SystemSupply Chain, Procurement & Finance

Contract Obligation Management

Contract obligation management that claims every penalty owed inside its window and misses no renewal

Every penalty owed claimed inside its window, and no renewal missed.

See one case, screen by screen ↓
demo$380,000service credit found in one month of one service level on one water repair framework — 4 full points below target, under the 15% cap
estimated$3.1Ma yearan estimated value of service credits, damages, warranty claims and overcharges claimed in time — 0.5% of an illustrative $610M third-party spend
target0renewal, option, warranty, insurance or bond dates passing without a recorded decision
demo52of 61supplier exclusions rejected on the contract's own evidence rule, job by job — the supplier's 97.8% measures 93.6% on Lumina's own job times
The problem

Why penalties go unclaimed and renewals roll over

A utility holds thousands of supply, service, EPC and PPA contracts: water network repair frameworks, substation design-and-build, chemical supply, smart meter supply and install, call-centre outsourcing, fleet leases. Between them they carry service levels with service credits, delay damages, price-indexation formulas, warranty and reinstatement guarantees, insurance certificates and bonds, renewal notice windows and spending ceilings on blanket agreements. Those obligations sit in PDFs and in the contract manager's head.

A service credit needs the month's performance measured and a notice served inside a short window — ten business days on Lumina's repair framework. So the supplier's own monthly report is taken at face value, and exclusions such as “access denied” or “third-party damage” are rarely tested against the clause. Index-linked price rises are paid as invoiced, warranty notice periods of 20 to 30 days lapse, auto-renewal dates pass at the old rates, and crews keep working after an insurance certificate expires or a blanket agreement passes its ceiling.

typical≈9%of contract value lost on average to weak contract management — missed entitlements, invoicing errors, avoidable disputes
typical£56,000of service credits actually imposed, out of £585,600 generated, on two outsourced public-sector contracts
Where one supplier's monthly service-credit check goes, in hoursestimated
By hand39 days
With the solution3.6 days
  • Reading the supplier's report and finding the clause, target and variation3 → 0.2 d
  • Pulling job times from work management and recomputing the service level10 → 0.2 d
  • Testing each excluded job against the contract's evidence rule14 → 1 d
  • Computing the credit — full points, formula and cap2 → 0.2 d
  • Drafting the notice and the annex of jobs6 → 1 d
  • Approval and serving the notice the way the contract requires4 → 1 d

Estimated split for checking one supplier's monthly performance report and serving the claim, in working hours, by hand and with the solution. The claim window on the sample contract is 10 business days.

How it works

How an obligation moves

Six specialist agents read every contract, measure every service level from the utility's own records and draft each claim; the contract manager signs.

What comes in
Contracts and performance incontracts, variations, supplier reports · job times, call logs, meter data, purchase orders
Agents at work
Contract readerquotes every obligation
Then
SLA performance trackerown records, not the report
Price and indexation checker
Spend and ceiling monitor
Then
Renewal and notice watcher
Then
Claim drafterformula, cap, notice
A person decides
Contract managerchecks, signs and sends
What comes out
Claim served in time
Renewal decided
Every clause on file
One case, step by step

One supplier's report, from a 97.8% claim to a $380,000 notice

Lumina Utilities runs electricity and water. Harrowgate Civils holds its water network repair and maintenance framework, LUM-C-2291: $3,800,000 a month, Priority 1 bursts and leaks attended within 2 hours in 98% of instances. Harrowgate's September report arrived on Thu 8 Oct. Today is Tue 13 Oct. Here is what happens next, screen by screen, in the working solution.

  1. 0106:00 sweep

    The day opens on a radar of dates, not a list

    Nadia Okafor · Senior Contract Manager

    Nadia runs 140 contracts. Her radar is read from 1,842 contracts and 11,406 obligations, swept at 06:00. Rings are time — Now, 30 days, 90 days, 6 months, 12 months — and seven sectors are the obligation types. Each blip's colour and size are the money at stake: Kestrel Bay delay damages at $240.5K, Brightline's renewal at $372K, Tolland's $1.2M bond. Harrowgate's KPI 2 sits in the 30-day ring as “Watching”: report received Thu 8 Oct — not yet checked.

    “Every dated obligation in Lumina’s contracts. The nearest are in the centre; colour and size show the money at stake.”

  2. 02One click

    September, recomputed from Lumina's own job times

    SLA performance tracker

    Nadia clicks “Check September against the contract”. The tracker reads Harrowgate's report — 1,214 Priority 1 jobs, 61 excluded by Harrowgate, 97.8% reported — then recomputes from the work-management instruction and arrival times: 1,128 of 1,214 reached site within 2 hours. Each step appears in the side panel as it runs.

