- Before
- Spends the first two weeks of the month pulling exports into a workbook of 312 rate lines, then builds the board pack in slides — ten days making the numbers, ten minutes on what they mean.
- Now
- Starts from a drafted agenda with every breach explained and cited; approves re-codes in bulk, asks the agents what she needs, and records each decision with a reason code.
One month of the reliability program, from data close to a signed decision
Corvane Airways flies 300 aircraft in ten fleets. September's data closed at 23:58 on Tuesday, October 13, and the Reliability Review Board meets on Tuesday, October 20. Here is how the reliability engineer works the month with the agents — what they did on their own, what she asked, what the board decided — screen by screen, in the working solution.
- 01Thursday morning
The month's analysis is already done
Lena Hartmann · Reliability engineer, board secretaryLena opens a home screen with three numbers: 7 items on October's agenda, technical dispatch reliability of 99.12% for September with the A321neo at 98.71% against its 99.05% target, and 1 of last quarter's 2 actions that worked. Under them, four things that need her, in order, and three notes from the agents' overnight run, each with its citation and a next step.
Board secretary agent: “From September's 2,418 pilot reports and 1,312 removals I drafted October's agenda: 4 alert breaches, 2 check-backs, 1 interval change.”
- 02Overnight
Seven agents ran the month while she slept
The agentsAt data close the data agent collected September from five systems: 2,418 PIREPs, 1,176 mechanic reports, 1,312 removals, 391 shop reports, 462 delays and 21 cancellations. It proposed 61 ATA re-codes from the report text, merged 27 duplicate write-ups and filled 3 days of A220 flight hours from aircraft OOOI messages. Then the analysis agent computed 312 lines and 1,148 part numbers, the check agent recomputed every one, the evidence and corrective action agents worked the breaches, and the board secretary agent had the agenda and the FAA report drafted by 05:00. Lena approved the 8 re-codes that touched agenda lines, with a reason code; 53 wait for her.
“People in the loop: re-codes need the reliability engineer; the agenda goes to members only when the secretary sends it; nothing reaches the FAA without the Director of Quality's signature.”
- 03The agenda
“Pack valves on the A321neo are failing more often than they should”
Board secretary agentItem 1 reads as one plain sentence. Pilot reports on the ATA 21-51 pack flow control valve reached 0.84 per 1,000 flight hours, against an alert level of 0.62 — the 2025 mean of 0.38 plus two standard deviations. It is the second month above the alert level and the first above the 0.74 upper limit. A 21-month chart shows the rate against the mean, alert and upper lines, and the agents' notes sit beside it.
Evidence agent: “Lot FC-24 explains the alert: 26 of 30 reports and 8 of 11 removals; 6 of 7 teardowns found the same shaft-bearing wear.”
- 04One click
Every line of evidence opens its source
Evidence agentUnder the chart the evidence is folded: 30 pilot reports, 11 unscheduled removals with a valve MTBUR (mean time between unscheduled removals) of 7,870 FH against a 9,000 FH floor, 7 shop findings and 16 delays and deferrals — 9 delays of 486 minutes, a cancellation and 6 one-pack deferrals. Lena opens teardown report TR-26-0909 for valve FC24-0603, removed from N441CV: butterfly shaft bearing wear, early stage, with intermittent binding below −20 °C.
The evidence agent never states a cause without a quoted source.
- 05She asks
She asks: “Why 9 tails and not all 44?”
Lena Hartmann · Reliability engineer, board secretaryThe corrective action agent drafted three options: replace the FC-24 valve on the 9 tails that still carry one, under warranty and vendor bulletin 3291478-21-012; replace on failure only; or replace all 88 valves. Lena asks the agents why 9. The evidence agent answers that lot FC-24 filled 17 valve positions on 14 tails, 8 have already been removed, and the other 79 valves run at 0.09 per 1,000 FH, below the 2025 mean.
“Answers cite their source; nothing is approved or sent until a person says so.”
- 06The full analysis
The pattern behind the alert, by serial lot
Victor Osei · Manager, Fleet EngineeringVictor wants serial numbers, not an alert. The full analysis shows how the rate was computed — 12 reports on 14,286 flight hours — and the check agent's own recompute of 0.840. By serial lot, 26 of the 30 reports fall on FC-24, which filled only 17 of the 88 positions. The 9 tails in the proposal are listed, with the three that had two September reports each marked.
- 07Before the board sees it
An alert that is really one aircraft
Check agentThe check agent recomputed all 312 lines from the raw tech log without seeing the first answer, and agreed on 311. On the last it challenged the draft: the 737-800 nose-wheel steering rate of 0.54 against an alert level of 0.45 comes from 5 of 9 reports on one tail, N517CV, “shimmy on taxi”. Without that tail the fleet is at 0.24. Version 1 of the agenda went to members with the challenge open; on Thursday morning Grace Liang confirmed N517CV is a repeat defect, and the corrective action agent replaced the fleet inspection with a tail-level action, keeping the first draft as option B.
The check agent never edits a draft itself; a person confirms its challenge before the proposal changes.
- 0890 days on
One fix worked. One did not.
Check-back agentEvery action carries a success test written when the board approved it. The 777-300ER bleed valve fix met its test: 0.38 in August and 0.32 in September, below the 0.58 alert level. The A320 forward cargo door fix did not: 0.47 against 0.30. The seals were serviceable; the sensor bracket was loose on 8 of 11 doors. The agent escalated it to Marcus Bell, the Director of Quality, and drafted a second-level action.
The check-back agent never closes an action; a failed one goes to the Director of Quality.
- 09Tuesday, October 20
The board approves with a change; Lena records and signs
Lena Hartmann · Reliability engineer, board secretaryMembers pre-voted. Victor: “Agree with A. Arden confirmed exchange stock for 9 units.” Grace Liang, Director of Line Maintenance, asked for the three tails with two September reports first. In the meeting, with the chair and 4 voting members present for a quorum, Lena records the decision: approved with a change — N431CV, N433CV and N438CV within 14 days, the other 6 within 60 — a 90-day check-back at the January 19, 2027 board, owner Victor Osei, reason code D2, and her e-signature.
The board secretary agent never records a decision a person did not make.
- 10At the close
Minutes, actions and the FAA report, from the same record
Board secretary agent and Marcus BellSeven decisions in one meeting. The board secretary agent writes the minutes — attendance, quorum, each decision with its reason code and action — and creates CA-2610-01 for Victor Osei, due December 14, 2026, with the 9 tails and proposed DEN overnights in Elena Kowalski's planning queue; N431CV, N433CV and N438CV are marked within 14 days. The monthly reliability report for the FAA principal maintenance inspector moves to version 3 with the board's decisions, for Marcus Bell to sign.
Nothing reaches the FAA without the Director of Quality's signature.