Priority Services Register Management

Priority services register management that calls every medically dependent home before the power goes off

Every medically dependent home inside an outage called before the power goes off.

See one case, screen by screen ↓
demo13of 13medically dependent homes inside the Mill Lane job with a welfare call queued a week before the power goes off
target100%of medically dependent homes inside a planned outage called before the power goes off
target0missednotices to register households: 5 working days ahead, against a 2-day legal floor
demo38customersfound in one week from what they said on calls, chats, emails and payment changes, who were not on the register
The problem

What is a priority services register, and why does it miss people?

A Priority Services Register is the list a utility keeps of households who need extra help: people who depend on electricity or water for medical equipment, older customers, people with sight, hearing, mobility or mental health needs, and families with young children. In Britain every energy supplier and network operator must keep one and give its services free — advance notice of planned interruptions and help during an outage — and water companies run one too. Priority Services Register Management is software that finds those customers, registers them with their consent and protects them on the day of an outage.

The register is only as good as what goes into it and what comes out of it on the day. Needs are said out loud and lost: a billing call about a high bill ends with a payment plan, not a registration. Registration waits for a form, then for someone to code it. Supply, network and water records drift apart, temporary needs never expire and two-yearly re-checks slip. And when a planned outage is drawn up, the planner gets a spreadsheet of addresses, not a list of people to ring — so a home on oxygen can sit inside a planned cut with nobody calling first.

typical5 of 17suppliershad severe weaknesses in how quickly struggling customers were added to the register, in Ofgem's compliance review
typical13%of customers were on the register when Ofgem widened eligibility in 2016 — about 3.6 million electricity and 3 million gas customers
Where the hours go before one planned outageestimated
By hand21 days
With the solution3.1 days
  • Turning the works order into a list of who is inside6 → 0.1 d
  • Sorting which homes need a call, a visit or a generator4 → 0.5 d
  • Finding customers who said a need but are not registered3 → 0.5 d
  • Asking consent and coding the needs2 → 0.5 d
  • Drafting notices and welfare call scripts4 → 1 d
  • Planner sign-off and sharing with networks and water2 → 0.5 d

Estimated split for one planned interruption of about 1,500 supply points, in working hours, by hand and with the solution.

How it works

How a household is protected

Six agents find, register and protect vulnerable customers; the care team takes consent, signs and dispatches.

What comes in
Signals in4 sources · calls, emails, needs forms, outage plans
Agents at work
Need findersaid, not registered
Then
Registration clerk
Register sharer
Then
Outage matcherwho is inside
Then
Welfare call planner
Re-check agent
A person decides
Care teamconsent, sign-off, dispatch
What comes out
Register coded and shared
Notice list for every outage
Welfare calls and generators
One case, step by step

One planned outage, from the works order to a call at every door

Lumina Utilities supplies electricity and water, and its register holds 61,240 households. On Tuesday 13 October 2026 at 09:40, Grace Adeyemi, its Priority Services team lead, opens the care map. A works order for next Thursday has just arrived. Here is what happens next, screen by screen, in the working solution.

  1. 0109:40

    The register on a map, under every outage

    Grace Adeyemi · Priority Services team lead

    Register households are quiet dots on the Lumina area; medically dependent homes are teal rings. Three footprints sit over them: a live fault on feeder ASH-07 in Ashby Moor, a water main repair, WM-1127, in Holloway Cross on Wed 21 Oct, and works order WO-88412 from Tom Ellery, received at 09:12 — PO-26-0418, replacing pole transformer T-2214 on Mill Lane, Brackenford, Thu 22 Oct, 08:30–15:30.

    “The works order has no footprint yet. Draw it on the map to see who is inside, and what each home needs before the power goes off.”

  2. 02Since 06:42

    The live fault: three homes covered before nine

    Outage matcher and Welfare call planner

    Feeder ASH-07 tripped at 06:42 with 312 customers off, 11 of them on the register and 3 medically dependent. Kerry Shaw reached Agnes Thorley at 06:58 — her oxygen cylinders cover 9 hours. Dev Malhotra confirmed generator G-04 for Victor Mensah's home dialysis, on site at 08:05. Ruth Dangerfield missed two calls, so Ollie Grant visited at 08:40. All three carry a priority restoration flag.