    Schedule 4, Table 4.1 · KPI 2: “the Contractor shall attend site within 2 hours of the instruction in not less than 98% of instances in each month.”

  3. 03The exclusions

    61 exclusions, each tested against §6.3

    SLA performance tracker

    A job may be excluded only where an access-denied or third-party record, with a photograph, is logged before the attendance deadline. 9 of the 61 pass. 34 access-denied claims had no photo or were logged after the 2-hour deadline, 10 third-party claims had no record on the job, and 8 weather claims had no severe-weather event declared under §6.4. Job WO-26-47731, a burst main on Coldharbour Lane, was instructed at 02:14 and reached at 05:02; access denied was logged at 05:09.

    Limit: the tracker never accepts a supplier figure without recomputing, and is read-only on every source system.

  4. 0493.6%

    The breach moves to the centre of the radar

    Claim drafter

    Measured: 1,128 of 1,205 qualifying jobs, 93.6% — 4 full points below the 98% target that Variation 3 set. Under §5.2 that is 4 × 2.5% × $3,800,000 = $380,000, inside the 15% cap of $570,000. July was 97.2% and August 96.4%, so September is the third month below target and clause 18.2 applies. The blip turns red, grows and moves into the Now ring, which rises to 2 open items and $435.5K.

    “Breach found — $380,000 claim drafted · window closes Thu 22 Oct”

  5. 05The claim

    A notice on paper, every sentence tied to its clause

    Claim drafter

    The claim drafter writes the notice of service credits to Callum Reeve, Harrowgate's Contract Representative, with margin notes beside each paragraph: the 10-business-day window under §7.1, the target from Variation 3, the 52 exclusions rejected, the measurement from work-management jobs WO-26-44102 to WO-26-49318, and the formula and cap — full points only, 4.39 becomes 4. The sum panel shows the working line by line, and Annex A lists the 52 jobs.

    Limit: the claim drafter never sends — a person signs — never claims past a cap, and every figure cites its clause.

  6. 06Approved and sent

    Over $250,000, so Owen approves — then Nadia signs and sends

    Owen Achebe · Head of Commercial

    Nadia checks the clause, the figures and Annex A, and sends the claim to Owen, because it is over $250,000. Owen approves: “Clause and sums agree. Approved.” Nadia signs and sends it by email and recorded delivery, as clause 22.1 requires, with notice SC-2291-09 and Annex A attached. Accounts payable is told to deduct $380,000 from the October invoice under clause 14.4.

    “Signed by Nadia Okafor, approved by Owen Achebe. Sent 9 days before the window closes.”

  7. 07Same month, every supplier

    31 service levels, the supplier's figure beside Lumina's

    SLA performance tracker

    Service levels shows every measured KPI for September across 12 contracts. Brightline reported 79.1% of calls answered within 30 seconds; Lumina's call logs say 78.4% against an 80% target — missed by 1.6 points, $41,600 due. Northgate's meter installs right first time came in at 96.8% against 97%: below, but under 1 point, so no credit — full points only.

    “Every measured service level, recomputed from Lumina’s own records — job times, call logs and meter data — beside what the supplier reported.”

  8. 08Behind every obligation

    214 pages read, 46 obligations, each with its quote

    Contract reader

    Open the Harrowgate contract and every obligation is highlighted in the text with its note: the term and extension notice, the $228,000,000 ceiling, the 12-month reinstatement guarantee, the deduction right, the insurance clause, persistent failure and the notices clause. The reader took 3 min 12 s for 214 pages, applied Variation 3 to KPI 2 (97% to 98% from 1 Apr 2026) and linked 4 service levels to Lumina's records.

    Sent to counsel: clause 9.6 “reasonable endeavours” has no clock — Hugo Lindgren confirmed: not dated.

  9. 09Before the notice date

    Renew, extend, re-tender or let lapse — decided in time

    Samir Haddad · Category Manager

    Brightline's call-centre contract auto-renews on 31 Jan 2027 unless written notice is served by Mon 2 Nov, and re-tender quotes are about $372K a year lower. Orbis's fleet leases go month to month at +18% unless the option is exercised by 15 Dec. Altmark's transformer framework cannot be extended, and its 9-month re-tender lead time passed 105 days ago. The watcher drafts the Brightline non-renewal notice; Samir decides.

    “Samir Haddad decides. Nothing is served until he records the decision and Nadia signs.”

