SearchPower Generation & Desalination

Plant Operating Procedure Search

Power plant knowledge management with AI search: the approved procedure, cited and drawn on the P&ID in step order

Every answer drawn on the plant diagram, so the right valves close in the right order.

See one case, screen by screen ↓
demo1valveon the current drawing that the procedure missed: V-122B, drawn in amber and confirmed by the shift supervisor before the fitter started
target100%of isolation answers checked against the current drawing revision, steps in order
estimated$1.1Ma yearin lost output avoided: 2 fewer operator-error trips × $550K a trip
target9monthsfor a new control-room operator to stand a shift alone, not 18
The problem

Why the right procedure is hard to find at 2 a.m.

When a feed pump starts vibrating on night shift, the answer sits in three or four places: the operating procedure, the pump maker's O&M manual, the P&ID and the shift logbook. A plant like the demo's Saltmere station has 412 procedures for one block, 2,140 drawings and 184,500 logbook entries. The procedure says which valves to close. It does not say where the valve is, whether a plant change has added one since it was last reviewed, or why the order matters.

Isolations are where people get hurt, and a wrong valve or a wrong order can also trip the unit. The written, equipment-specific procedure is the control, and under OSHA 1910.269(d) the isolation must be verified before work starts. The people who know which valve passes on close and which one is behind the coupling guard are often the senior operators closest to retirement, and their knowledge lives in their heads and in logbook notes nobody can search.

typical120deaths a yearand 50,000 injuries prevented by lockout/tagout compliance, by OSHA's estimate
typical30+%of operators eligible to retire within 5 years at many utilities
typical$500K–$2Ma tripfor a combined-cycle forced outage, counting lost output, replacement power and restart
Where a control-room operator's procedure days go, in a yearestimated
By hand25 days
With the solution6.5 days
  • Finding the approved procedure and its current revision6 → 1 d
  • Finding each valve and breaker on the P&ID and in the plant5 → 1.5 d
  • Checking the drawing against the procedure after plant changes3 → 0.5 d
  • Finding the alarm response for an active alarm3 → 0.5 d
  • Searching the logbook and ringing senior staff for the why4 → 1 d
  • Writing the isolation sheet for the field operator4 → 2 d

Estimated split of the working days one control-room operator spends a year finding and checking procedures, by hand and with the solution. Our estimate, not a measured figure; the pilot measures it on the plant's own shifts.

How it works

How a question becomes steps on the drawing

Six specialist agents find the procedure, place every step on the current drawing and read the logbook; the shift supervisor confirms, the procedure owner decides what changes.

What comes in
Sources in9,832 documents · procedures, manuals, alarm responses, drawings, logbook
Agents at work
Question readerunit, tag, intent
Then
Procedure finder
Drawing mapper
History reader
Then
Answer writercited steps
Then
Procedure gap watcherdrawing vs procedure
A person decides
Shift supervisorconfirms and approves
What comes out
Steps on the P&ID
Isolation sheet to the field
Gap to the procedure owner
One case, step by step

One isolation, from the alarm to a pump handed over

Tue 13 Oct 2026, night shift on Block 2, a 720 MW combined-cycle unit at Lumina Utilities' Saltmere Power and Water Station. HP boiler feed pump 2B is vibrating, and the fitter is booked for 06:00. Here is what happens next, screen by screen, in the working solution.

  1. 0102:14

    The alarm comes with its response

    Yusuf Karimi · Control-room operator, Block 2

    BFP-2B NDE bearing vibration high, 7.1 mm/s, on 2-FW-VT-2B. Every alarm in the last 24 hours from the DCS alarm journal is linked to its alarm response procedure. ARP-B2-FW-0412-07 gives the cause, what happens if nobody acts, the operator action and the time to respond: 15 minutes.

    “If nobody acts: trip at 11.0 mm/s; one pump left, block runs back to 60%.”

  2. 0202:31

    “How do I isolate feed pump B?”

    Yusuf Karimi · Control-room operator, 8 months in the job

    At 02:22 shift supervisor Rafael Okonjo decided to change over to standby pump 2C and isolate 2B for work order WO-2026-48817. Yusuf types the question in plain words. The question reader finds Block 2, BFP-2B and the intent, isolate for maintenance; the procedure finder returns SOP-B2-FW-214 rev 6 and the pump manual §6.3 and §6.5.

