- Before
- Runs 140 contracts. Mornings chasing suppliers' monthly reports, afternoons in variations and disputes. “I know Harrowgate missed their burst times. I just can't prove it inside ten days.”
- Now
- Opens one radar of every dated obligation, runs the check on a supplier's report, and gets the claim drafted with every sentence tied to its clause — she checks, signs and sends.
One supplier's report, from a 97.8% claim to a $380,000 notice
Lumina Utilities runs electricity and water. Harrowgate Civils holds its water network repair and maintenance framework, LUM-C-2291: $3,800,000 a month, Priority 1 bursts and leaks attended within 2 hours in 98% of instances. Harrowgate's September report arrived on Thu 8 Oct. Today is Tue 13 Oct. Here is what happens next, screen by screen, in the working solution.
- 0106:00 sweep
The day opens on a radar of dates, not a list
Nadia Okafor · Senior Contract ManagerNadia runs 140 contracts. Her radar is read from 1,842 contracts and 11,406 obligations, swept at 06:00. Rings are time — Now, 30 days, 90 days, 6 months, 12 months — and seven sectors are the obligation types. Each blip's colour and size are the money at stake: Kestrel Bay delay damages at $240.5K, Brightline's renewal at $372K, Tolland's $1.2M bond. Harrowgate's KPI 2 sits in the 30-day ring as “Watching”: report received Thu 8 Oct — not yet checked.
“Every dated obligation in Lumina’s contracts. The nearest are in the centre; colour and size show the money at stake.”
- 02One click
September, recomputed from Lumina's own job times
SLA performance trackerNadia clicks “Check September against the contract”. The tracker reads Harrowgate's report — 1,214 Priority 1 jobs, 61 excluded by Harrowgate, 97.8% reported — then recomputes from the work-management instruction and arrival times: 1,128 of 1,214 reached site within 2 hours. Each step appears in the side panel as it runs.
Schedule 4, Table 4.1 · KPI 2: “the Contractor shall attend site within 2 hours of the instruction in not less than 98% of instances in each month.”
- 03The exclusions
61 exclusions, each tested against §6.3
SLA performance trackerA job may be excluded only where an access-denied or third-party record, with a photograph, is logged before the attendance deadline. 9 of the 61 pass. 34 access-denied claims had no photo or were logged after the 2-hour deadline, 10 third-party claims had no record on the job, and 8 weather claims had no severe-weather event declared under §6.4. Job WO-26-47731, a burst main on Coldharbour Lane, was instructed at 02:14 and reached at 05:02; access denied was logged at 05:09.
Limit: the tracker never accepts a supplier figure without recomputing, and is read-only on every source system.
- 0493.6%
The breach moves to the centre of the radar
Claim drafterMeasured: 1,128 of 1,205 qualifying jobs, 93.6% — 4 full points below the 98% target that Variation 3 set. Under §5.2 that is 4 × 2.5% × $3,800,000 = $380,000, inside the 15% cap of $570,000. July was 97.2% and August 96.4%, so September is the third month below target and clause 18.2 applies. The blip turns red, grows and moves into the Now ring, which rises to 2 open items and $435.5K.
“Breach found — $380,000 claim drafted · window closes Thu 22 Oct”
- 05The claim
A notice on paper, every sentence tied to its clause
Claim drafterThe claim drafter writes the notice of service credits to Callum Reeve, Harrowgate's Contract Representative, with margin notes beside each paragraph: the 10-business-day window under §7.1, the target from Variation 3, the 52 exclusions rejected, the measurement from work-management jobs WO-26-44102 to WO-26-49318, and the formula and cap — full points only, 4.39 becomes 4. The sum panel shows the working line by line, and Annex A lists the 52 jobs.
Limit: the claim drafter never sends — a person signs — never claims past a cap, and every figure cites its clause.
- 06Approved and sent
Over $250,000, so Owen approves — then Nadia signs and sends
Owen Achebe · Head of CommercialNadia checks the clause, the figures and Annex A, and sends the claim to Owen, because it is over $250,000. Owen approves: “Clause and sums agree. Approved.” Nadia signs and sends it by email and recorded delivery, as clause 22.1 requires, with notice SC-2291-09 and Annex A attached. Accounts payable is told to deduct $380,000 from the October invoice under clause 14.4.
“Signed by Nadia Okafor, approved by Owen Achebe. Sent 9 days before the window closes.”
- 07Same month, every supplier
31 service levels, the supplier's figure beside Lumina's
SLA performance trackerService levels shows every measured KPI for September across 12 contracts. Brightline reported 79.1% of calls answered within 30 seconds; Lumina's call logs say 78.4% against an 80% target — missed by 1.6 points, $41,600 due. Northgate's meter installs right first time came in at 96.8% against 97%: below, but under 1 point, so no credit — full points only.
“Every measured service level, recomputed from Lumina’s own records — job times, call logs and meter data — beside what the supplier reported.”
- 08Behind every obligation
214 pages read, 46 obligations, each with its quote
Contract readerOpen the Harrowgate contract and every obligation is highlighted in the text with its note: the term and extension notice, the $228,000,000 ceiling, the 12-month reinstatement guarantee, the deduction right, the insurance clause, persistent failure and the notices clause. The reader took 3 min 12 s for 214 pages, applied Variation 3 to KPI 2 (97% to 98% from 1 Apr 2026) and linked 4 service levels to Lumina's records.
Sent to counsel: clause 9.6 “reasonable endeavours” has no clock — Hugo Lindgren confirmed: not dated.
- 09Before the notice date
Renew, extend, re-tender or let lapse — decided in time
Samir Haddad · Category ManagerBrightline's call-centre contract auto-renews on 31 Jan 2027 unless written notice is served by Mon 2 Nov, and re-tender quotes are about $372K a year lower. Orbis's fleet leases go month to month at +18% unless the option is exercised by 15 Dec. Altmark's transformer framework cannot be extended, and its 9-month re-tender lead time passed 105 days ago. The watcher drafts the Brightline non-renewal notice; Samir decides.
“Samir Haddad decides. Nothing is served until he records the decision and Nadia signs.”
- 10Ceilings
The blanket agreement that runs out before the rollout ends
Spend and ceiling monitorThe monitor matched 3,412 call-off orders and releases to 5 agreements from purchasing at 06:00. Northgate's smart meter agreement has $16.9M released against an $18M ceiling at $0.9M a month, so it runs out about 19 Nov 2026 — about 5 months before the meter rollout finishes in April 2027. Nadia can request a ceiling variation or hold new releases.
Limit: the monitor never raises or cancels an order.