SearchWater Operations

Water Operator Knowledge Search

Water operator knowledge search that answers from your SOPs and permit, and checks every dose against the permit before you set it

Procedures and permit conditions, answered on shift.

See one case, screen by screen ↓
demo0.230mg/Laluminium predicted at the old storm card's 55 mg/L alum — above the permit's 0.200, shown in red before anyone set it
target0answersshown outside a permit limit without a warning; every dose checked against the permit before it is shown
typical21%of water utility staff can retire within 5 years; the senior operator's storm knowledge stays, pinned to the clause it explains
target< 1minuteto a cited dose on the night shift, not a 20-minute call to the on-call supervisor
The problem

Why a storm-night dose is a compliance risk today

At night one operator runs the works. When a storm turns the river from 6 to 45 NTU in a few hours, the answer to “what dose now?” is spread across a 46-page coagulation SOP on a shared drive, the permit in the compliance team's library, the last jar test in a lab spreadsheet, the dosing pump's product strength in an O&M manual — and a laminated storm card taped by the dosing panel. Under-dose and floc carries over to the filters. Over-dose in soft water and the coagulation pH crashes, aluminium stays dissolved and passes the filters.

The person who knows how the river behaves is the senior operator on call, and she retires in December. Her knowledge is mostly not written down, and the storm card no longer matches the water: it was written in 2016 for raw alkalinity of about 55 mg/L, and since the 2021 upland blend it has been 30–38. In February 2023 a night operator followed it, raised alum from 20 to 60 mg/L in one step, and treated-water aluminium stayed above the permit for 5 h 20 min.

demo5 h 20minof treated-water aluminium above the permit after one storm night dosed from an out-of-date storm card
demo2.1MLof water run to waste, a service reservoir flushed and the event notified to the regulator
typical21%of water utility staff can retire within 5 years
Where a storm-night dose decision's minutes goestimated
By hand48 days
With the solution3 days
  • Finding the current SOP clause and dose-correction table8 → 0.1 d
  • Finding the latest jar test for this turbidity band5 → 0.1 d
  • Working the pump rate, alkalinity used and coagulation pH by hand6 → 0.2 d
  • Checking the dose against the permit limits5 → 0.1 d
  • Calling the on-call supervisor to confirm20 → 2 d
  • Writing the shift-log entry4 → 0.5 d

Estimated split for one coagulant dose change on a night shift, in minutes, by hand and with the solution.

How it works

How a question becomes a checked dose

Six specialist agents read the SOPs, the permit, the jar tests and the live plant; the operator sets every dose, the supervisor decides anything outside the permit.

What comes in
Sources in1,204 documents · SOPs, manuals, permits, jar tests, incidents
Agents at work
Question readerworks, chemical, live plant
Then
Procedure finder
Dose calculator
Then
Permit checker9 limits, warns first
Incident matcher
Then
Knowledge keepershift log and expert notes
A person decides
Treatment operatorsets the dose, signs
What comes out
Worked, cited dose
Permit check
Signed shift-log entry
One case, step by step

One storm night, from a rising river to a signed dose

Hollow Vale Water Treatment Works, Lumina Utilities: a 38 ML/d works on the River Kestle. Tuesday 13 October 2026, night shift. Daniel Osei is on his own in the control room; Brenda Holloway is on call. Here is what happens, screen by screen, in the working solution.

  1. 0119:00 to 02:30

    A dry-weather handover, then the river rises

    Daniel Osei · Class 2 treatment operator

    Sam Kirby hands over at 19:00: dry weather, alum 18 mg/L, all 6 filters in service, storm forecast after 23:00. The shift log fills from the plant historian and the weather feed: intake turbidity 6 NTU at 22:00, 19 at 00:40, the settled water alarm at 2.5 NTU at 01:50, then 45 NTU at the intake at 02:30. Alum is still on the dry-weather setpoint, 18 mg/L and 44 L/h on dosing pump DP-1.

