SystemGrid Operations & Outage Management

SAIDI and SAIFI Reliability Reporting

SAIDI and SAIFI reliability reporting with every outage record proved against the meters and every major event day justified

Clean reliability indices, ready for the regulator.

See one case, screen by screen ↓
demo48.0minSAIDI excluding major event days once 19 Aug is marked — 3.0 minutes inside the 51.0-minute regulator target to 30 Sep, with the all-days 61.0 reported beside it
target100%of major event day exclusions carry their 2.5 beta calculation, weather and crew evidence and record checks
demo1.2minof the year's SAIDI carried by 9 bad outage records on one storm day, found against the meters before they counted
target2daysto a drafted quarterly reliability report, not 3 weeks of reconciliation
The problem

Why the reliability filing still takes three weeks of reconciliation

SAIDI and SAIFI reliability reporting turns a period's outage records into the numbers the regulator sees: how long the average customer was without power (SAIDI), how often (SAIFI) and how long each interruption lasted (CAIDI), with and without major event days. Those records come from the outage management system, typed by dispatchers in the middle of storms. Duplicates, 23:59 placeholder restore times, start times taken from the first customer call, customer counts from the wrong transformer and three-minute interruptions logged as sustained all land in the index.

Before each filing a reliability engineer reconciles thousands of records in spreadsheets, works out the major event day threshold in a workbook and writes the justification by hand. Major event day exclusions are the biggest single lever on the reported number, so the regulator scrutinises each one, and an exclusion without its calculation and evidence is a finding. The smart meters already record the minute each customer lost and regained power, but no one has time to match them to the record.

typical11hoursof interruptions for the average US customer in 2024, nearly 9 of them from major events
typical2hoursa year, roughly, of US outage time without major events — so a minute of bad data is a real share of the number
typical2.3daysa year: the major event days the 2.5 beta method is designed to flag, though real counts vary
Where a quarter's reporting days go, in working daysestimated
By hand15 days
With the solution2 days
  • Exporting outage records and pulling meter events2 → 0.2 d
  • Reconciling records against the meters — duplicates, restore and start times6 → 0.5 d
  • Checking customer counts and cause codes2 → 0.3 d
  • Computing the indices and the major event day threshold2 → 0.1 d
  • Writing the major event day justification and the report3 → 0.9 d

Estimated split for one quarterly reliability report at a distribution utility, in working days, by hand and with the solution.

How it works

How a reporting period closes

Six agents check every outage record against the meters, set the major event day threshold and draft the report; a reliability engineer decides.

What comes in
Data in4 sources · outage records, meter events, customers, weather
Agents at work
Outage record checkermeters vs records
Customer count checkerconnectivity model
Cause code checkercrew close-out notes
Then
Index calculatorIEEE 1366
Then
Major event day assessor2.5 beta · 4.08 min
Then
Report writercited draft
A person decides
Reliability engineeraccepts fixes, marks major event days
What comes out
SAIDI, SAIFI, CAIDI
Justified exclusions
Signed regulator report
One case, step by step

One storm day, from the outage records to a filed Q3 report

Lumina Utilities serves 1,284,600 electricity customers on 1,146 feeders across five regions. Its Q3 2026 reliability report is due to the Regional Energy and Water Commission (REWC) on 31 October. On 19 August a line of thunderstorms crossed Harbour and Eastern Hills. Here is what happens next, screen by screen, in the working solution.

  1. 01Morning, 18 days to file

    The calendar opens on the day that needs a decision

    Nadia Rahman · Reliability engineer

    Nine months sit on one reliability calendar, each day coloured by customer minutes lost. Year-to-date SAIDI excluding major event days is 62.2 minutes, 11.2 over the 51.0-minute target to 30 September. Last night's run put one day at the top: Wed 19 Aug, 14.2 minutes, 3.5 times the major event day threshold, with 9 record exceptions that change its minutes.

    “Overnight run 02:10 · 6 agents · ready 02:40”

  2. 02Overnight

    Every outage record proved against the meters

    Outage record checker

    The checker has matched 2,671 records this year to 41.6 million meter events. On the storm day it found three duplicates, each one interruption logged twice, and three restore times the meters disprove. OUT-26-48233 on feeder breaker CB-31 shows a 23:59 placeholder left open when the crew moved on; 1,846 of 1,902 meters report power back between 17:41 and 17:47, so it proposes 17:44.