  10. 10Ceilings

    The blanket agreement that runs out before the rollout ends

    Spend and ceiling monitor

    The monitor matched 3,412 call-off orders and releases to 5 agreements from purchasing at 06:00. Northgate's smart meter agreement has $16.9M released against an $18M ceiling at $0.9M a month, so it runs out about 19 Nov 2026 — about 5 months before the meter rollout finishes in April 2027. Nadia can request a ceiling variation or hold new releases.

    Limit: the monitor never raises or cancels an order.

Who it’s for

Built for everyone who holds a supplier to the contract.

The same contracts, seen by the five people who answer for them — what their month looked like, and what it looks like now.

NO
Nadia OkaforSenior Contract Manager, Commercial · checks and sends claims and notices
Contract manager
Before
Runs 140 contracts. Mornings chasing suppliers' monthly reports, afternoons in variations and disputes. “I know Harrowgate missed their burst times. I just can't prove it inside ten days.”
Now
Opens one radar of every dated obligation, runs the check on a supplier's report, and gets the claim drafted with every sentence tied to its clause — she checks, signs and sends.
OA
Owen AchebeHead of Commercial · approves claims over $250,000
Approver
Before
Signs large claims and reports recovered value to the CFO each quarter. “Show me the clause and the sum, and I'll sign it today.”
Now
Gets the clause, the sum, the working and Annex A in one place, approves, and sees the notice go out days before its window closes.
MK
Marta KowalczykNetwork Maintenance Manager, Water · owns the repair framework LUM-C-2291
Contract owner
Before
Owns the repair framework day to day and lives in the work-management system. “Our job times are the truth. Their report is a story.”
Now
Sees the supplier's figure beside the one measured from her own job times, and every rejected exclusion with its job number, times and reason.
SH
Samir HaddadCategory Manager, Field and Customer Services · renewal decisions
Category manager
Before
Decides whether to renew, re-tender or let a contract lapse. “Tell me ninety days out, not nine.”
Now
Sees every contract end on a 12-month timeline with its notice date computed from the contract's own rule, and the notice drafted for his decision.
HL
Hugo LindgrenSenior Commercial Counsel · persistent failure, termination and disputes
Counsel
Before
Reviews persistent-failure, termination and dispute notices. “If the notice isn't served the way the contract says, it isn't served.”
Now
Gets the readings the contract reader could not date, and approves every persistent-failure, termination, step-in and dispute notice before it goes.
Built on the engine

6 agents. Each with one job, and hard limits.

Six specialist agents read every contract, measure every service level from the utility's own records and draft each claim; the contract manager signs.

Contract reader

Reads executed contracts, schedules and variations in date order and records every obligation with its exact quote, clause and page, the trigger, the clock (calendar or business days), the formula and any cap. Applies each variation to the clause it amends and keeps the history.

  • Never records an obligation without the exact quote
  • Disputed or undated readings go to counsel
SLA performance tracker

When a supplier's performance report arrives, recomputes each service level from Lumina's own records — work-management instruction and arrival times, contact-centre logs, meter data — and tests every exclusion the supplier claims against the contract's exclusion clause and its evidence rule.

  • Never accepts a supplier figure without recomputing
  • Read-only on every source system
Claim drafter

Computes service credits, damages and warranty claims with the contract's own formula — full points only where the clause says so — stops at the cap, and drafts the notice citing each clause, with the evidence attached and addressed the way the notices clause requires.

  • Never sends — a person signs
  • Never claims past a cap
  • Every figure cites its clause
Renewal and notice watcher

Computes notice, option and re-tender dates from each contract's own rule — calendar or business days, and how the notice must be sent — and reminds decision owners at 60, 30 and 10 days.

  • Never serves a notice
  • Never lets an auto-renewal pass without a recorded decision
Price and indexation checker

Recomputes index-linked prices against the named index and reference month, and flags price notices and invoices that charge more — Calder Chemicals notified +11.4% for 1 Nov when the index moved +6.2%.

  • Never holds a payment itself — it asks accounts payable
Spend and ceiling monitor

Matches call-off orders and releases to their blanket agreements and frameworks, and forecasts the day each ceiling is reached at the current monthly rate.

  • Never raises or cancels an order
Contract manager

Checks and signs; Head of Commercial approves over $250K. The agents propose; a named person decides.

Ask in plain words

Ask about any contract, in plain words

Ask about any contract, obligation, claim or date — or say what to draft. Every answer points to its clause.

What money can we claim before the end of October?

Five claims are owed and dated before 31 October: Harrowgate's service credit, $380K by Thu 22 Oct; Altmark's transformer warranty, $64.5K by Wed 28 Oct; Harrowgate's failed reinstatements, $55.5K by Tue 27 Oct; Northgate's meter warranty, $49.4K by Sat 31 Oct; and Brightline's service credit, $41.6K by Fri 30 Oct. Harrowgate's $380K is the largest and the window closes Thu 22 Oct.