    Handover: “Dry weather. Alum 18 mg/L, all 6 filters in service, filter 4 due a wash. Storm forecast after 23:00.”

  2. 0202:41

    “Coagulant dose at 45 NTU?” — answered as a worked dose

    Daniel Osei · Class 2 treatment operator

    Daniel asks in his own words. Above the answer, a live strip from the plant historian, read-only: intake 45 NTU, raw pH 7.3, raw alkalinity 34 mg/L, 9.2 °C, 38.0 ML/d, settled water 2.9 NTU. The answer: raise alum to 38 mg/L, 93 L/h on DP-1. Every line of the working is cited — jar test JT-2026-0288 gave an optimum of 35 mg/L at 40 NTU; SOP-HV-021 Table 2 adds 0.6 mg/L per NTU above it; 38 g/m³ × 1,583 m³/h ÷ 645 g/L gives 93.3 L/h.

    “Raise alum to 38 mg/L · Liquid aluminium sulphate on dosing pump DP-1, for raw water at 45 NTU and 38.0 ML/d”

  3. 037.8 seconds

    The SOP, the permit, the jar test and the plant, read in order

    The six agents

    The run tape shows each step. The question reader took the works, the stage and the chemical from the question and the live readings. The procedure finder found SOP-HV-021 rev 9 §5.3, §5.4, §5.6 and Table 2, the O&M manual §4.2 — and flagged storm card SC-HV-03 as superseded. The dose calculator split the change into two steps under the ramp rule, and the permit checker checked 9 limits, all inside. Brenda's approved note sits beside the jar-test curve.

    Brenda Holloway, approved note N-102: “Above 40 NTU, step the alum up in tens and watch the coagulation pH, not the settled turbidity.”

  4. 04Try the storm card

    The storm card says 55. The permit check turns red

    Daniel Osei · Class 2 treatment operator

    At 38 mg/L every meter is green: treated-water aluminium 0.060 mg/L against the permit's 0.200 and a works target of 0.100, filtered turbidity 0.12 NTU against 0.30, coagulation pH 6.7 in the SOP window of 6.4–6.9, 15 mg/L of alkalinity left. Daniel slides the dose to the storm card's 55. Aluminium goes to 0.230 mg/L, coagulation pH to 6.2 and alkalinity left to 6.5, below the minimum of 10.

    “Breaks permit HV-07 4.2: aluminium 0.230 mg/L. Also outside the SOP: alkalinity 6.5 mg/L.”

  5. 05Log 55 instead?

    A dose outside the permit needs the supervisor

    Permit checker

    If Daniel tries to log the red dose, the solution stops him and offers to send it to Brenda to decide, with the permit check attached. The rule is locked on in Settings. The permit checker never softens or hides a limit, and the warning goes on the shift log: “Daniel tried 55 mg/L (the storm card): warned”.

    “A dose outside the permit cannot be logged without the on-call supervisor. This rule is locked in Settings.”

  6. 06Has this happened before?

    The same storm card, the same river, in 2023

    Incident matcher

    Beside the answer, the incident matcher shows INC-2023-0417. Raw water rose to 52 NTU; the night operator followed the storm card and raised alum from 20 to 60 mg/L in one step. Coagulation pH fell to 6.1 and treated-water aluminium reached 0.24 mg/L. The root cause: the card was written for alkalinity of about 55 mg/L, and no jar test had been run in the storm band that month.

    “Notified to the regulator · 2.1 ML run to waste · service reservoir flushed”

  7. 0702:44

    Step 1 set and signed; Brenda told

    Daniel Osei · Class 2 treatment operator

    Daniel sets DP-1 to 69 L/h, 28 mg/L — step 1 of 2, no more than 10 mg/L in one step under SOP-HV-021 §5.3 — and signs the shift-log entry the knowledge keeper drafted with the reason. The agents never write to the plant; Daniel sets the pump. Because the night's change will pass 15 mg/L, Brenda is notified and acknowledges at 02:45.