    “Searching 7,692 documents, 2,140 drawings and 184,500 logbook entries…”

  3. 034.8 seconds later

    Ten cited steps, drawn on the P&ID

    Answer writer and Drawing mapper

    The answer is SOP-B2-FW-214 rev 6, approved 2 Jun 2023 by Priya Natarajan: 10 steps, 5 valves to close, 2 to open, from 7 sources. Every tag is numbered on drawing 2-FW-PID-0412 rev F in step order — orange to close, blue to open, violet for breaker 2BA-07 on the 6.6 kV board. Each step names who does it and cites its section.

    Drawing mapper: “14 tags on 2-FW-PID-0412 rev F · 1 not in the procedure”

  4. 04Play on the drawing

    The drawing shows a valve the procedure misses

    Yusuf Karimi · Control-room operator

    Play walks the steps one at a time: each valve pulses, its line stops flowing and the step lights up. At step 6 the minimum-flow isolator 2-FW-V-121B has a second valve beside it. Plant change MOC-2025-031 added a bypass in March 2025, and the procedure was never updated. The extra valve is drawn in amber and the step is marked for the shift supervisor.

    “Also close 2-FW-V-122B on the bypass. Drawing rev F shows it (plant change MOC-2025-031); SOP rev 6 does not. It was found open on 2B on 2 Oct.”

  5. 05One click

    Every valve carries its history

    History reader

    Clicking a valve opens its card. Discharge valve 2-FW-MOV-112B is a motorised gate valve, DN250 PN250, in the feed pump house mezzanine at +4.5 m, above 2B, with its actuator supply at MCC-2F cubicle 14. Its card says it passed on close on 19 May 2024 and was re-seated under WO-2024-31206 on 11 Jun 2024, and points back to step 4.

    Step 4: “This valve passed on close on 19 May 2024; re-seated June 2024. Step 8 is your check.”

  6. 06Discharge first, suction last

    Why the order matters, from the plant's own events

    History reader

    Under the drawing, the reason for the order sits beside its source. RCA-2023-017: on 9 Aug 2023 the suction relief on BFP-1A lifted at 22 bar because suction was shut while the discharge valve was passing; the 5-minute hold in step 8 was added in rev 6. Tomasz Wrona's logbook note of 19 May 2024 records MOV-112B passing on close, with suction creeping to 14 bar, and the pump manual §6.3 says the suction side is not rated for discharge pressure.

    “A logbook note explains a step; it never becomes one.”

  7. 0702:44

    The supervisor confirms the marked step on shift

    Rafael Okonjo · Shift supervisor, Block 2

    The drawing-against-procedure check shows 13 of 14 tags matching, 1 on the drawing but not in the procedure, and that MOC-2025-031 asked for this review 19 months ago. Yusuf sends it to Rafael with one click. Rafael confirms V-122B, and gap GAP-0047 goes to the procedure owner.

    “Rafael Okonjo confirmed V-122B on shift · 02:44 · GAP-0047 sent to Priya Natarajan”

  8. 08Sent to the field

    The sheet goes to the tablet, and the section is isolated

    Liam Carver · Field operator

    Send to field puts all 10 steps with the drawing on Liam Carver's tablet, and he ticks each one as he does it. When the steps are done, the isolated section of pipe is hatched on the drawing. Casing vent V-131B and drain V-132B are open, PI-133B reads 0 bar and TI-134B is below 60 °C. The shift supervisor proves zero energy and hands the isolation to the authorised person for the permit to work.

    “2B isolated on the drawing · 5 valves closed in order · ready to prove zero energy”

  9. 09On a 10-day clock

    The gap arrives with evidence and drafted wording

    Priya Natarajan · Operations engineer, procedure owner

    GAP-0047 lands in Priya's queue on a 10-day clock. It sets what SOP-B2-FW-214 rev 6 §5.6 says beside what the current drawing shows, crops the drawing at grid C4–C6 and drafts the new wording for her to edit. The evidence is the drawing, MOC-2025-031 §3 and the shift logbook. Nothing in the procedure changes until she raises a change request and the review board approves.

    Drafted: “5.6 Close the minimum-flow isolator V-121x downstream of the recirculation control valve and the bypass isolator V-122x.”

