and spare capacity on its day8 → 2 d
  • Finding overlapping outages, shared open points and double-booked crews4 → 1 d
  • Building customer lists and matching the priority care register5 → 1 d
  • Checking events, road closures and weather warnings2 → 0.5 d
  • Drafting letters, texts and call lists against the notice clock6 → 1.5 d

Estimated split for one coordinator placing 40–60 outage requests a week, in hours, by hand and with the solution.

How it works

How an outage request moves

Six specialist agents check every outage the moment it lands on a date; the outage coordinator approves.

What comes in
Requests in40–60 a week · maintenance, projects, connections, water
Agents at work
Request readerwhat the work needs
Then
Network checker
Clash finder
Customer impact finder
Event and weather watcher
Then
Notice writerpost-by clock
A person decides
Outage coordinatorapproves, moves or returns
What comes out
Clash-free plan
Conflicts with first clear day
Letters, texts and calls
One case, step by step

One ring main unit swap, from an email to letters ready to post

Lumina Utilities is planning the week of Monday 19 October across Harrow Vale, Kingsmere and Saltmarsh primary substations and the Ridgeway water supply zone. It is Tuesday 13 October, 10:20, and next week's letters must post by Wednesday 14 October at 16:00. Here is what happens to one request, screen by screen, in the working solution.

  1. 01Tuesday 10:20

    The week on one chart, by substation and feeder

    Leila Moreno · Outage coordinator

    Leila's plan shows 12 outages and 1,980 customers and properties off, with 5 requests to schedule and 1 conflict. A lane across the top carries the Quarry Road closure on Thursday, an amber wind warning on Friday, the cup semi-final and the half marathon. The one red bar is OR-26-0416, the Hollins Park reconductor, which the event and weather watcher has already flagged.

    “Event and weather watcher read the amber wind warning for Fri 23: OR-26-0416, overhead work on KM-07, must move”

  2. 02Read at 09:40

    Tom's email, read into nine fields

    Request reader

    Tom Brennan's email of 12 Oct 16:41 asks to replace the Lucy-type ring main unit at H47 on Marsh Lane, which failed its partial discharge survey on 2 Oct. The request reader fills the asset, work, dates, times, crew, section off, backup, kit and requester, each cited to the sentence it came from: 08:00–14:00, Ashby Jointing crew B, 412 customers off between RMU-H46 and RMU-H48, back-fed from HV-14 Quarry Road through NOP-1214 at 3.9 MVA.

    One assumption flagged: “Back-feeds the rest from Quarry Road” assumes HV-14 is in service on the day.

  3. 03Picked up

    Every day on the row lights up before she drops it

    Leila Moreno · Outage coordinator

    Leila picks OR-26-0418 from the tray and the HV-12 Marsh Lane row lights up. Monday and Tuesday: Harrow Vale is on one transformer while T2 is overhauled. Wednesday: amber, 4 medically dependent customers and 412 customers off. Thursday: the backup feeder is out. Friday to Sunday: Ashby Jointing crew B is not free.

    “Thu 22 Oct — Backup feeder HV-14 Quarry Road is out”

  4. 04Dropped on Thursday

    A red bar, linked to the outage that causes it

    Network checker

    Thursday is one of the two days the crew prefers, so Leila drops it there. The six checks rerun in the side rail and the bar turns red, with a red link to OR-26-0409: Hamid Rezaei's cable diversion for the Kingsway Metro station takes HV-14 out from 07:00 to 17:00. NOP-1214 has nothing to close onto, and the only other tie, HV-13 Orchard Rise, already carries 1.8 MVA of HV-14's load, leaving 0.3 MVA spare against 3.9 MVA needed.

    “Can't go on Thu 22 Oct. Backup feeder HV-14 Quarry Road is out. Without it, 1,284 customers would be off for 6 hours instead of 412, and 11 medically dependent instead of 4.”