Why is Harrowgate's figure different from ours?

Harrowgate reported 97.8% by excluding 61 late jobs. The contract allows an exclusion only with a photo logged before the 2-hour deadline; 9 qualify. Counting the other 52, Lumina's job times give 1,128 of 1,205 = 93.6%. That is 4 full points under 98%, so the credit is $380,000.

Which renewals need a decision before November is out?

Two: Brightline auto-renews unless notice is served by Mon 2 Nov — re-tender quotes are about $372K a year lower. Calder Chemicals raises prices on 1 Nov by 11.4% when the index moved 6.2%. Altmark's framework also ends 31 Mar with no re-tender started — the 9-month lead time has passed.

Draft the reply to Varden's extension claim

Drafted for Inés Calloway and Hugo Lindgren. Varden asks for 21 days for late switchgear; the contract keeps delay damages running at $18,500 a day from 30 September — $240,500 so far. The draft accepts 6 days (the switchgear delivery Lumina changed), rejects 15, and asks for the programme within 7 days. It is due by Tue 3 Nov.

Every screen

The working solution, as it ships.

13 screens from the working solution, on its sample data. Pick one to see it large.

The obligation radarEvery dated obligation on one radar: nearest in the centre, seven obligation types as sectors, colour and size for the money at stake, and the supplier reports waiting to be checked.
Checking a supplier's reportThe September check runs step by step: the report read, the service level recomputed from Lumina's job times, the exclusions tested, the credit computed.
A breach in the centreMeasured at 93.6% against 98%, the Harrowgate service level moves into the Now ring with a $380,000 claim drafted and its window closing Thu 22 Oct.
The service credit claimThe notice with a margin note for every paragraph, the sum worked line by line, and the approval chain from drafter to recipient.
Sign and sendRecipient, method required by the notices clause, attachments and the deduction, signed by the contract manager after the Head of Commercial's approval.
Service levelsEvery measured service level for the month: the target, what the supplier says, what Lumina measured, the result and the credit due.
The exclusion testSix months of the supplier's figure against Lumina's, and each claimed exclusion tested against §6.3 with the jobs and the reason it was rejected.
The contract, readThe contract text with each obligation highlighted and noted, how it was read, the variation applied and the obligations it put on the radar.
Add a contract or variationA new variation read on arrival: pages read, new obligations quoted, checked against the contract, and added to the radar.
The obligation registerEvery obligation with its date, type, contract, clause, owner, money at stake and state.
Renewals and noticesContract ends on a 12-month timeline with notice windows, and the decisions still to record — renew, extend, re-tender or let lapse.
Spending ceilingsBlanket agreements and frameworks with released against ceiling, the monthly rate and the day each runs out.
Your rulesApproval limits, reminders, how service levels are measured, the radar's bands and the read-only data sources.
Governance

Built for commercial control: quoted, measured, signed.

Every obligation quotes its clauseEach obligation on the radar and in the register carries its exact quote, clause, page and the variation that set it. Every figure in a claim links to its calculation and the source records behind it.
Agents propose; a person signs and sendsThe contract manager checks and sends every claim and notice. Claims over $250,000 need the Head of Commercial, and over $1,000,000 the CFO signs as well.
Counsel on the notices that matterPersistent-failure, termination, step-in and dispute notices need counsel's approval, and any reading without a clear clock goes to counsel.
Measured, not reportedService levels are measured from Lumina's own records, never the supplier's report alone. An exclusion is rejected only on the contract's own rule, job by job, with the evidence shown.
Read-only on source systemsThe agents never contact a supplier, never serve a notice, never hold a payment and never edit source data. Work management, call logs, meter data, purchasing and invoices are read, not changed.
Every step on the activity trailWho measured, who drafted, who approved, who sent and when is recorded. Every settings change is saved as a new version.
Configuration

Your commercial rules, not ours

Approval limits, reminders, how service levels are measured and how the radar reads are settings, chosen by the commercial team.