    Not trying to lower the number: EX-0818 moves a start time from the first customer call at 15:40 to the last-gasp messages at 15:12 — it adds 28 minutes.

  3. 03One click

    Nine fixes accepted, the indices recomputed

    Nadia Rahman · Reliability engineer

    Nadia accepts the 9 fixes. The customer count checker had found transformer T-55810 serves 148 meters, not the 412 customers taken from T-55801, and a 2 min 55 s operation on recloser R-2251-3 comes out of SAIDI and SAIFI as momentary. The day goes from 218 to 214 interruptions, 104,374 to 98,900 customers and 14.2 to 13.0 minutes; year-to-date SAIDI falls from 62.2 to 61.0.

    “Run by the record checker and index calculator · accepted by Nadia Rahman”

  4. 04Set on 2 January

    The threshold, from five years of daily SAIDI

    Major event day assessor

    The 2026 threshold comes from 1,811 days with interruptions in 2021–2025, with 15 days with none left out. The mean of ln(daily SAIDI) is α = −1.622 and the standard deviation β = 1.211, so T_MED = e^(α + 2.5β) = 4.08 minutes, fixed for the year. Only 10 of the 1,811 days were above it; earlier years flagged 2 to 4 major event days each.

    “A day in 2026 whose daily SAIDI is above 4.08 minutes is a major event day.”

  5. 05The decision

    19 August marked a major event day

    Nadia Rahman · Reliability engineer

    At 13.0 minutes the day is 3.19 times the threshold, and Nadia marks it. The assessor counts 37 interruptions that ran past midnight to 19 August, the day they began, and gathers the weather and crew evidence. SAIDI excluding major event days falls from 61.0 to 48.0 minutes, SAIFI from 0.742 to 0.665 and CAIDI from 82.2 to 72.2 — now 3.0 minutes inside the target.

    “Major event day · excluded from the indices excluding major event days; kept in the all-days figures.”

  6. 06The day file

    The justification note, with its six sources

    Major event day assessor

    The day file shows the storm hour by hour, from 13:00 on 19 August to the last restore at 06:10 the next morning, the largest interruptions with the crew's cause, and the threshold test. The evidence is cited: the Cape Lumen weather station with gusts of 96 km/h at 14:20, 1,240 lightning strikes, 31 Lumina crews and 12 from Tasman Line Services, and the 9 accepted record corrections.

    “Before the test, each outage record for the day was checked against smart meter power-off and power-on events, and 9 corrections were accepted, which moved the day from 14.2 to 13.0 minutes.”

  7. 07A second try

    A heatwave day below the threshold stays in

    Major event day assessor

    On Sat 2 May a heatwave overloaded transformers in Central and Riverside: 61 interruptions, 31,240 customers, 3.91 minutes of daily SAIDI — 0.96 times the threshold. Asked to exclude it, the assessor refuses and says why. The day counts in every index, and can be described in the report narrative instead.

    “2 May cannot be excluded. Its daily SAIDI of 3.91 min is below the 2026 threshold of 4.08 min.”

  8. 08Outside the storms

    The feeders that really lose the minutes

    Nadia Rahman · Reliability engineer

    Ranked by customer minutes excluding major event days, F-1102 Harbour Road 3 leads with 1,290,486, a feeder SAIDI of 253 minutes, 3,164 customers with three or more interruptions and equipment failure as the top cause. F-3108 Cape Lumen, first on all days, drops to fifteenth once the storm is set aside. Nadia sends F-1102 to the November capital planning review with its year.

    Feeder F-1102: “214,000 customer minutes on the 19 Aug storm (major event day candidate).”

  9. 09The draft

    The Q3 report, both index sets, every number cited

    Report writer

    The report writer drafts the Q3 2026 report in the REWC template: summary, method, major event days, data quality, worst-performing feeders, notable events and Appendix A with the justification note. It shows 61.0 minutes across all days and 48.0 excluding major event days, against 51.0. The data-quality section records 2,667 sustained interruptions and 50 corrections accepted this year; source records are unchanged.

    “Drafted 13 Oct 02:40 · every number links to its source · re-drafts when a record changes”

  10. 10Signed, then filed

    Graham signs, with the meaning of his signature; Leah files

    Graham Oyelaran · Head of Network Performance

    Graham opens the signature with SAIDI excluding major event days at 48.0 minutes and 1 major event day, 19 August, in front of him. He signs as Head of Network Performance on 21 Oct at 09:14. Leah Fontaine in regulatory affairs files with the REWC and gets receipt REWC-RR-2026-Q3-0417.