  5. 05The reason

    Backup headroom, feeder by feeder, day by day

    Network checker

    The backup feeds view shows the spare capacity on every feeder's backup for the week, after every approved outage, from network model HV-NM 2026.10.2. HV-12 Marsh Lane needs 3.9 MVA to HV-14: 4.9 MVA spare on most days, 0 on Thursday. The Harrow Vale one-line diagram for Thursday shows HV-14 out and NOP-1214 open with nothing behind it.

    “Thursday: HV-14 is out all day for OR-26-0409 … HV-12 has no backup that day: NOP-1214 has nothing to close onto.”

  6. 06Moved to Wednesday

    The first clear day, with actions

    All six agents

    One click moves it to Wed 21 Oct, the first clear day. HV-14 takes 3.9 MVA through NOP-1214, with 4.9 MVA spare against 4.29 MVA needed with the 10 % margin. Both transformers are in service, no other outage uses the open point, crew B is free and there is no event, closure or warning near Marsh Lane. One amber remains: 4 medically dependent customers — a home ventilator, two oxygen concentrators, home dialysis — and Marsh Lane Primary School, 312 pupils.

    “Clear, with actions · 4 medically dependent customers · 412 customers off”

  7. 07Approve

    What she approves, and what stays with others

    Leila Moreno · Outage coordinator

    The approval shows the outage, its date and hours, 412 customers off and the backup through NOP-1214, and the open actions handed to the notice writer. It also says what the approval does not do: the switching stays with network control, and nothing reaches a customer until the communications lead releases it.

    “Network control writes and runs the switching from this plan. Nothing is sent to customers until Grace Whitlow releases the notices.”

  8. 08Approved

    Letters, texts, calls and a generator, drafted

    Notice writer

    The bar turns green on Wednesday. The notice writer drafts 412 letters, 386 texts and 241 emails to post by Wed 14 Oct 16:00, books 4 priority care calls and generator MG-07 for the home ventilator at 23 Heron Close, and writes a letter to the school. Everything waits for release.

    “Notices drafted · waiting for Grace Whitlow to release.”

  9. 09Before release

    Who is off, who needs a call, and what they will read

    Grace Whitlow · Customer communications lead

    Grace sees the four medically dependent customers with what each needs power for and the action — generator on site and a call for E. Barlow, a call 48 hours before for the other three. The school gets its own letter and a call: kitchen and heating off 08:00–14:00. Five streets, 412 customers, 386 with a mobile number, and the plain-English letter and text beside them.

    Letter: “If you rely on power for medical equipment and have not told us, call us on 0800 555 0142 so we can help.”

  10. 10The clock

    Every notice on its clock

    Grace Whitlow · Customer communications lead

    On the notices list, OR-26-0418 shows Drafted with its clock at “tomorrow”: letters post by Wed 14 Oct. The other outages of the fortnight sit beside it, sent or drafting when approved, with their channels and calls. Grace releases them; every step, by agent and by person, is already on the append-only decision log.

    “Letters post by 16:00 on the post-by day · texts and emails go at 09:00 the next morning · regulatory floor: 2 days”

Who it’s for

Built for everyone who touches a planned outage.

The same Marsh Lane outage, seen by the five people who request it, plan it, switch it and tell its customers — what their week looked like, and what it looks like now.