    Brenda Holloway, on call: “Good. Watch the pH, not the settled.”

  8. 0803:12

    Withdraw the storm card — waiting for the process scientist

    Brenda Holloway · senior operator, on call

    After the warning, Brenda phones in a note, and the knowledge keeper drafts it in her words with the evidence. It waits with two more of hers for Dr. Priya Raman: filter 4 needs twenty minutes to waste after a backwash, and the Kestle's second flush comes six to eight hours after the first peak. Brenda retires in 66 days; 24 of her 38 notes are already in answers.

    N-121: “Withdraw storm card SC-HV-03. It was right for the old water. Tonight it would have taken us over on aluminium again.”

  9. 0903:59

    The confirm jar test agrees: 38 mg/L

    Daniel Osei · Class 2 treatment operator

    SOP-HV-021 §6 asks for a confirm jar test within 2 hours of any change over 10 mg/L. Six jars are set up from the answer, 30 to 50 mg/L in steps of 4. Daniel imports the bench readings from turbidimeter TB-07 and pH meter PH-03: the lowest settled turbidity is 0.7 NTU at 38 mg/L. He saves JT-2026-0291 as the new reference for the 30–60 NTU band.

    “The answer holds. Lowest settled turbidity at 38 mg/L (0.7 NTU), the dose set at 02:54.”

  10. 10The permit view

    Nine limits, one warning, no exceedance

    Helen Marsh · water quality compliance manager

    Helen owns permit HV-07, version 4. Her view lists the nine conditions a dose can move — aluminium, turbidity at each filter, outlet pH, free chlorine, contact time, trihalomethanes, iron, manganese, chlorate — with the permit limit, the works target, the 30-day maximum and tonight's prediction. It shows one warning tonight, at 55 mg/L, and no exceedances in the last 12 months.

    “Permit text is quoted, never rewritten · owner: Helen Marsh”

Who it’s for

Built for everyone on the shift, and the people behind it.

The same storm night, seen by the five people who carry it — what it looked like before, and what it looks like now.

DO
Daniel OseiClass 2 treatment operator, nights · Hollow Vale WTW
Treatment operator
Before
Alone in the control room from 19:00 to 07:00, with the SOP on a shared drive, the jar tests in a spreadsheet and the storm card on the wall. “The storm card says 55. Is that still right?”
Now
Asks in plain words and gets the dose, the pump rate to set and every line of the working, cited — and can try any other dose against the permit before he touches the pump.
BH
Brenda HollowaySenior operator · 31 years at Hollow Vale · on-call supervisor · retires 18 Dec 2026
Senior operator
Before
Takes the 3 a.m. calls and knows how the River Kestle behaves in a storm. Most of it is in her head. “Never chase turbidity with alum. Watch the pH.”
Now
Her notes are recorded in her words, pinned to the clause they explain and shown in answers with her name once approved. She decides any dose outside the permit.
PR
Dr. Priya RamanProcess scientist · owns the treatment SOPs and dose curves
Process scientist
Before
Revises the SOPs and signs off dose-curve changes, while storm cards and old quick guides live on the plant floor. “If it isn't in the SOP, it isn't a procedure.”
Now
Approves or rejects each expert note with its evidence, sees the superseded documents still on the floor, and reads every answer rated wrong.
HM
Helen MarshWater quality compliance manager · owner of permit HV-07
Compliance manager
Before
Reports exceedances to the regulator after the sample comes back. “I want to know before the sample does.”
Now
Sets the works targets inside the permit and sees every limit a dose can move, its headroom and every warning shown on a shift.
LF
Luis FerreiraNetwork technician · distribution, flushing and burst mains
Network technician
Before
Repairs mains in the dark and has to know the flush volume and the field tests before a main goes back. “When can I put Calder Street back into supply?”
Now
Gets SOP-NW-014 as numbered steps with the flush volume worked out and his field readings checked against each limit.
Built on the engine

6 agents. Each with one job, and hard limits.