    Meaning of signature: “I have reviewed the indices, the major event day exclusions and their justification, and approve this report for filing.”

Who it’s for

Built for everyone who stands behind the reliability number.

The same Q3 report, seen by the four people who own it — what their quarter looked like, and what it looks like now.

NR
Nadia RahmanReliability engineer, Network Performance · accepts record fixes and marks major event days
Reliability engineer
Before
Owns the quarterly and annual reliability filings, with three weeks of reconciliation each quarter. “I trust the index. I don't trust the 214 records under it.”
Now
Opens the calendar on the one day that needs a decision, accepts each fix with its meter evidence, and marks a major event day with the calculation already attached.
GO
Graham OyelaranHead of Network Performance · signs the filing and approves the year's threshold
Head of Network Performance
Before
Signs the filing and answers to the COO for the performance scheme. “If we exclude a day, I want the reason on one page.”
Now
Reads one day file per exclusion — threshold test, evidence, justification note — and signs with the meaning of his signature recorded.
LF
Leah FontaineRegulatory Affairs Manager · files with the REWC and answers its data requests
Regulatory Affairs Manager
Before
Files with the REWC and fields its data requests. “The Commission re-runs our numbers. They must come out the same.”
Now
Files a report where every number links to its source and the threshold calculation can be exported for the Commission to re-run.
TR
Tomás ReyesDistribution Control Manager · his dispatchers create the outage records
Distribution Control Manager
Before
Runs the control room through every storm. “In a storm we log first and tidy later. Later never comes.”
Now
Sees the checks on his team's records — the duplicate, the placeholder restore, the late start — with the meter evidence, and can comment on each.
Built on the engine

6 agents. Each with one job, and hard limits.

Six agents check every outage record against the meters, set the major event day threshold and draft the report; a reliability engineer decides.

Outage record checker

Matches every outage record to the smart meters' power-off (last gasp) and power-on events and to breaker operations, within ±10 minutes; finds duplicates, wrong restore and start times, and momentary interruptions logged as sustained, and proposes each fix with its meter evidence.

  • Proposes a fix only when at least 80% of the meters on the device agree
  • Never edits the outage management system or any source record
  • A fix counts only when the reliability engineer accepts it
Customer count checker

Counts the active meters below each device in the meter-to-transformer connectivity model at the time of the outage and checks them against the customers interrupted on the record.

  • Flags a difference of more than 5%
  • Flags only — never changes the connectivity model
Cause code checker

Reads the crew close-out notes and, where a note names a different cause, proposes the code from the cause list and quotes the note — “tree limb on phase B, span 14–15, cleared” becomes Vegetation.

  • Proposes; a person accepts every cause change
Index calculator

Computes SAIDI, SAIFI, CAIDI, MAIFI and CEMI-3 to IEEE 1366 from accepted records, all days and excluding major event days, by region, feeder and cause, and recomputes on every accepted change.

  • Deterministic arithmetic only — no estimation
  • Sustained means longer than 5 minutes; each interruption counts to the day it began
Major event day assessor

Builds five years of daily SAIDI, computes α, β and the threshold by the 2.5 beta method, flags the days above it, gathers weather station, lightning and crew log evidence and drafts each justification note with citations.

  • Never excludes a day itself — the reliability engineer decides
  • Refuses any day below the threshold
Report writer

Drafts the quarterly and annual reliability reports and the major event day appendix in the REWC template — summary, method, major event days, data quality, worst feeders, notable events — with every number cited.

  • No number without a source
  • Never files — the Head of Network Performance signs and regulatory affairs files
Reliability engineer

Accepts every fix and every exclusion. The agents propose; a named person decides.

Ask in plain words

Ask about any day, feeder or exclusion, in plain words

Ask about any day, feeder, index or exclusion — or say what to change. Every answer points to its records.

Is 19 August a major event day?

Yes, it qualifies. After the 9 record fixes its daily SAIDI is 13.0 min, against the 2026 threshold of 4.08 min — 3.2 times over. 214 interruptions, 98,900 customers, thunderstorms with 96 km/h gusts. Marking it takes SAIDI excluding major event days from 61.0 to 48.0 min, inside the 51.0 target; the all-days 61.0 stays on the report beside it.

Can we exclude 2 May as well?