LM
Leila MorenoOutage coordinator, Harrow Vale and Kingsmere · approves, moves and returns outages
Outage coordinator
Before
Places 40–60 outage requests a week and builds next week's plan by Wednesday so letters can go out. “I find out the backup feeder is out when the control room rings me on the morning.”
Now
Sees every day on a feeder's row light up green, amber or red before she drops an outage, and the reason and first clear day the moment it lands.
TB
Tom BrennanMaintenance planner, Harrow Vale depot · requests outages
Maintenance planner
Before
Books jointing crews and kit a month ahead. “Every time an outage moves, I lose the crew.”
Now
Sends his request by email as he always has; it is read into fields, checked against his crew's free days and placed on a day that will hold.
HR
Hamid RezaeiProject engineer, Kingsway Metro connections · requests outages
Project engineer
Before
Needs cable diversions done on the contractor's dates. “The tunnel contractor only has the road closure on Thursday.”
Now
His diversion keeps its Thursday, with the Quarry Road closure on the plan, and any job that needs HV-14 as its backup that day turns red the moment it is dropped.
GW
Grace WhitlowCustomer communications lead · releases notices
Customer communications lead
Before
Sends the letters, texts and calls for every outage. “If a letter goes out late, I'm the one on the phone to the ombudsman.”
Now
Gets letters, texts, emails and priority care calls drafted the moment an outage is approved, each with its post-by clock, and releases them.
OC
Owen CastellControl engineer, network control · writes and runs the switching
Control engineer
Before
Owns the N-1 call on the day. “Don't give me two outages that need the same open point.”
Now
Receives a plan in which no two outages rely on the same normally-open point on the same day, and every backup has its headroom checked.
Built on the engine

6 agents. Each with one job, and hard limits.

Six specialist agents check every outage the moment it lands on a date; the outage coordinator approves.

Request reader

Reads each outage request — form, email, work order or project programme — into asset, feeder, section to be made dead, preferred dates, hours on site, crew and the switching the requester assumes, citing every field to the sentence it came from.

  • Never changes a requested date
  • Never approves or schedules
  • Flags any assumption about the network on the day
Network checker

Works out the customers in the section off and the load to transfer, finds the backup feeder and its normally-open point, subtracts every other outage that day, checks the margin and checks the primary still has both transformers.

  • Never writes or runs switching — the control engineer does
  • Never approves a deviation from the backup rule
Clash finder

Finds any outage on the same feeder in the same hours, any other outage that needs the same open point, and any crew booked elsewhere, naming the outage and the time.

  • Never cancels or moves another outage
Customer impact finder

Lists every customer in the section by street, matches them to the priority care register with what each relies on, and lists schools, surgeries, care homes and pumping stations; if the backup is lost, gives the whole-feeder list.

  • Never contacts a customer
  • Register data is visible to outage planning and customer communications only
Event and weather watcher

Every morning and on every placement, reads the councils' events lists, highways permits, school calendars and national weather warnings, matches them to the feeders they touch, and applies the event embargo and the wind rule.

  • Never overrides an embargo
Notice writer

Computes the post-by date from the notice rules and drafts the letter, text and email in plain English, builds the call list for medically dependent customers, books a generator for life-sustaining equipment and drafts letters for sensitive sites.

  • Never sends without the coordinator's approval and the communications lead's release
  • Plain English only
Outage coordinator

Approves; communications lead releases notices. The agents propose; a named person decides.

Ask in plain words

Ask about any outage, feeder or customer list

Ask about any outage, feeder, customer list or notice — or say what to prepare. Every answer points to its records.

Why can't OR-26-0418 go on Thursday?

On Thursday its backup is gone. The Marsh Lane job back-feeds 872 customers from HV-14 Quarry Road through NOP-1214, a 3.9 MVA transfer. But HV-14 is out all day for OR-26-0409, the Kingsway Metro cable diversion, and HV-13 is already carrying 1.8 MVA of HV-14's load. So all 1,284 customers on HV-12 would be off for 6 hours, with 11 medically dependent instead of 4. The first clear day is Wed 21 Oct; letters must post by Wed 14 Oct 16:00.

Which outages does Friday's wind warning put at risk?

One: OR-26-0416, the overhead reconductor on KM-07 Hollins Park, 318 customers off, Fri 23 Oct 09:00–15:00. Rule 7 moves overhead work off an amber wind day. OR-26-0402 on Station Road is overhead too, but Harrow Vale is outside the warning area. Northfold's crew is free Mon 26 Oct, and the letters would still be in time.