  10. 10Before the next isolation

    Practice on the real drawing, with the senior operator's tips

    Yusuf Karimi · trainee record

    Practice asks Yusuf to click the valves in the order he closes them, on the real drawing, from the approved procedure plus V-122B, confirmed tonight. Beside it are tips recorded from senior staff, each with its source. Yusuf has 2 of 3 clean runs for an HP feed pump isolation, and 14 of 22 Block 2 isolations practised.

    Tomasz Wrona, 31 years: “Discharge first, suction last. Then stand and watch the suction gauge for the full five minutes. That valve has passed before.”

Who it’s for

Built for everyone on the shift, and the people behind the procedures.

The same isolation, seen by the five people it touches — what their night looked like, and what it looks like now.

YK
Yusuf KarimiControl-room operator, Block 2 · 8 months in the job
Control-room operator
Before
Runs the DCS on nights and writes isolations for the field operators. “I know where the procedure is. I don't know where valve 118B is.”
Now
Asks in plain words and gets the approved steps drawn on the current P&ID in order, with the reason for the order and the valve history beside them.
RO
Rafael OkonjoShift supervisor, Block 2 · approves every isolation and changeover on shift
Shift supervisor
Before
Approves every isolation and changeover on shift. “If the drawing and the procedure disagree, I want to know before the fitter does.”
Now
Gets every step that comes from the drawing and not the procedure marked for his confirmation, with the drawing, the plant change and the logbook behind it.
LC
Liam CarverField operator · walks the plant, operates the valves, hangs the locks
Field operator
Before
Walks the plant, operates the valves and hangs the locks. “Tell me the valve, the floor and the order. On my tablet.”
Now
Gets the steps with the drawing on his tablet, where each valve is and how to reach it, and ticks each step as he goes.
TW
Tomasz WronaSenior operator · 31 years · retires 18 Dec 2026
Senior operator
Before
The person everyone rings at 2 a.m. “Discharge first, suction last. I learned that the hard way.”
Now
His tips are recorded beside the steps they explain, each with its source, and stay on the drawing after he retires.
PN
Priya NatarajanOperations engineer · owns 412 Block 2 procedures
Procedure owner
Before
Reviews every change to a procedure; a 2025 plant change was still waiting for its procedure review. “Show me the evidence and the drawing, and I will fix the procedure.”
Now
Gets each gap with the procedure text, the current drawing, the evidence and drafted wording, on a 10-day clock.
Built on the engine

6 agents. Each with one job, and hard limits.

Six specialist agents find the procedure, place every step on the current drawing and read the logbook; the shift supervisor confirms, the procedure owner decides what changes.

Question reader

Reads the question with the active alarms and open work orders for the operator's unit, and finds the unit, the equipment tag and the intent: isolate, return to service, respond to an alarm, or explain.

  • Never guesses a unit; asks when two pieces of equipment match
  • Read-only
Procedure finder

Searches operating, emergency and alarm response procedures, OEM manuals and bulletins for the equipment and intent, and returns the latest approved revision.

  • Never answers from a draft or superseded revision
  • Every passage cites document, revision, section and page
Drawing mapper

Places every tag in the steps on the current approved P&ID revision, traces the line the step isolates and reports any isolation point the procedure does not name.

  • Never invents a tag or a position
  • A tag not on the drawing is flagged, never drawn
History reader

Reads the logbook, root-cause reports, work orders and plant changes that name the tags in the answer, and picks the events that explain a step or warn about how a valve behaves, quoted with author and date.

  • A logbook note explains a step; it never becomes one
Answer writer

Writes the answer as numbered steps from the approved procedure, quoting safety-critical steps word for word, and adds a step only when the drawing mapper finds an isolation point the procedure misses.

  • Never rewrites a safety step
  • Every step cited
  • Marked steps need the shift supervisor
Procedure gap watcher

When a marked step is confirmed, or a plant change closes with a procedure to be reviewed, opens a gap for the procedure owner with the evidence and drafted wording, and tracks the 10-day clock.

  • Never changes a procedure
  • Drafts only; the owner decides
Shift supervisor

Confirms marked steps on shift. The agents propose; a named person decides.

Ask in plain words

Ask about any procedure, valve or past event

Ask in plain words. Every answer names its source and points to the place on the drawing.

Why close the suction valve last?

Because the suction side is not rated for discharge pressure. The pump manual says shut the discharge valve before the suction valve (Brennmoor HDX manual §6.3, p. 88). At Saltmere it happened: in RCA-2023-017 the suction relief on BFP-1A lifted at 22 bar when suction was shut against a passing discharge valve. That is why step 8 holds for 5 minutes and watches PI-104B.

