- Before
- Reviews every flight of the 132 kV and 66 kV network, more than 6,000 images a line, one by one. “I don't need more pictures. I need the twelve that matter, and whether they're getting worse.”
- Now
- Starts the morning on a ranked gallery, growing and Urgent first, and confirms or rejects each box with a key press.
One flight, from upload to a drafted work request
Lumina Utilities' Overhead Lines department flies every line once a year. On Monday 12 October 2026, Corvane Aerial flies F-2609 along L-214 Harrow Ridge – Calder, a 132 kV double circuit of 148 structures. Here is what happens next, screen by screen, in the working solution.
- 01Overnight
Every image matched, screened, compared and ranked before morning
Flight intake checker, Defect screener, Change detector, Severity rankerJo Whitaker uploads F-2609 at 16:40: 6,412 images. By 17:31 every image is matched to its structure and two re-shoots are requested (T-019 phase C, T-131 footing). By 19:52 the screener has candidates on 425 images, merged into 118 boxes on 64 structures. By 20:48, 141 of 148 structures are compared with last October's flight, and at 21:05 the queue is ranked: 2 Urgent, 30 Priority 2, 86 Priority 3. The same five steps run on demand from the Flights screen — here for F-2610, the 33 kV Dunmore tee flown this morning.
Review lag: 38–47 days by hand in March–June; 1.8 days in October.
- 0207:00
The gallery opens on the box that matters most
Ines Calloway · Lead line inspectorAcross the top is the line itself: all 148 structures as ticks, coloured by their worst box, with the Calder Road crossing marked. On the left, structures ranked for review, growing and Urgent first. In the centre, T-087's phase B string at 12× zoom, boxed “Cracked insulator disc · 94%”. On the right, the box under review — Urgent, was Priority 3 — and how it was made, agent by agent, with the time of each step.
“Crack grew 109% in 12 months (growth rule G-1: over 50% → Urgent) over a road crossing.”
- 03One key press
Confirm the clamp, move to the next structure
Ines Calloway · Lead line inspectorAt T-042 on the Harrow Ridge escarpment, the corroded area of the phase C suspension clamp has risen from 6% to 19% of the fitting. Rule C-1 raises it one level, to Priority 2. Ines presses C. The box is confirmed and the gallery moves on to T-118 in Westmere woods: a new nest 0.9 m from a live jumper, 97% sure.
“Confirmed B-0422 · Priority 2, within 90 days”
- 04With a reason
Rust that is only fresh primer, rejected
Ines Calloway · Lead line inspectorAt T-055 the screener boxed “corrosion on tower leg” at 58% — an orange patch on a bolt group, flagged as low confidence, maybe fresh primer. It is: a repaired bolt. Ines presses R and picks the reason, “Not a defect — fresh primer or paint”. The reason goes to the audit trail and back to the screener for retraining.
“Every box at 40% or more is seen by a person.”
- 05Last year
The same disc, a year apart
Change detectorBack on T-087, Last year turns the image into a wipe between October 2025 (F-2511) and October 2026 (F-2609). Ines drags it across the string. The change detector found the same component on last year's flight, aligned the two on fixed points and measured the crack from the 255 mm disc: 11 mm then, 23 mm now.
“Crack length · same component, aligned by the change detector”
- 06The comparison
The measurement, its scale, and the rule that fired
Change detector and Severity rankerThe comparison shows the disc full size — wipe, side by side or zoom on the box — aligned on the four disc caps. The component's history: no crack seen in October 2023; 11 mm in October 2025, logged Priority 3, “watch on the next flight”; 23 mm now, +109% in 12 months. Growth rule G-1 says a crack that grows more than 50% in 12 months is Urgent.
“crack length · scaled from the 255 mm disc, ±1 mm”
- 07Agreed at 09:17
Urgent needs two people
Hana Lindqvist · Senior asset engineerInes promotes the box to Urgent, due 20 October 2026, with a note: the crack on disc 4 doubled since F-2511 and the string is over the Calder Road crossing. It goes to Hana Lindqvist, who agrees from her phone. Only then is the work request drafted.
“Urgent — agreed. Ines Calloway confirmed, Hana Lindqvist agreed at 09:17. Work request WR-26-4417 drafted, due 20 Oct 2026.”
- 08Drafted
Work requests with the part, the crew and the outage
Work request drafterWR-26-4417: replace the left-circuit phase B insulator string at T-087 — 9 × 255 mm porcelain discs, ball-and-socket, from stores; overhead lines crew 3, four people; a circuit outage of 8 hours; traffic management for the Calder Road crossing. WR-26-4420 replaces the phase C clamp and U-bolts at T-042, due 11 January 2027. Each carries the image and its position.
Drafts only. Marcus Bell, maintenance planner, releases them to the work management system.
- 09Written
The line's inspection report, from the reviewed boxes
Report writer · Rafael Moreno, inspection programme managerThe report writer drafts the overhead line inspection report for F-2609: summary, coverage, findings by priority, the defects that grew and the review status. Every structure has its six required views; 888 of 888 were captured. A 2% spot check of the 5,987 images with no box is under way: 64 of 120 checked, no defect missed. Rafael Moreno signs and issues it, with the meaning of his signature recorded.
The report never signs itself, and it always states the boxes still open.