Draft the notices for OR-26-0418

They are drafted: 412 letters, 386 texts and 241 emails for Wed 21 Oct, 4 priority care calls, generator MG-07 for 23 Heron Close and a letter to Marsh Lane Primary School. They wait for Grace Whitlow to release them.

Every screen

The working solution, as it ships.

13 screens from the working solution, on its sample data. Pick one to see it large.

The outage planEvery planned outage for the week on one chart by substation and feeder, with events and weather across the top, the requests to schedule and the plan checks.
Outage requestsEvery request waiting for a date, by origin, and one email read into fields with each one cited and an assumption flagged.
Pick a dayPicking up a request lights every day on its feeder green, amber or red, with the reason for each.
A conflict, the moment it landsThe outage dropped on Thursday turns red, linked to the outage that takes its backup feeder, with the customers it would add and the first clear day.
Backup feedsSpare capacity on each feeder's backup, day by day, after every approved outage, and the one-line diagram for the selected day.
Clear, with actionsOn the first clear day every check passes, with the medically dependent customers and the school as actions.
ApproveThe outage, its backup and the actions handed to the notice writer; switching and release stay with the people who own them.
ApprovedThe outage on its day in green and the notices drafted, waiting for the communications lead to release.
Affected customersMedically dependent customers with what they need power for, sensitive sites, the streets and the plain-English letter and text.
NoticesEvery customer notice for the fortnight with its channels, post-by date, clock and status.
Events, weather and embargoesRoad closures, weather warnings, public events and school holidays, with the outages each one touches and its source.
Decision logWho decided what and when, agents and people, with the checks behind it — append-only and exportable.
Rules and settingsBackup margin, network rules, event and weather rules, notice periods and the people who approve, switch and release.
Governance

Built for the network: checked, approved, on the record.

Every check cites its sourceEach finding names what it rests on: the network model version, the outage it conflicts with, the priority care register entry, the events listing or weather warning, and the rule that applies.
The coordinator decidesAgents check, compute and draft. The outage coordinator approves, moves or returns every outage, and a conflict offers a move to the first clear day, not an approval.
A second approver for big or unusual outagesOutages with more than 1,000 customers off, or any deviation from the backup rule, also need the network operations manager's named approval. OR-26-0409, which back-feeds 1,226 customers, carries Marcus Hale's second approval.
Switching stays with network controlNo agent writes or runs switching. The control engineer writes and runs it from the approved plan and owns the N-1 call on the day.
Medically dependent data kept closeThe priority care register is visible to outage planning and customer communications only, and no agent contacts a customer. Nothing is sent until the communications lead releases it.
An append-only decision logEvery agent finding and every human decision — who placed, approved, released and when, with the checks behind it — is recorded in a log that can be filtered and exported, never edited.
Configuration

Your network and notice rules, not ours

What the checks test and who decides are settings, owned by the network operations manager — here, rules version 9, approved on 1 Sep 2026.

SettingDefaultChoose from
Backup headroom margin10 %0–30 %, set with − and + · spare capacity the backup must keep above the transfer
Feeder work at a primary on one transformerBlockedBlocked · Warned, control approves
Shared normally-open pointsOnOn · Off — two outages may not rely on the same open point on the same day
More than 1,000 customers off — second approverMarcus HaleMarcus Hale, network operations manager · Owen Castell, control engineer
Event venuesOnOn · Off — no work on a feeder serving a venue from 4 h before to 2 h after an event
Overhead work under an amber wind warningMovedMoved · Warned — underground work is not affected
School exam daysOnOn · Off — from the councils' calendars
Notice periodsHomes 5 working daysBusinesses 10 working days · medically dependent: letter + call 48 h before · schools, surgeries, care homes 10 working days · water low pressure 2 working days · regulatory floor 2 days
Connections

Works with the systems an outage plan already runs on

Outage requestsrequest emails, work orders, the connections portal and project programmes
Network modelfeeders, sections, normally-open points, backup capacity and load history
Crew calendarsyour own crews and contractors, with the days each is free
Customer system and priority care registercustomers by section and street, and who relies on power or water for medical equipment
Events, permits and warningscouncil events lists, highways permits, school calendars and national weather warnings
Letter, text and email servicescustomer notices, priority care calls and generator bookings
What it changes

The difference, in numbers.