No. 2 May had a daily SAIDI of 3.91 min, below the 2026 threshold of 4.08 min. IEEE 1366 treats a day as a major event day only above the threshold, so the heatwave counts in every index. You can describe it in the report narrative instead.

Which feeders lose the most minutes outside storms?

Excluding major event days: F-1102 Harbour Road 3, 1,290,486 customer minutes, mostly equipment failure; F-5071 Weir Lane, 1,283,210; F-4430 Millbrook North, 914,008. Together that is 2.7 min of the system's SAIDI.

Add the 2 May heatwave to the report narrative

Added to section 6 of the Q3 draft: “On 2 May a heatwave overloaded distribution transformers in Central and Riverside: 61 interruptions, 31,240 customers, 3.91 minutes of system SAIDI.” It is counted in every index; section 3 says so.

Every screen

The working solution, as it ships.

13 screens from the working solution, on its sample data. Pick one to see it large.

The reliability calendarNine months of daily SAIDI on one calendar, the year-to-date indices against the target, the day that needs a decision and the feeders losing the most minutes.
Record checksEach exception with what the record says, what the meters or crew say, the proposed fix and its effect on the minutes.
Fixes acceptedThe storm day after 9 fixes — 13.0 minutes, 98,900 customers — and the run that recomputed the indices.
The major event day thresholdThe 2.5 beta calculation from 2021–2025 daily SAIDI: α, β, the 4.08-minute threshold and major event days by year.
A major event day marked19 August excluded from the indices excluding major event days, SAIDI 48.0 against 51.0, with the assessor's evidence steps.
The day fileThe storm hour by hour, the largest interruptions, the threshold test, the cited evidence and the justification note.
Below the thresholdThe 2 May heatwave at 3.91 minutes cannot be excluded; it counts in every index, with the reason on screen.
Worst-performing feedersFeeders ranked by customer minutes, all days and excluding major event days, with feeder SAIDI, CEMI-3, top cause and the year.
By region and causeMinutes of system SAIDI by region and cause, and SAIDI through the year against the regulator's target.
The Q3 reliability reportThe draft in the regulator's template, both index sets side by side, every number linked to its source.
Sign the reportThe Head of Network Performance signs with the meaning of the signature, the exclusions in front of him.
Filed with the regulatorThe report filed with the REWC, record checks complete and one major event day justified, with its receipt.
Your methodThe major event day method, the reporting day, meter matching, targets and who decides.
Governance

Built for the regulator: every number traced, every exclusion justified.

Every number links to its sourceEach figure in the report links to the records and calculation behind it — the index calculator's interruptions, the threshold's α and β, the justification note, the record checks, the feeder ranking. Every fix carries its meter evidence.
Named people decide and signAgents propose. Only a reliability engineer accepts a record fix or marks a major event day; only the Head of Network Performance signs, with the meaning of the signature recorded; only regulatory affairs files with the REWC.
A day below the threshold cannot be excludedThe major event day assessor refuses any day whose daily SAIDI is at or below the threshold and says why. Record exceptions that change a day's minutes must be accepted or rejected before the day can be marked.
Source records never changeThe outage management system and the connectivity model are read, never edited. Corrections are kept beside the source record, with who accepted them and when, and the report says so.
One threshold for the yearThe threshold is set from five years of daily SAIDI at the start of the reporting year — 2 January in 2026, approved by the Head of Network Performance — and stays fixed for the year.
Every step on the activity trailEach agent step and each human decision — who accepted a fix, who marked or undid a major event day, who sent the report for signature, who signed and filed — is recorded with its time. The calculation and the daily series export for the regulator to re-run.
Configuration

Your reliability method and your regulator's targets

The method, the day, the meter matching, the targets and who decides are settings; every change is saved as a new version and logged.

SettingDefaultChoose from
Major event day method2.5 beta2.5 beta (IEEE 1366, threshold = e^(α + 2.5β) from daily SAIDI) · Regulator-defined
Years of daily data behind the threshold5 years3 years · 5 years
Threshold fixed for the reporting year2 JanuaryFixed for the reporting year · approved by the Head of Network Performance
ScopeUnplannedUnplanned · All — planned interruptions are reported separately
Meter time tolerance±10 min±5 min · ±10 min · ±15 min — meter events this close to a record's times are a match
Meters that must agree to propose a fix80%70% · 80% · 90% of the meters on the device
Targets, excluding major event daysSAIDI 68 min · SAIFI 0.95 a yearFrom the regulator's performance scheme, shown pro rata — 51.0 min and 0.713 to 30 Sep
Who decidesNadia Rahman, Owen AchterbergReliability engineers accept fixes and mark major event days · Graham Oyelaran signs · Leah Fontaine files
Connections