Which procedures name the minimum-flow valves?

Four procedures name 2-FW-V-121x. Three also name the bypass isolator V-122x added by MOC-2025-031: SOP-B2-FW-215 rev 4, SOP-B2-FW-221 rev 2 and the FCV-120x maintenance procedure. SOP-B2-FW-214 rev 6 does not: that is GAP-0047.

Has MOV-112B ever passed?

Once on record. 19 May 2024, Tomasz Wrona, night shift: “MOV-112B passing on close — suction crept to 14 bar with suction shut.” It was re-seated on 11 Jun 2024 under WO-2024-31206 and has held on every isolation since, most recently 4 Jun 2026.

Set up a practice run of this isolation for Yusuf

Done. The practice uses the approved steps of SOP-B2-FW-214 rev 6 plus V-122B, confirmed tonight, on drawing 2-FW-PID-0412 rev F. Yusuf has 2 of 3 clean runs; one more and Rafael can sign him off for feed pump isolations.

Every screen

The working solution, as it ships.

13 screens from the working solution, on its sample data. Pick one to see it large.

Ask on the drawingThe shift context, the question, the agent trail, and the answer drawn on the P&ID in step order beside the cited steps.
AlarmsThe last 24 hours from the DCS alarm journal, each alarm linked to its response procedure: cause, consequence, operator action and time to respond.
Agents at workSix agents read the question, find the approved procedure, map every tag on the current drawing and read the logbook.
Play on the drawingThe steps played one by one on the P&ID, with the valve the procedure misses marked in amber for the shift supervisor.
A valve's cardType, location, normal position, last operated and passing history, with the step that uses it.
The section isolatedAll ten steps done, the isolated section hatched, and the zero-energy check and handover to the authorised person.
Why this orderThe root-cause report, logbook note and manual section behind the order, the drawing against the procedure, and the shift supervisor's confirmation.
The procedureThe approved procedure with the lines the answer cites highlighted, and margin notes from the drawing, the manual and the logbook.
Past eventsLogbook entries, root-cause reports, work orders and plant changes that name the pump or its valves, newest first.
DocumentsEverything the answers are drawn from, by type, with revision, status and how many drawing tags each is linked to.
Procedure gapsWhere a procedure and its current drawing, manual or bulletin disagree, with the evidence and drafted wording for the procedure owner.
PracticeClick the valves in the order you close them, on the real drawing, beside senior staff's recorded tips and the trainee's record.
Your rulesSources in order of precedence, the drawing rule, who confirms marked steps, the gap owner, the practice rule, the alarm feed and languages.
Governance

Built for isolations: cited, confirmed, on the record.

Every step cites its sourceEach step cites a document, revision, section and page, or a drawing and its revision, or a logbook entry with its author and date. Read the procedure opens the document with the cited lines highlighted.
Safety steps quoted, never rewrittenSafety-critical steps are quoted word for word from the approved procedure. Draft and superseded revisions are kept for the record and never answered from.
The current drawing onlyAnswers are drawn only on the current approved P&ID revision. A tag missing from the drawing blocks the drawing and is flagged; nothing is placed by guesswork.
The shift supervisor confirms marked stepsA valve on the drawing but not in the procedure becomes a marked step until the shift supervisor on duty confirms it. The difference is never a silent change.
Agents never operate plantThe agents find, map and cite. They never operate plant, issue isolations or permits, or change a procedure. The authorised person issues the permit to work, and the procedure owner and review board approve every change.
Every answer on the recordThe question, the sources read, the answer and drawing revision, the steps ticked in the field, the confirmations and the gaps raised are all recorded with who and when.
Configuration

Your plant's rules, in your order of precedence

What the answers may draw on, in what order, and who confirms what. Changes are saved as a new version with their author.