SettingDefaultChoose from
Claims that need the Head of CommercialAbove $250,000Set in steps of $50,000 — service credits, damages and warranty claims above this sum
Claims that need the CFOAbove $1,000,000$500,000 · $1,000,000 · $2,000,000 — the CFO signs as well
Notices that need counselOnOn · Off — persistent failure, termination, step-in and dispute notices
Reminder ladder60 · 30 · 10 days60 · 30 · 10 days, 90 · 60 · 30 · 10 days, or 30 · 14 · 7 days before a notice, option or claim date
Escalate to the category manager10 days5, 10 or 14 days before, when no decision is recorded
Re-tender lead time9 months6, 9 or 12 months before a contract ends, if no re-tender has started
Measure from Lumina's own recordsOnOn · Off — work-management job times, contact-centre logs, meter data, never the supplier's report alone
Test every exclusion against the contractOnOn · Off — an exclusion counts only with the evidence its clause requires
Connections

Works with the records your contracts are measured on

Contract repositoryexecuted contracts, schedules and variations — 1,842 contracts and 3,960 variations in the sample
Work managementjob instruction and arrival times, hourly
Contact-centre platformcall answer and abandonment logs, daily
Meter data managementmeter communications and installs, daily
Purchasingpurchase orders, call-off orders and releases against blanket agreements
Accounts payablesupplier invoices, deductions and holds
What it changes

The difference, in numbers.

Every figure is labelled: a target the solution is built to, an estimate, a typical published result, or a proven one.

estimated
$3.1Ma year
in service credits, damages, warranty claims and overcharges claimed in time — 0.5% of $610M third-party spend
Value lost to weak contract management≈9%
Recovered by claiming in time0.5%
target
0
renewal, option, warranty, insurance or bond dates passing without a recorded decision
Decided 20 days out
on a 90-day notice clause
target
Minutes
to put a new contract's obligations on the radar, each with its clause quoted — not days of legal reading

“demo” = seen in the working solution, on its sample data · “target” = the design goal, measured in the live solution · “estimated” = our estimate: 0.5% of an illustrative $610M a year of third-party spend · “typical” = published figures (World Commerce & Contracting, Contract Management: An Overlooked Driver of Business Agility and Financial Performance, 2025 — average value erosion almost 9%; the UK National Audit Office's Yarl's Wood report, as reported by BDC Magazine, 2018 — £56,000 of £585,600 in service credits imposed). Lumina Utilities and the people, suppliers, contracts and records named on this page are fictional — characters and sample data in the working solution.

Questions

What contract and procurement teams ask us.

What is contract obligation management software?

Software that turns every obligation in your contracts — service levels and credits, liquidated damages, price indexation, warranties, insurance and bonds, renewal notices and spending ceilings — into dated, owned items you can act on before they pass. Contract Obligation Management adds six agents that read the contracts, measure suppliers from your own records and draft the claim or notice; the contract manager signs.

How does it measure supplier SLAs instead of trusting the supplier's report?

The SLA performance tracker recomputes each service level from your own records — work-management instruction and arrival times, contact-centre logs, meter data — and tests every excluded job against the contract's exclusion rule. In the sample case, Harrowgate reported 97.8%; with 52 of 61 exclusions failing the contract's photo-and-timing rule, the measured figure was 93.6%.

How does it make sure service credits and damages are claimed in time?

Each claim window is computed from the contract's own clause, in calendar or business days, and the claim drafter writes the notice with the contract's formula and cap as soon as a breach is measured. In the sample case the $380,000 notice went out 9 days before its 10-business-day window closed.

Is it contract management software for utilities' PPAs and EPC contracts too?

Yes. The sample portfolio includes a 120 MW solar power purchase agreement with a price escalator, a 132/33 kV substation design-and-build contract with delay damages of $18,500 a day, a long-term turbine service agreement, supply frameworks, outsourced services and leases.

Does it stop auto-renewals and expired cover slipping through?

The renewal and notice watcher computes every notice, option and re-tender date and reminds owners at 60, 30 and 10 days, escalating to the category manager when no decision is recorded. It never lets an auto-renewal pass without a recorded decision, and insurance certificates, bonds and blanket-agreement ceilings sit on the same radar.

Do people stay in control of claims and notices?

Yes. The agents propose and draft; they never contact a supplier, serve a notice, hold a payment or edit source data. The contract manager checks and sends, claims over $250,000 need the Head of Commercial, and persistent-failure, termination and dispute notices need counsel.

Can we set our own approval limits and reminders?

Yes. The approval thresholds, counsel review, the reminder ladder, escalation days, re-tender lead time, how service levels are measured, the exclusion test and the radar's money bands and centre ring are all settings, and every change is saved as a new version.

How long does it take to go live?

The Agentic Solution Engine builds and deploys it from your requirements and documents — your contracts and variations, a month of supplier performance reports and the records you measure them against — and it goes live once every quality gate has passed. We will walk you through it on your own contracts first.

See it on
your contracts.

We'll run Contract Obligation Management on a sample of your own contracts and a month of supplier reports.