Six specialist agents read the SOPs, the permit, the jar tests and the live plant; the operator sets every dose, the supervisor decides anything outside the permit.

Question reader

Reads the operator's question in their own words and pulls the latest readings from the plant historian — raw turbidity, pH, alkalinity, temperature, flow and the current setpoint — to work out the works, the process stage, the chemical and the dosing pump.

  • Read-only on plant data — never writes to the plant
  • Never guesses a works or a chemical; asks when two match
Procedure finder

Searches the SOPs, O&M manuals, permits, standards, lab methods, incident reports and approved expert notes, and returns each passage with its document, revision and clause, preferring the current revision.

  • Cites document, revision and clause
  • Quotes permit and safety text word for word, never rewrites it
  • Labels a superseded document, such as an old storm card, as superseded
Dose calculator

Starts from the most recent jar test in the raw-water band, applies the SOP correction table, converts to the pump rate with the product strength and the current flow, works the alkalinity used and the coagulation pH, and splits the change into steps under the ramp rule.

  • Never sends a setpoint to the plant
  • Respects the ramp rule — never more than the SOP's step
  • Shows every input and its source
Permit checker

Predicts aluminium, filtered turbidity, coagulation pH, alkalinity, chlorine, contact time and by-products for the proposed dose and compares each with the permit limit and the works target: green inside both, amber outside a target, red outside the permit, with the clause.

  • Never softens or hides a limit
  • A red dose cannot be logged without the supervisor
Incident matcher

Finds past water-quality incidents with conditions like tonight's and shows each beside the answer, with what happened, why and the lesson it left.

  • Always shows the root cause and the status
Knowledge keeper

Drafts the shift-log entry from each answer, drafts notes in the senior operator's words from recorded sessions and calls, gathers the plant evidence and proposes SOP changes.

  • The operator signs every entry
  • Never publishes a note or changes an SOP — the process scientist approves every note
On-call supervisor

Decides any dose outside the permit. The agents propose; a named person decides.

Ask in plain words

Ask about a dose, a procedure or a permit condition

The assistant answers from the works' SOPs, permit, O&M manuals, jar tests, incident reports and approved expert notes, and cites each one.

Why not the storm card's 55 mg/L?

Because the water has changed. Storm card SC-HV-03 was written in 2016 for raw alkalinity of about 55 mg/L; since the 2021 upland blend it has been 30–38, and tonight it is 34. At 55 mg/L alum uses 27.5 of it, leaving 6.5, below the minimum of 10. Coagulation pH falls to about 6.2 and aluminium stays dissolved: predicted 0.23 mg/L at the outlet, above the 0.200 in permit HV-07 condition 4.2. That is what happened on 14 Feb 2023.

Set up tonight's confirm jar test

Due within 2 hours of the change over 10 mg/L, so by 04:41. Set six jars around 38 mg/L in steps of 4: 30, 34, 38, 42, 46, 50. Use raw water from the intake tap, not the inlet channel, and the lab method's 2 / 15 / 20 minute timing.

Which limits can tonight's dose move?

Nine conditions of permit HV-07 are checked on every dose answer. For alum the four that move are aluminium (4.2), filtered turbidity (4.3), and two SOP limits that protect them: coagulation pH 6.4–6.9 and alkalinity ≥ 10. At 38 mg/L all are inside. The safe band tonight is 30–42 mg/L.

What has Brenda said about storm nights?

Nine of her 38 notes are about coagulation in storms. The one in tonight's answer: “step the alum up in tens and watch the coagulation pH, not the settled turbidity”. Two more wait for Dr. Raman: the Kestle's second flush six to eight hours after the first peak, and withdrawing the 2016 storm card. Brenda retires in 66 days.

Every screen

The working solution, as it ships.

13 screens from the working solution, on its sample data. Pick one to see it large.