Every figure is labelled: a target the solution is built to, an estimate, a typical published result, or a proven one.

target
0
planned outages approved while their backup feed is out
Found by controlthe day before
With agentson the drop
estimated
$0.6M
a year in cancelled-outage costs avoided
192 cancelled late96 caught at planning
target
100%
of medically dependent customers called before their outage
4 of 4 called
Marsh Lane, Wed 21 Oct

“demo” = seen in the working solution, on its sample data · “target” = the design goal, measured in the live solution · “estimated” = our estimate: 2,400 planned outages a year × 8 % cancelled inside 48 hours × half of them caught at planning × $6,200 per cancellation (a four-person jointing crew for a day plus generator, traffic management and re-notification), demo assumptions that a pilot replaces with your own; the hours split is estimated too · “typical” = published rules: Electricity (Standards of Performance) Regulations 2015, reg. 12 (£35 domestic, £70 non-domestic when planned-work notice is under 2 days); National Energy Retail Rules, Part 7 (4 business days' written notice for registered life-support customers). Context: NERC IRO-017-1 Outage Coordination. Lumina Utilities, its substations, feeders, contractors, events and customers are fictional, and people named on this page are characters in the working solution.

Questions

What outage planners ask us.

What is planned outage management software?

Software that takes planned outage requests from maintenance, projects, connections and water teams, schedules them, checks each against the network and the plan, and tells the affected customers in time. Planned Outage Management puts every outage on one chart by substation and feeder, and six agents check each one the moment it lands on a date; the outage coordinator approves.

How does it check the backup feed and N-1 for a planned outage?

The network checker finds the section to be made dead, the load to transfer and the backup feeder with its normally-open point, then subtracts every other outage that day and checks the spare capacity against the transfer plus the margin, 10 % by default. It also checks the primary still has both transformers. If the backup is out, it says which outage takes it and how many customers would then be off.

How does it find clashes between planned outages?

The clash finder looks for any outage on the same feeder in the same hours, any other outage that needs the same normally-open point on the same day, and any crew booked twice. The event and weather watcher adds road closures, event embargoes, school calendars and weather warnings. A conflict shows as a red bar with the reason and the first clear day.

How does it protect medically dependent customers during a planned outage?

The customer impact finder matches every customer in the section to the priority care register and says what each relies on — in the sample case a home ventilator, two oxygen concentrators and home dialysis. The notice writer builds the call list for 48 hours before and books a generator for life-sustaining equipment. If the backup is lost, the list widens to the whole feeder, so nobody is missed.

Does it keep planned outage notices inside the notice period?

The notice writer computes each outage's post-by date from your notice rules — in the sample, 5 working days for homes and 10 for businesses, with a 2-day regulatory floor — and drafts letters, texts and emails as soon as the outage is approved. Every notice shows its clock on one list, and nothing is sent until the communications lead releases it.

Does it work for water shutoffs as well as electricity?

Yes. Water supply zones sit on the same chart as electricity feeders, with their districts and boundary valves. In the sample, a trunk main valve replacement at Beacon Hill re-zones supply from Millbrook and sends bottled water to two home dialysis customers.

Do people stay in control of the outage plan?

Yes. The agents read, check and draft; they never approve, move another outage, write switching, override an embargo or contact a customer. The coordinator approves, outages over 1,000 customers off need the network operations manager too, the control engineer runs the switching, and the communications lead releases the notices.

How long does it take to go live?

The Agentic Solution Engine builds and deploys it from your requirements and documents — your network rules, notice rules, letter templates, crew calendars and a sample of past outage requests — and it goes live once every quality gate has passed. We will walk you through it on a week of your own outages first.