- Before
- Teaches five periods, then writes reports at night in report card week, copying numbers from three systems and judging each goal by eye.
- Now
- Opens each report already drafted from cited points, decides the goals the agents flagged, and signs her caseload in an afternoon.
One IEP progress report, from the data in to the report going home
Lina K. is in grade 6 at Linden Avenue Middle School in Marlow Bay Unified. Her IEP has four goals, her parents read Vietnamese, and period 1 reports go home with report cards on Friday, October 30. Here is her report, screen by screen, in the working solution.
- 01Wed, Oct 21, 3:40 p.m.
The period, and what needs her today
Joanna Reyes · IEP case managerJoanna's view opens on the period's path: data cutoff Oct 16, late data closes Oct 23, sign by Oct 27, the coordinator sample Oct 28–29, home with report cards Oct 30. The agents' brief says all 81 goals on her caseload are drafted from cited data points, and Needs you lists four data requests, a Spanish question about Mateo's reading and five reports ready to sign.
- 02One click
Lina's IEP progress report, one row per goal
Joanna ReyesEach goal is a row: a small chart with the baseline, the dashed aimline and every probe with its value, then the drafted narrative for the family, then the rating with the agent's reason and confidence. Goal 1, reading fluency, is on track: seven points from 80 to 86 words correct per minute, projected about 116 of 115, confidence 0.97.
4 goals, 19 data points, each cited.
- 03Any point
Every data point opens its score sheet
Data agentPoint 4 of 7 on Goal 2 is Mixed computation, grade 5, form 4, given by Ari Brennan on Wednesday, September 23: 16 correct digits in 2 minutes against an aimline of 16.4 that day. The Data agent read it from the progress monitoring assessment platform and matched it exactly to Goal 2's measure.
- 04Rule 4.2
Four points in a row below the aimline
Trend agentGoal 2's seven scores run 15, 16, 17, 16, 16, 17, 17. The aimline needs 0.72 correct digits a week; the trend is 0.25, which projects about 24 of 40 by May. The last four fell below the line, so a plain band lights across the row and the Trend agent cites the district's rule 4.2.
Rule 4.2 tripped: 4 in a row below the aimline · recommends an IEP team meeting · the case manager decides.
- 05Her decision
The agent recommends a meeting; the case manager decides
Joanna ReyesThe recommendation quotes the rule, lists the four scores with the aimline value for each date, and checks the services: 24 of 25 sessions delivered, so the plan, not attendance, is the question. Joanna has three choices: propose a team meeting, change the intervention first, or not now, the last two with a reason.
- 06Drafted
The IEP team meeting, drafted with an interpreter
Family language agentJoanna proposes the meeting. The agents draft the participants under 34 CFR 300.321 (both parents, Joanna, the math 6 teacher, Ari Brennan and the coordinator), Linh Tran as Vietnamese interpreter under 300.322(e), three times in Room 114 and an agenda. Nothing goes out until Linh checks the Vietnamese and sends it herself.
- 07The reply
The parents answer in Vietnamese, beside the English
Linh Tran · Parent liaisonMai Kiều replies in Vietnamese, and the school reads it beside its English translation at confidence 0.97. Joanna accepts the time in one click.
"Thank you, Ms. Reyes. Thursday, November 5 at 3:30 p.m. works for us. My husband will come too. Does Lina need to come with us?"
- 08Due tomorrow
No rating without enough data
Hannah Brooks · English Language Arts 6Goal 3, written expression, had two writing probes, and the district rates a goal only on three or more, so the Sufficiency agent wrote no rating and no narrative and asked Hannah for one. Her own view shows only the goals she measures, never the whole IEP or the disability category. She enters the Oct 16 score in one step and Goal 3 can be rated.
- 09Signed
Reviewed, signed, and checked in Vietnamese
Joanna Reyes and Linh TranJoanna reviews the four goals and signs. The report now has 20 data points, each cited, and none without enough data; Goal 2's band reads "meeting set for Thu, Nov 5, 3:30 p.m." Linh reads each Vietnamese narrative beside the English before the report goes home.
- 10Oct 28–29
A coordinator sample that looks where problems are
Gwen Talbot · Special education coordinatorThe sample at Linden Avenue holds 24 of 126 reports: 11 always, because a rule tripped or a rating was changed, and 13 drawn at random. The Sample agent pre-checks six things on each; on Owen M.'s report the narrative says "from 12 to 18" while the data shows 12 to 16, and Gwen returns it with a reason.