- Before
- Works claims from the web form, email and agency files, looks up delay codes and writes letters from templates — paying in two minutes, refusing properly in an hour.
- Now
- Starts with what needs her, reads each claim beside the flight’s day with every record one click away, and signs with a reason code.
One EU261 claim, one flight’s day, one signed decision
Corvane Airways flight CV 95, Paris Charles de Gaulle to Chicago O’Hare on Saturday, October 3, arrived 4 h 10 min late. On Wednesday, October 14, Camille Arnaud asked for €600 through the web form. It is Thursday morning. Here is how her claim — and the 63 others from the same flight — gets answered, screen by screen, in the working solution.
- 01Thursday morning
Today: what needs her, and what is ready to sign
Nora Castellan · Claims HandlerNora’s home is a short list, not a dashboard. Overnight the agents read 418 new claims and rebuilt nine flights’ days. 37 claims need her — a duplicate, a mandate, a receipt or a cause to check — 212 are ready to sign, and 19 are due within 7 days against Corvane’s 14-day answer. Beside the list, what the agents found since 06:00, each finding with its record.
“The hydraulic leak on N815CV is in the technical log at 07:05 — the delay code alone said only “41”. Not extraordinary, 96%.”
- 02One click
The claim beside the flight’s day
Nora Castellan · Claims HandlerCLM-26-48213 opens with the facts in one strip: CV 95 CDG → ORD on Boeing 787-9 N815CV, 6,654 km, 4 h 10 min late with the doors open at 17:05 CDT, EU261 Art 7(1)(c), not extraordinary, €600. Below it, the Delay Investigator’s timeline from 17 records in 6 systems: schedule, aircraft movements, technical log, weather at both ends, air traffic and passengers, with the delay at the door split into 3 h 54 min technical repair, 12 min air-traffic slot and 4 min taxi-in. On the right, the conversation with the agents.
- 03Click the 07:05 dot
The record itself, not a summary of it
Delay InvestigatorEvery point on the timeline opens the passage it came from. The 07:05 entry is technical log TLB 815-2291: “HYD QTY LOW R”, a leak traced to the right engine-driven pump pressure-line B-nut fitting, aircraft not dispatchable, fitting and seal kit required. The certificate of release to service follows at 13:38.
“Read by the agents from the system of record, read-only · the highlighted passage is the one relied on.”
- 0409:15 to 09:17
Not extraordinary — and a second agent argues the passenger’s side
Circumstance Assessor · Challenger · Amount CalculatorThe Circumstance Assessor finds the leak not extraordinary at 96%: a fault found in service is part of normal operation, under Wallentin-Hermann and van der Lans. The Challenger then argues as an agency’s lawyer would, finds no hidden manufacturing defect, no airworthiness directive on the fitting and no spare aircraft that could have flown sooner, and agrees. The 12-minute slot is outside Corvane’s control, but without it the delay is still 3 h 58 min. The Amount Calculator gives €600, about $648, and does not deduct the €15 meal voucher, which was care.
Six checks on the claim, all clear: booking matched, flew on it, revenue ticket, flight covered, not paid before, payee is the claimant.
- 0509:21
She decides, with a reason code
Nora Castellan · Claims HandlerThe Letter Writer asks: “Shall I set this claim to pay €600 to Camille Arnaud?” Nora opens Decide. The agents propose Pay €600; she picks APV-01, Pay as drafted, over Pay with an edit, Ask the claimant for information or Send to counsel, and signs as herself. The claim moves to payment batch PB-1015-B, and the letter goes when the batch is countersigned.
“The letter is drafted in French and English. Nothing is paid until you decide.”
- 06One finding for all
64 claims from CV 95, one answer
Marcus Hale · Customer Relations ManagerThe cause is a fact about the flight, so it is decided once. CV 95 has 64 claims — 23 direct, 41 from three agencies: 58 owed €600 (€34,800 ≈ $37,584), 3 agency copies of direct claims, 2 staff-travel tickets and 1 passenger who did not fly. The finding goes to Marcus to sign with FLT-01 for all 58. A claim that arrives later inherits it and still gets its own checks. The manifest shows 219 more passengers covered but not yet claimed, and offering them compensation now is a manager’s decision with a reason code.
“Claims that arrive later inherit the finding and still get their own checks.”
- 0708:31
Paid once, to someone entitled
Payee AgentThis morning’s Velora Claims file had 214 rows: 205 matched, 6 duplicates of direct claims held, 3 unknown bookings. Four agency claims across Velora and Northgate Passenger Claims have no signed mandate, so nothing is paid on them until one arrives — one click requests all four, and the claims pause rather than being refused.
“Nothing is paid to an agency without a signed mandate or assignment.”
- 0809:18
A plain letter in her language
Letter WriterCamille’s letter is drafted in French and English: CV 95 arrived 4 h 10 min late because of a hydraulic leak found on the aircraft that morning, a technical fault that is part of an airline’s normal operation and not an extraordinary circumstance; €600 under Article 7 of Regulation (EC) 261/2004 goes to the account she gave within 7 days; the €15 meal at gate K45 was care and is not deducted. Refusals carry their evidence annex — and the CV 99 refusal is held, because the Challenger is still reading the rotation plan.
“A refusal is never sent without the records it relies on — this letter unlocks when the finding is signed.”
- 09Over the line
Two signatures on large batches
Tomás Rivera · Payments ControllerPayments go by bank transfer in the passenger’s currency. Batch PB-1015-A — 84 payments on CV 52 and CV 140, €50,400 ≈ $54,432 — is over the $25,000 line and waits for Tomás to countersign. Every payee was checked for account holder, mandate and duplicates, and the three payments the bank sent back come to the handler as exceptions.
- 10Before the hearing
Settle what will lose, defend what will win
Ingrid Sørlie · Legal Counsel, EuropeFour EU261 court claims are open. The Challenger expects to lose DSP-2598 in Paris (92%), a crew-sickness refusal from August, and DSP-2604 in the UK County Court (95%), an avionics fault refused as “safety”, and recommends settling both. DSP-2611 in Frankfurt, with a 12% chance of losing, can be defended: the air-traffic controllers’ strike notice is on file. The Case Builder assembles each court pack from the flight’s records; Ingrid decides each one.
“The Challenger forecasts how a court would see each case; the Case Builder assembles the pack from the flight’s records. Counsel decides.”