- Before
- Builds and repairs the November pairings before bids open, trusting a green tick and editing by trial when a rule ID turns red.
- Now
- Opens each breach on a ruler with its rule cell and arithmetic, reads a fix that is already re-checked legal, asks what it costs and signs.
One bid period, from the overnight check to a legal publish
Corvane Airways' November pairings go to bids on Wednesday, October 21 at 12:00 CT. Overnight the agents checked 3,846 pairings and 17,666 crew lines. Here is Monday morning, screen by screen, in the working solution — a crew planner working with the agents, asking, deciding and signing.
- 01Monday, 08:40 CT
What needs a person, and nothing else
Jordan Reyes · Crew PlannerJordan's Today screen opens on three numbers: 3,841 of 3,846 November pairings legal, 18 fixes waiting for her, and 2 decisions in today's operation. Under them is the agents' overnight briefing, 02:10–02:24 CT: the FTL checker found 9 illegal pairings, the delay-risk forecaster found 32 more legal on paper but likely to break, and the roster checker has 7 crew findings waiting.
FTL checker: “The worst is D4417: five legs from a 05:45 report, 12:40 against an 11:30 limit, because November moved CV 1876 to 17:15.”
- 02One click
The duty day on a ruler
FTL checkerD4417 is a two-day ORD A321neo trip that operates 20 days in November. The ruler draws day 1 from the 05:45 report through five legs to the last block-in at 18:25 CT, with the 11:30 limit line falling at 17:15 — the minute CV 1876 pushes back — and the overrun hatched: over by 1:10. Beside it, flight time 8:25 of 9:00, flight attendant duty 12:55 of 14:00 and rest at CLE 11:25 against 10:00 are all legal.
On a bad day, from 90 days of real times: P80 13:02, P95 13:21.
- 03Click the limit
The rule behind the number
FTL checkerClicking 11:30 opens Part 117 Table B at the cell used: report time row 05:00–05:59, column 5 segments, 11.5 hours, with the text of 14 CFR 117.13 above it. The planner never has to trust a green tick or decode a rule ID; every limit points at a paragraph she can read.
“14 CFR 117.13 · the cell used: row 0500–0559, 5 segments = 11:30.”
- 0402:17 – 02:21
Recomputed, forecast and fixed before she arrived
Second checker, delay-risk forecaster, fix plannerThe second checker recomputed the limit its own way — from the rule text and the schedule file, not the pairing record — and agrees to the minute. The fix planner tried four changes: A, split off the last leg, is legal at 10:35 against 12:00; B still breaks; C is a schedule change outside crew planning's hands; D is not allowed, because the A321neo has no crew rest facility. With fix A, the forecaster puts the day at P80 11:12 and P95 11:41 — about a 2% chance of needing an extension.
Fix planner: “A is legal and the cheapest; the FTL checker re-checked it.”
- 0508:41
She asks what it costs, in plain words
Jordan Reyes · Crew PlannerJordan types: “What does fix A cost, and does anyone lose a line?” The fix planner answers with its sources: 3:05 of credit per crew pair a day, +$1,240 a day and $24,800 for November, estimated from the credit rules. No crew line loses value — D4417A goes into the bid as a new two-day trip and D4417 becomes a day trip home.
- 06Signed
Approve, with a reason and an e-signature
Jordan Reyes · Crew PlannerShe approves fix A with reason A1 · Legal fix, lowest cost. The signature names her, her role and the time, and is bound to the record. Her waiting list drops from 18 to 17, and the check, the recompute, the fix, her question and her decision go onto the audit trail.
“Signed electronically as Jordan Reyes, Crew Planner · the signature is bound to this record.”
- 07The rest of the list
Every finding, in plain words, with its rule
Jordan Reyes · Crew PlannerThe Pairings screen is the crew legality check for the whole bid period — what the agents found and the fix for each: D2208's flight time 13:55 against 13:00 with three pilots on the 777-300ER, F7714's flight attendant rest at BOS 9:35 against 10:00 under 121.467, E0231 at Corvane Europe 12:25 against 12:00 under ORO.FTL.205(b), and at-risk pairings like D4473 with a 63% chance of needing an extension. Filters cut by status, rule and base; at-risk fixes can be approved in bulk with one reason.
- 08Rosters
October's flying counts against November
Roster checkerCapt. Ray Medina, a JFK 777-300ER captain, reaches 103:20 flight hours in the 672 hours ending Thu 12 Nov, against 100:00. The window starts with his flown GRU–JFK on Fri 16 Oct, held 30 minutes over, then the October roster and his November bid line. The roster checker proposes giving D2216 on 10–12 Nov to reserve Capt. Ines Duarte, which brings him to 83:45.
The roster checker never swaps a trip; it proposes, and a planner approves or returns it with a reason.
- 09Same morning, 09:31 ET
A reserve, not an extension
Operations monitor · Megan Castillo, Crew Scheduling ManagerA ground stop for New York arrivals held CV 2052 BOS–JFK 1:25, so D2051 is projected at 13:05 against 12:30. Extending 0:35 would need Capt. Tom Halvorsen's agreement and an FAA report within 10 days. The operations monitor recommends short-call reserve pilots R-JFK-14, Capt. Harold Quinn and FO Mia Santos, for the last leg, CV 2071 JFK–PIT; the original crew ends at 10:40 of 13:00. Megan assigns the reserve.
The operations monitor never extends a duty period: the captain agrees and the scheduling manager records it.
- 108 days left
The FAA 10-day report, drafted from real times
Rebecca Hollins · Flight Operations Compliance ManagerSaturday's D2033 ran 0:48 past its 12:00 limit after CV 2033 MSP–BOS diverted to BUF with BOS below minimums in fog. The operations monitor drafted report R-2026-031 under 14 CFR 117.19(b)(4) from the out-off-on-in times and Capt. Lena Forsberg's agreement in the crew app: the extension came after takeoff and the cause was weather, so the rule asks only for the report. It is due Tue 27 Oct; Rebecca signs and submits.
“The compliance manager signs; the agents never submit.”