    Run log, 06:44: “11 register households inside, 3 medically dependent; priority restoration flags set.”

  3. 03Footprint drawn

    Twelve homes light up, each with a call queued

    Outage matcher · Welfare call planner

    Grace draws the Mill Lane footprint, eight points around feeder BRK-14. In about a second each, the agents find 1,486 supply points inside and 47 households on the register, 12 of them medically dependent. Each of the twelve gets a welfare call queued for Thu 15 Oct, five working days ahead. Three — no 8-hour battery, a 7-hour job — are proposed a generator, for Dev Malhotra to confirm.

    “7 Mill Lane is not on the register · Need finder · ‘oxygen concentrator’, billing call 6 Oct”

  4. 04Tue 6 Oct, 11:14

    A need said on a billing call, never registered

    Need finder

    Harold Pennington rang Aisha Bello about a £146.20 bill. Usage was up about forty per cent since July, mostly overnight. At 01:15 into the call he said why. The call ended with a £38 a month payment plan and no register offer. At 11:31 the need finder matched “concentrator”, searched the register by account, name and address in supply, networks and water, and found no record.

    “It's June's oxygen machine — the concentrator. It runs all night since she came out of hospital in July.”

  5. 0509:52

    Grace asks June for consent, the same day

    Grace Adeyemi · Priority Services team lead

    June's home is inside Thursday's outage, so Lumina's consent policy says ask today. Nothing about her health is stored or shared until she agrees. Grace sends the text the registration clerk drafted, in consent wording version 3, and books a call-back with Aisha Bello between 10:30 and 11:00.

    “Our Priority Services Register lets us phone you before planned power cuts and help if the power goes off, free of charge … May we add you?”

  6. 0610:52

    Consent recorded by a person, on the call

    Aisha Bello · Contact centre agent, billing

    Aisha calls June back. In 3 minutes 40 seconds she reads wording v3 in full and June agrees, for herself. The record holds the needs codes MD-04 Oxygen concentrator and PA-10 Pensionable age, her backup — 1 oxygen cylinder, about 5 hours, a second ordered — and her daughter Sarah Pennington as a contact.

    Agents never register anyone: consent is recorded by a person.

  7. 0710:58

    Registered, re-check set, shared the same day

    Registration clerk · Register sharer

    The registration clerk codes the needs and sets the re-check for October 2028. The register sharer sends the needs code and contact — no medical detail — to Lumina Networks and Lumina Water. June joins the PO-26-0418 notice list with a welfare call on Thu 15 Oct. This week's Found list now shows 22 registered.

    “Nobody is added without their consent.”

  8. 08Notice list signed

    48 households told, three generators booked

    Tom Ellery · outage planner, and Dev Malhotra · welfare coordinator

    The footprint now holds 48 register households and 13 medically dependent homes. Dev books G-02 for Rhys Calloway's ventilator (battery about 2 hours), G-07 for Brenda Achterberg, who dialyses at home on Thursday mornings with no backup, and G-11 for Samuel Osei, 6, whose feeding pump runs about 3 hours on battery. Tom signs the notice list.

    Notice clock: register households told Thu 15 Oct, 5 working days ahead · Tue 20 Oct is the 2-day legal floor · power off Thu 22 Oct.

  9. 09Thu 15 Oct, from 09:00

    Thirteen calls, each with a script from the need

    Welfare call planner

    Every medically dependent home inside the job is called by a person, oxygen and life-sustaining equipment first. For Margaret Hollis, the script checks her oxygen cylinders and, since the job is 7 hours, orders one from Calderline Oxygen for Wed 21 Oct if hers cover less than 8. The caller records Reached, No answer, Needs a visit or Ask for a generator.

    “Script set by the welfare call planner from the need code · you decide what to offer.”

  10. 10The rest of the month

    The register kept true, with nobody dropped

    Re-check agent

    2,148 households are due a re-check in October and 386 are overdue. When Grace sends October's run, the re-check agent drafts 1,644 texts and 504 letters, asks 164 households whose temporary need is ending whether help is still needed, and moves the overdue ones to phone calls. Forty-one households with three tries and no reply go to Grace.

    “Nobody removed · 41 households after 3 tries go to Grace Adeyemi.”

Who it’s for

Built for everyone who keeps a household safe in an outage.

