- Before
- “Every quarter I rebuild the same bridge, and the first follow-up breaks it.”
- Now
- Asks in plain words, gets a cited answer in cents and dollars, changes the question and keeps both versions — then approves what goes to the board.
One CASM analysis, from the CFO's question to a signed board slide
Corvane Airways, a network carrier with 304 aircraft and its hub at ORD, closed Q3 in the ledger on Monday, October 12. The earnings call is on the 22nd and the audit committee sees the board deck on the 27th. The CFO wants to know why CASM-ex rose. Here is the work in the working solution, screen by screen.
- 01Thursday morning
The CFO's question is waiting, and the close is already done
Laura Kessler · Director, FP&ALaura's Today screen shows CASM-ex for Q3 2026 at 11.84¢, up 0.42¢ on Q3 2025, two questions waiting for an answer and one exception between the ledger and Form 41. When the ledger closed on Monday evening, the ledger agent mapped 214 accounts to 8 cost categories — $3,717.8M of CASM-ex cost on 31.40B seat miles — and overnight the check agent recomputed it independently: 0.00¢ from the answer.
Needs you: “Robert Castine asked: ‘Why did CASM-ex rise to 11.84¢ in Q3 from 11.42¢?’ · For the earnings call script (Thu, Oct 22) and the board deck · Due in 1 day.”
- 02One click
She asks; the agents show their plan and work it step by step
Planner agentLaura clicks Answer it. The planner agent fixes the scope before anything runs: CASM-ex per definition v3, Q3 2026 against Q3 2025, the whole system. Then each step runs in view — the ledger agent reads the closed ledger, the capacity agent reads 31.40B seat miles against T-100, the driver agent reads the payroll register, shop-visit log and integration project ledger, and the Form 41 agent aligns it all to Schedule P-6.
“Scope: CASM-ex per definition v3, Q3 2026 against Q3 2025, whole system. Seven steps; I will show each one as it runs.”
- 03The answer
One sentence, then the drivers in cents
Briefing agent“CASM-ex rose 0.42¢ to 11.84¢ in Q3 2026 from 11.42¢ a year earlier (+3.7%). Maintenance, labor and integration explain all of it; everything else nets to zero.” Maintenance adds +0.19¢ ($59.7M) from 11 engine shop visits on 787-9 engines against 4 a year ago; labor +0.15¢ from the 4.0% pilot pay step on July 1 and the flight attendant agreement; integration +0.08¢. A fleet strip underneath puts the 787-9 at 10.38¢, up 0.82¢.
Every driver shows how much of the move it explains and its confidence; the answer carries “Ties to the ledger · 0.00¢”.
- 04Behind every number
Every cent opens its source passage
Marcus Webb · Senior Cost AnalystEach driver carries its sources: GL 6310–6340, the Form 41 P-6 maintenance line and the shop-visit log for maintenance; GL 5100–5190, P-6 salaries and the pilot agreement §3.2 for labor. Opening one shows the passage itself — here the Q3 2026 Schedule P-6 draft, with maintenance material and repairs at 398.8 and the total at $4,927.0M, equal to the ledger.
Form 41 Schedule P-6 · Q3 2026 draft — “operating expenses by objective grouping · draft for filing · mapping table v12”.
- 05The reason, not just the variance
Eleven shop visits, with engine serials and costs
Driver agentThe maintenance driver goes below the account to the events. The 787-9 page lists all 11 engine shop visits in Q3 — engine serial, ship, induction date, the work (high-pressure turbine blades, combustor, life-limited parts, performance restoration) and the cost, $53.9M in all. Three were pulled forward from Q4, which is why September is the highest month at 10.65¢.
The driver agent says “unexplained” rather than invent a reason; below a 90% explained floor it asks the owner.
- 06The analysts' question
“Exclude integration” — the bridge rebuilds, both versions kept
Laura Kessler · Director, FP&AInvestor Relations needs one CASM-ex number excluding integration for the analyst Q&A file. Laura changes the question with one chip and the agents recompute: 11.76¢, up 0.34¢, with the $25.1M of Halden Air integration run-costs removed and maintenance and labor unchanged. Version 2 sits beside version 1, and Compare versions shows exactly what moved.
Check agent: “Both versions tie to the ledger at 0.00¢ and the draft P-6 equals the ledger at $4,927.0M. One thing to fix before filing: the T-100 seat count on six 787-9s is 0.14% below the seat miles flown.”
- 07Before anyone files
Form 41 and the earnings number agree
Dana Whitcomb · Regulatory Reporting ManagerOn Form 41 alignment Dana sees four exceptions. One needs her decision: July and August T-100 were filed at 290 seats on six reconfigured 787-9s that fly at 296, and the capacity agent has drafted the amendment for ships 3804, 3807, 3811, 3815, 3820 and 3823. The other three are explained — integration IT in P-6 “Other”, Halden Air July fuel booked in August, third-party maintenance excluded from CASM-ex — and she can accept them together.
“Agents prepare; Regulatory Reporting decides; Corvane files.”
- 08Save to board deck
Drafts go to review, not into the deck
Laura Kessler · Director, FP&AFrom the answer, Laura saves to the board deck. The briefing agent drafts slide S-1 “CASM-ex Q3 2026: +0.42¢, three drivers”, slide S-2 for 11.76¢ excluding integration, and the earnings-script line. All three arrive In review, each tied to its answer version and sources. Laura approves them with reason A1, “Figures tied to the ledger and P-6”.
“Nothing enters the deck until the FP&A Director has reviewed it, Investor Relations has checked investor wording, and the CFO has signed.”
- 09Signed
IR approves the wording; the CFO signs the section
Simone Adler and Robert CastineSimone approves the script line — “Third-quarter CASM-ex was 11.84 cents, up 3.7 percent year over year. Excluding integration run-costs, it was 11.76 cents, up 3.0 percent…” — with reason W1. Robert signs the unit-cost section with reason C1. Every item is locked to its answer version and sources, and a later change reopens review.
“Signed electronically … logged in the audit trail.”