Works with the outage data a reliability report already runs on

Outage management system recordsinterruptions by device and feeder, with start, restore, customers and cause
Smart meter eventspower-off (last gasp) and power-on messages, minute by minute
Breaker operationsfeeder breaker and recloser operations from the control system
Connectivity model and customers servedmeters below each transformer and device; monthly average of active accounts
Weather and lightningweather station gusts and rainfall, lightning strikes in the service area
Crew dispatch log and close-out notescrews out, last restore, and the cause in the crew's own words
What it changes

The difference, in numbers.

Every figure is labelled: a target the solution is built to, an estimate, a typical published result, or a proven one.

target
100%
of major event day exclusions carry their calculation and evidence
19 Aug justified
IEEE 1366 2.5 beta
target
Every
outage record proved against the meters before it counts
Checked by handa sample
With agentsall 2,671
target
2days
to a drafted quarterly report, not 3 weeks
By hand≈ 3 weeks
With agents2 days

“demo” = seen in the working solution, on its sample network data · “target” = the design goal, measured in the live solution · “estimated” = our estimate (the working-days split) · “typical” = published figures (EIA, Today in Energy: US customers averaged about 11 hours of interruptions in 2024, nearly 9 from major events, and about 2 hours a year without them; LBNL, evaluation of the IEEE 1366 major event day method: the 2.5 beta method is designed to flag about 2.3 major event days a year). Method: IEEE Std 1366, 2.5 beta. Lumina Utilities, the Regional Energy and Water Commission (REWC), Tasman Line Services and the people, feeders and records named on this page are fictional — characters and sample data in the working solution.

Questions

What reliability and regulatory teams ask us.

What is SAIDI and SAIFI reliability reporting?

It is the periodic report a distribution utility files on how long (SAIDI) and how often (SAIFI) its customers were without power, and how long each interruption lasted (CAIDI), with and without major event days. SAIDI and SAIFI Reliability Reporting checks every outage record against the smart meters, computes the indices to IEEE 1366, justifies each major event day and drafts the regulator report.

How are SAIDI, SAIFI and CAIDI calculated?

SAIDI is total customer minutes interrupted divided by customers served; SAIFI is total customers interrupted divided by customers served; CAIDI is SAIDI divided by SAIFI. Only sustained interruptions — longer than 5 minutes — count, and each counts to the day it began. The index calculator uses accepted records only and recomputes on every change.

How does the 2.5 beta method find major event days?

It takes five years of daily SAIDI, leaves out days with none, takes the natural log of each and computes the mean α and standard deviation β. The threshold is e^(α + 2.5β); any day in the reporting year above it is a major event day. In the sample, 1,811 days of 2021–2025 data give 4.08 minutes for 2026.

How does it check outage records against smart meter data?

The outage record checker finds the meters behind each device in the connectivity model and their power-off and power-on events within ±10 minutes. When at least 80% agree, it proposes a fix with the evidence: a duplicate merged, a placeholder restore time replaced by the meters' time, a late start moved, a momentary interruption taken out. Some fixes add minutes.

Can a day below the threshold be excluded?

No. The major event day assessor refuses any day at or below the threshold and says why. In the sample, the 2 May heatwave at 3.91 minutes, against a threshold of 4.08, stays in every index and can be described in the report narrative instead.

Does it produce a worst-performing feeders report?

Yes. Feeders are ranked by customer minutes, all days and excluding major event days, with feeder SAIDI, customers with three or more interruptions (CEMI-3), top cause and the year month by month. A feeder can be sent to the capital planning review, and the top five go into the report.

Do people stay in control of the indices and exclusions?

Yes. Agents propose and draft; they never edit a source record, accept a fix, exclude a day or file. A reliability engineer accepts each fix and marks each major event day, the Head of Network Performance signs with the meaning of the signature recorded, and regulatory affairs files.

How long does it take to go live?

The Agentic Solution Engine builds and deploys it from your requirements and documents — your outage records, meter event feed, connectivity model, regulator template and past filings — and it goes live once every quality gate has passed. We will walk you through it on a past quarter of your own outage data first.

See it on
your outage records.

We'll run SAIDI and SAIFI Reliability Reporting on a past quarter of your own outage records and meter events.