The same planned outage, seen by the four people who carry it — what their week looked like, and what it looks like now.

GA
Grace AdeyemiPriority Services team lead, Lumina Utilities · owns the register
Priority Services team lead
Before
Approves registrations and answers for re-checks and sharing on a register of 61,240 households. “The register says 61,000. I want to know who is under Thursday's outage.”
Now
Sees every live and planned outage over the register, with a care action on each medically dependent home and the customers found from what they said.
TE
Tom ElleryNetwork outage planner, Lumina Networks · owns the notice list
Network outage planner
Before
Plans 40–60 planned interruptions a month. “I send a list of addresses. I never know which one has a ventilator.”
Now
Signs a notice list built from his footprint: each register household by need, its channel, its action and the notice deadline.
AB
Aisha BelloContact centre agent, billing · takes about 70 calls a day
Contact centre agent
Before
Hears needs the register never learns about. “She told me about the oxygen machine. I didn't know where to put it.”
Now
Gets the call-back booked with the consent wording ready, and records consent in one step that registers the customer and shares the record.
DM
Dev MalhotraField welfare coordinator · 14 mobile generators and the doorstep team
Field welfare coordinator
Before
Dispatches the generators and the doorstep welfare team. “Give me the three homes that need a generator, not three hundred.”
Now
Confirms the generators the rule proposes — three for Mill Lane, each with the equipment and its battery time on file.
Built on the engine

6 agents. Each with one job, and hard limits.

Six agents find, register and protect vulnerable customers; the care team takes consent, signs and dispatches.

Need finder

Reads call transcripts, chats, emails and payment changes for needs the register should know about — equipment, sight, hearing, mobility, age, young children, recovery — quotes the sentence, suggests a needs code and searches the register by account, name and address. A home inside a planned outage is marked “ask today”.

  • Never registers anyone
  • Never infers a condition the customer did not state
  • Payment behaviour alone is never a medical need
Registration clerk

Drafts the consent request in the customer's channel and language with the approved wording. When a person records consent, it codes the needs, sets the re-check date and any temporary end date, and hands the record on to be shared.

  • Never registers without consent recorded by a person
  • Stores needs codes, not medical detail
Outage matcher

Matches every live and planned outage footprint to the register, finds every supply point and register household inside, builds the notice list with channel and deadline, and sets priority restoration flags for medically dependent homes in a live fault.

  • Never changes an outage plan or its times
  • The planner signs the notice list
Welfare call planner

Orders welfare calls by risk, life-sustaining equipment first, writes each call script from the need, the backup on file and the outage length, proposes generators by rule, and in a live fault queues calls within 30 minutes and sends the doorstep team after two missed calls.

  • Never dispatches a generator — the welfare coordinator confirms
  • Never closes a call without an outcome
Register sharer

Keeps the register in step with Lumina Networks, Lumina Water and the suppliers on Lumina's network: medically dependent changes the same day, others nightly. It compares each partner's records and lists every difference with a suggestion.

  • Shares consented fields only — needs code, contact and services
  • Never overwrites a newer record
Re-check agent

Asks every household again every 24 months and before a temporary need ends: drafts texts and letters in each household's channel, moves overdue ones to calls, and sends households with three tries and no reply to the team lead.

  • Never removes a household
  • Three tries before a person reviews
Care team

Team lead approves, agent records consent, planner signs, welfare coordinator dispatches. The agents propose; a named person decides.

Ask in plain words

Ask about any outage, household or rule

Ask about an outage, a household, a call or a rule, in plain words. Every answer cites its source.

Who inside Thursday's works needs a generator?

Three homes inside PO-26-0418. Rhys Calloway's ventilator battery lasts about 2 hours; Brenda Achterberg dialyses at home on Thursday mornings with no backup; Samuel Osei's feeding pump runs about 3 hours on battery. The job is 7 hours, 08:30–15:30, and rule WR-2 proposes a generator under 8 hours of battery. Dev Malhotra confirms each one.

Why is June Pennington flagged?

On a billing call on 6 October her husband Harold said: “It's June's oxygen machine — the concentrator. It runs all night.” The need finder searched the register by account, name and address and found no record. Her home, 7 Mill Lane, is inside Thursday 22 October's planned outage, so policy VC-3 says ask for her consent today.

Is everyone in the Ashby Moor fault safe?