The dose answerLive readings from the plant, the question, the dose and pump rate with every line of the working cited, and the permit check beside it.
How the answer was workedThe ramp steps to set, the jar-test curve, the senior operator's approved note, the superseded storm card and the agents' run tape.
Try another doseThe storm card's 55 mg/L turns the permit check red: aluminium above permit condition 4.2, coagulation pH and alkalinity outside the SOP.
A red dose needs the supervisorA dose outside the permit cannot be logged by the operator; it goes to the on-call supervisor with the permit check attached.
Step 1 logged and signedThe operator sets the pump and signs the drafted entry; the on-call supervisor is notified.
A procedure answerReturning a repaired main to supply: numbered steps quoted from the SOP, the flush volume worked out and the field readings checked.
The confirm jar testSix jars around the answer, bench readings imported, the optimum compared with the dose set and saved to the works' dose curve.
The permit and its limitsEvery condition a dose can move, with the permit limit, works target, 30-day maximum, tonight's prediction and headroom.
Procedures and sources1,204 documents an answer can cite — SOPs, O&M manuals, permits, standards, incident reports, expert notes and storm cards — with revision, owner and status.
Has this happened before?Past water-quality incidents with what happened, why, the lesson and the timeline, shown beside answers when conditions match.
The shift logReadings, questions, answers, warnings and setpoint changes in order, with drafted entries waiting for the operator's signature.
Expert notesA retiring senior operator's knowledge, in her words, pinned to the clause it explains and waiting for the process scientist.
Your rulesLimits and works targets, what warns and what stops, and the order sources are trusted in.
Governance

Built for drinking water: cited, checked against the permit, signed.

Every line cites its sourceEach line of an answer cites a document, revision and clause, a jar test, or a plant reading with its time. Open any citation to read the passage it came from.
Permit text quoted, never rewrittenPermit conditions and safety steps are quoted word for word, and procedure steps taken from the SOP are marked as quoted. Superseded documents are labelled superseded wherever they appear.
Agents read the plant; they never write to itLive readings come from the plant historian, read-only. “Agents may write setpoints to the plant” is locked off in Settings. The operator sets every dose.
A red dose needs the supervisorA dose outside a permit limit is shown in red with the clause and cannot be logged without the on-call supervisor. That rule is locked on. A total change over 15 mg/L in one shift is reported to the supervisor.
Expert notes are drafts until approvedNotes from senior operators keep their author's name and words, carry their evidence, and reach answers only when the process scientist approves them. A rejection keeps its reason on record.
Every answer on the recordThe question, the sources, the calculation inputs, the warnings shown and who signed are kept for every answer, and each signed entry goes on the shift log with its time.
Configuration

Your permit, your SOPs, your rules

The limits each dose is checked against, what warns and what stops, and the order sources are trusted in are settings, saved as a new version.

SettingDefaultChoose from
Permit limits and works targetsPermit limits read from HV-07 and locked; works targets set inside themAmber from the works target, red at the permit limit · coagulation pH: amber outside 6.4–6.9, red below 6.2 or above 7.1 · alkalinity left: amber below 10, red below 7
A dose outside the permit cannot be logged without the supervisorOnAlways on
Warn when a prediction passes the works targetOnOn · Off
RampAt most 10 mg/L per step, 10 minutes apartOn · Off
Confirm jar testWithin 2 hours of a change over 10 mg/LOn · Off
Show superseded storm cards in answers, marked supersededOnOn · Off
Agents may write setpoints to the plantOffAlways off — agents read the plant, they never write to it
Sources, in the order they are trustedPermit, SOPs, O&M manuals, standards and lab methods, approved expert notes, incident reports, storm cardsStorm cards never outrank an SOP
Connections

Works with the documents and data a treatment works already runs on

SOPs and O&M manualstreatment and network SOPs with revision, owner and review date; equipment manuals with product strengths
Permits and standardsthe works' permit conditions, the utility's drinking water quality standard and lab methods
Plant historianlive intake turbidity, pH, alkalinity, temperature, flow, setpoints and alarms, read-only
Jar testsbench readings from the turbidimeter and pH meter, and the works' dose curve
Incident reportspast water-quality incidents with timeline, root cause and lesson
Shift log and expert sessionshandovers, readings and signed entries; recorded walk-throughs and calls with senior operators
What it changes

The difference, in numbers.