SettingDefaultChoose from
Approved operating and emergency proceduresInstruct · always firstLocked on: this row protects every answer
Alarm response proceduresInstructLocked on
OEM O&M manuals and bulletinsExplain and confirmOn · Off
Drawings, current approved revision onlyPlace every tagLocked on
Root-cause reports and plant changesExplain whyOn · Off
Shift logbookExplain; never a stepOn · Off
Draft and superseded revisionsNever answered fromLocked off
A valve on the drawing but not in the procedureMarked step · shift supervisor confirmsConfirmed by the shift supervisor on duty
Connections

Works with the documents your plant already runs on

Operating and emergency proceduresstandard, emergency and alarm response procedures, with revision, status and owner
OEM O&M manuals and bulletins1,284 manuals and 618 technical bulletins in the demo plant, cited to section and page
P&IDsthe current revision of every drawing, each tag placed on its symbol
DCS alarm journalalarms read every 30 seconds and linked to their response procedures
Shift logbook and RCAslogbook entries since 2014 and root-cause reports since 2009, linked to tags
Work orders and plant changeswork order history and management-of-change records for the equipment
What it changes

The difference, in numbers.

Every figure is labelled: a target the solution is built to, an estimate, a typical published result, or a proven one.

target
100%
of isolation answers checked against the current drawing, steps in order
estimated
$1.1Ma year
in lost output avoided: 2 fewer operator-error trips × $550K
Trips today6 a year
With answers on the drawing4 a year
target
9months
for a new operator to stand a shift alone, not 18
9 of 18 months
time to stand a shift alone

“demo” = seen in the working solution, on its sample plant data · “target” = the design goal, measured in the pilot · “estimated” = our arithmetic on the demo plant's inputs, replaced by the customer's: 6 operator-error trips a year, a third fewer = 2 trips × $550K a trip (the low end of the published range); the days split is our estimate · “typical” = published figures: OSHA via ISHN (lockout/tagout compliance prevents about 120 deaths and 50,000 injuries a year); Power Engineering (30 %+ of operators eligible to retire within 5 years); combined-cycle forced outage $500K–$2M per event (vendor sources, directional). OSHA 1910.269(d) is named as context. Lumina Utilities, Saltmere Power and Water Station and the people, equipment, documents and records named on this page are fictional — characters and sample data in the working solution.

Questions

What plant operations teams ask us.

What is plant operating procedure search?

AI search for plant staff that answers from the plant's own operating procedures, OEM O&M manuals, alarm responses and drawings, with citations. Plant Operating Procedure Search returns the approved steps, each cited to section and page, drawn on the current P&ID in step order, with the past events that explain the order.

How does power plant knowledge management AI search work?

Six agents work on each question. They read the question and the shift context, find the latest approved procedure and manual sections, place every tag on the current drawing revision, and read the logbook, root-cause reports and plant changes. Then they write the cited steps and raise any difference between the procedure and the drawing as a gap. In the demo, one isolation answer took 4.8 seconds and drew on 7 sources.

What happens when the procedure and the drawing disagree?

The drawing mapper finds isolation points on the current drawing that the procedure does not name. The step is marked in amber, and the shift supervisor confirms it on shift. The procedure owner then gets a gap with the evidence and drafted wording. The procedure itself changes only through a change request and the review board.

Does it replace our permit-to-work or lockout/tagout system?

No. It supports the written, equipment-specific procedure and its verification step: the steps, the order, where each valve is and the zero-energy check. The authorised person still issues the permit to work, and the agents never operate plant or issue isolations.

Does it work for desalination plants and alarm response?

Yes. The demo plant's extraction steam feeds MSF desalination units, and the same answers cover desal unit 6 procedures and alarms such as brine heater outlet temperature high. Every alarm from the DCS alarm journal is linked to its response procedure and can be shown on the drawing. The demo plant's settings list English and Arabic as its languages.

How does it help new operators and keep senior operators' knowledge?

New operators practise each isolation on the real drawing from the approved procedure, with 3 clean runs and a supervisor sign-off before they write one. Senior staff's tips are recorded beside the steps they explain, each with its source. The aim is a new control-room operator standing a shift alone in 9 months, not 18.

Do operators and supervisors stay in control?

Yes. The agents find, map and cite; they never rewrite a safety step, answer from a draft or change a procedure. The shift supervisor confirms marked steps, the authorised person issues permits and the procedure owner decides every change. Each answer, confirmation and gap is on the record.

How long does it take to go live?

The Agentic Solution Engine builds and deploys it from your requirements and documents — your procedures, OEM manuals, alarm responses, P&IDs and logbook — and it goes live once every quality gate has passed. We will walk you through it on your own procedures and drawings first.

See it on
your procedures.

We'll run Plant Operating Procedure Search on a sample of your own procedures, manuals and drawings.