The fault on ASH-07 has 3 medically dependent homes inside, and all three are covered: Agnes Thorley was reached at 06:58 and her cylinders last 9 hours; generator G-04 has been at Victor Mensah's since 08:05 for his dialysis; Ruth Dangerfield missed two calls, so Ollie Grant visited at 08:40, and she is with her daughter. Power is expected back at 12:30.

How many re-checks are overdue?

386 of October's 2,148 re-checks are overdue. Rule RC-1 asks every household every 24 months and before a temporary need ends, and nobody is removed without a person. The October run is ready: 1,644 texts, 504 letters, 164 temporary needs ending. 41 households have had three tries and are waiting for your review.

Every screen

The working solution, as it ships.

13 screens from the working solution, on its sample data. Pick one to see it large.

The care mapRegister households and medically dependent homes on the map, with the live fault, the planned water job and a works order still to draw.
A live faultFeeder ASH-07: 312 customers off, 3 medically dependent homes reached, visited or on a generator, each with a priority restoration flag.
Footprint drawnTwelve medically dependent homes inside PO-26-0418, each with a welfare call queued, three generators proposed and one home not on the register.
What the customer saidThe billing call where the need was heard, the suggested needs codes, consent, sharing and the outage ahead.
Ask for consentThe consent request in the approved wording, with a call-back booked with the colleague who took the call.
Record consentWho gave consent, on which call and with which wording, the needs codes, backup, contacts and who the record is shared with.
Found from what they said41,820 contacts read this week, 38 customers not on the register, and June registered with consent, coded and shared.
The notice listEvery register household inside the footprint by need, its action and channel, the notice clock, generators booked and the planner's sign-off.
Welfare callsEach medically dependent home's call, ordered by risk, with a script written from the need and the backup on file.
The register61,241 households by need, re-check date, sharing and the outage ahead.
Re-checksRe-checks due by month, October's run of texts and letters, and the households that need a person's review.
SharingOne register kept in step with networks, water and two suppliers, and every difference listed with a suggested fix.
Your rulesMedically dependent needs codes, notice times, generator and welfare rules, consent and re-checks.
Governance

Consent first. People decide. Every step on the record.

Every flag quotes what the customer saidA found customer carries the sentence they said, the channel, the time, the colleague on the call and the register search behind it. Only what the customer stated is used.
Consent first, recorded by a personNobody is added without their consent. A person records it — who gave it, when, by which channel and with which wording version — and nothing about a customer's health is stored or shared before then.
People sign and dispatchThe team lead approves found customers, the outage planner signs each notice list and the welfare coordinator confirms each generator. Agents never register, remove, dispatch or change an outage plan.
A needs code, never a medical recordMedical detail is held as a needs code only. Sharing sends the needs code, contact and services to networks, water and suppliers — consented fields only — and every share is logged.
Nobody dropped from the registerRe-checks run every 24 months with three tries by text, letter and phone. A household that does not answer goes to a person for review; no agent can remove one. The 2-day legal minimum for notices cannot be lowered.
Every step on the recordEach agent step and each human decision — consent recorded, notice list signed, generator booked, difference resolved — is on the activity trail with its time. Every rule change is versioned and needs a second person.
Configuration

Your care rules, not ours

Needs codes, notice times, generator and welfare rules, consent wording and what the need finder listens for are settings. Every change is versioned and needs a second person.

SettingDefaultChoose from
Notice to register households5 working daysWorking days before a planned outage, by letter and text · medically dependent homes phoned as well · found customers inside a planned outage asked for consent the same day
Notice to every supply point2 daysThe legal minimum · locked, cannot be lowered
Propose a generator when the battery is shorter than8 hoursAnd a planned outage of at least 4 hours, or a live fault expected over 2 hours · dispatch always needs the welfare coordinator
Call medically dependent homes in a live fault within30 minutesDoorstep visit after 2 missed calls · priority restoration flag sent to the control room
ConsentRecorded by a personPhone, text, web form or letter · wording version 3 · a customer who declines is not asked again for 12 months
Re-check every household every24 monthsTemporary needs last 6 months unless the customer says otherwise · 3 tries by text, letter and phone before review · removal needs a person
What the need finder listens forVersion 7, 20 phrasesPhrases such as oxygen, dialysis, insulin in the fridge, careline, large print, speak for me · tested on last week's 41,820 contacts against a labelled sample of 600
SharingSame day to networksLumina Networks same day for medically dependent changes · Lumina Water nightly · Corrie Energy and Halden Power receive nightly and send back changes · needs code, contact and services only
Connections