Every figure is labelled: a target the solution is built to, an estimate, a typical published result, or a proven one.

target
0answers
shown outside a permit limit without a warning; every dose checked
100% of doses
checked against the permit
typical
21%
of water utility staff can retire within 5 years; their storm knowledge stays
target
< 1minute
to a cited dose on the night shift, not a 20-minute call-out
Today20 min call
With the answer< 1 min

“demo” = seen in the working solution, on its sample works data · “target” = the design goal, measured in the pilot · “estimated” = our estimate (the minutes split for one dose change) · “typical” = published figures (AWWA, 2025: 21% of water utility staff can retire within 5 years). Regulatory context: aluminium 0.2 mg/L is the EU Drinking Water Directive 2020/2184 indicator value and the top of the US EPA secondary standard range (0.05–0.2 mg/L); 0.3 NTU filtered turbidity is from the US EPA surface water treatment rules. Lumina Utilities, Hollow Vale works, the River Kestle, permit HV-07 and the people, suppliers, documents and numbers named on this page are fictional — characters and sample data in the working solution.

Questions

What water operators and treatment managers ask us.

What is water operator knowledge search?

It is a search for treatment operators and network technicians that answers from the works' own SOPs, O&M manuals, permit, jar tests and incident reports, with every line cited. When the answer is a chemical dose, it comes back as a worked calculation with a permit check beside it; when it is a procedure, it comes back as numbered steps with the SOP and permit text quoted.

How does the coagulant dose calculation work?

The dose calculator starts from the latest jar test in the raw-water turbidity band, applies the SOP's correction table, converts the dose to a pump rate with the product strength from the O&M manual and the current flow, and works the alkalinity used and the predicted coagulation pH. In the sample case: 35 mg/L at 40 NTU, plus 0.6 mg/L per NTU, gives 38 mg/L and 93 L/h on DP-1, ramped in two steps.

Does it check every dose against the drinking water permit?

Yes. Before an answer is shown, the permit checker predicts each limit the dose can move — in the sample works, nine — and marks it green, amber or red against the works target and the permit limit, with the clause. The operator can slide to any other dose and see which limit it would break. A dose outside the permit cannot be logged without the on-call supervisor.

How does it keep a retiring operator's knowledge?

The knowledge keeper drafts notes from recorded sessions and calls with senior operators, in their words, pinned to the SOP clause each one explains and backed by plant evidence. The process scientist approves or rejects each note; approved notes appear in answers with the author's name. Superseded storm cards and quick guides are flagged and can be sent for withdrawal.

Can the agents change setpoints on the plant?

No. The agents read the plant historian read-only and never write to the control system; that setting is locked off. The operator sets every dose on the pump and signs the shift-log entry the knowledge keeper drafts.

Does it work for network technicians as well as treatment operators?

Yes. A network technician can ask, for example, when a repaired main can go back into supply, and get the mains-repair SOP as numbered steps with the flush volume worked out and the field chlorine and turbidity readings checked against each limit.

Do operators and supervisors stay in control?

Yes. The operator sets every dose and signs every entry, the on-call supervisor decides anything outside the permit and is told of large changes, the process scientist owns the SOPs and approves expert notes, and the compliance manager owns the permit limits and works targets. Every answer, warning and signature is kept on the record.

How long does it take to go live?

The Agentic Solution Engine builds and deploys it from your requirements and documents — your SOPs, O&M manuals, permit, jar-test records and incident reports — and it goes live once every quality gate has passed. We will walk you through it on your own works and a past storm night first.

See it on
your SOPs and permit.

We'll run Water Operator Knowledge Search on your own SOPs, permit and a past storm night.