Works with the records a care team already has

Calls, chats and emailscontact centre transcripts and customer emails, read for needs said out loud
Needs forms and medical evidenceself-declared needs and the evidence behind a registration
Payment and arrears historypayment changes, read only alongside what the customer said
Outage plans and fault logsplanned outage schedules, works orders and live faults from the control room
The register and customer recordsneeds codes, contacts, re-check dates and temporary needs
Partner register filesnetworks, water and the suppliers on the network, shared and reconciled
What it changes

The difference, in numbers.

Every figure is labelled: a target the solution is built to, an estimate, a typical published result, or a proven one.

target
100%
of medically dependent homes inside a planned outage called before the power goes off
13 of 13 homes
Mill Lane job, Thu 22 Oct
target
0missed
notices to register households: 5 working days ahead, against a 2-day legal floor
target
1day
from a need said on a call to a consent request, where today it is often never asked
Todaynot asked
With agentswithin 1 working day

“demo” = seen in the working solution, on its sample data · “target” = the design goal, measured in the live solution · “estimated” = our estimate · “typical” = published figures (Ofgem, Priority Services Register review and statutory consultation, 2016 — about 3.6 million electricity and 3 million gas customers, 13 % of customers, registered; The Energyst on Ofgem's compliance review of 17 suppliers, severe weaknesses at five in how quickly customers were added). Context: electricity standards of performance, at least 2 days' notice of planned interruptions (not re-checked against the regulations). Lumina Utilities and the people, streets, towns, suppliers and records named on this page are fictional — characters and sample data in the working solution.

Questions

What priority services teams ask us.

What is a priority services register?

It is the list a utility keeps of customers who need extra help — people who depend on power or water for medical equipment, older customers, people with sight, hearing, mobility or mental health needs, and families with young children. In Britain energy suppliers and network operators must keep one and offer its services free, including advance notice of planned interruptions and help in an outage.

What is priority services register management software for utilities?

Software that keeps the register complete and puts it to work on the day of an outage. Priority Services Register Management finds customers who mentioned a need, registers them with consent, draws the register under every live and planned outage, queues welfare calls and generators, and keeps the register in step with networks, water and suppliers.

How does it find vulnerable customers who are not on the register?

The need finder reads calls, chats, emails and payment changes for needs on Lumina's listening list, quotes the sentence and searches the register by account, name and address. In the working solution it read 41,820 contacts in one week and found 38 customers who were not on the register. It never infers a condition the customer did not state.

How does it protect medically dependent customers in a planned power cut?

When a planner's footprint is drawn, the outage matcher finds every register household inside and builds the notice list. The welfare call planner queues a call for each medically dependent home five working days ahead and proposes a generator where equipment has no 8-hour battery and the outage is 4 hours or longer. The planner signs the list; the welfare coordinator confirms each generator.

What happens in a live fault?

The outage matcher finds the register households inside the fault and sets priority restoration flags for medically dependent homes. Welfare calls go out within 30 minutes, and two missed calls send the doorstep team. Under the generator rule, a generator is proposed for equipment with less than 8 hours of battery when a live fault is expected to last more than 2 hours.

Does it register anyone without their consent? Do people stay in control?

No, and yes. Agents never register, remove, dispatch or change an outage plan. Consent is recorded by a person with its wording version, the team lead approves found customers, the planner signs each notice list and the welfare coordinator dispatches each generator. Every rule change needs a second person.

How does it keep the register in step with networks, water and suppliers?

The register sharer sends medically dependent changes to the network the same day and the rest nightly, compares each partner's records and lists every difference with a suggestion for a person to resolve. Only the needs code, contact details and services leave the register; medical details never do.

How long does it take to go live?

The Agentic Solution Engine builds and deploys it from your requirements and documents — your needs codes, notice and welfare rules, consent wording and a sample of your register, contacts and planned outages — and it goes live once every quality gate has passed. We will walk you through it on your own register first.

See it on
your register.

We'll run Priority Services Register Management on a sample of your own register, contacts and planned outages.