- Before
- Runs seven validations against go-live dates. “I spend weeks on scripts and minutes on the risk call that decides them.”
- Now
- Opens a grid already placed, with the reason and source for every function; spends his time on the calls that need him, such as where the SOP is stricter.
One LIMS module, from six sources to a signed validation
Northwind Bio is adding the stability module of Kelvora LIMS 10 at Plant 3 — Leiden, where its results support shelf-life assignment for Veltrimab 150 mg/mL solution for injection. Go-live is Nov 16, 40 days out. Here is what happens next, screen by screen, in the working solution.
- 01Morning, Oct 7
Six sources in, and an empty risk grid
Omar Haddad · Validation leadValidation VP-2614 opens with its sources attached: URS v1.3 (38 pages), configuration spec v0.9 (61 pages), the intended use v1.0 signed by Dr. Maya Chen, Kelvora's validation package 10.0 (312 pages), the SOC 2 Type II report and Northwind Bio's QA-SOP-0412 v7. The grid already says how each cell is proven: robust scripts at 6 h where impact and likelihood are both high, supplier evidence at 1.5 h, a recorded rationale at 0.5 h.
“6 sources in · 42 requirements · 15 functions to place. The agents group the requirements into functions and place each one by impact and likelihood. You decide every placement.”
- 02One click
“Place functions” — six agents, 214 pages
The agentsThe Requirements Reader splits the sources into 42 requirements with page anchors. The Intended-Use & GxP Assessor records direct use in the quality system, GAMP category 4, SaaS. The Function Risk Classifier places 15 functions, and the Vendor Evidence Matcher finds that the supplier package and the SOC 2 report (period ended Jun 30, 2026) cover 2 functions and 5 requirements. The functions land on the grid cell by cell.
“Each function lands in the cell its impact and likelihood point to. The cell sets the method and the hours; nothing is final until you sign.”
- 03Seconds later
Six functions in the high-risk corner — and one decision
Function Risk ClassifierStability protocol set-up, pull-point schedule calculation, result entry against specification, OOS and OOT flagging, the audit trail on result changes and the CDS result import land where both impact and likelihood are high: 36 h of robust scripts. Backup, restore and retention, and hosting and installation, rest on supplier evidence. The lab news board needs only a rationale. In all, 55.5 h against 118 h if every requirement were scripted. One function is flagged: F-09 user access and roles sits in an unscripted cell, at 73% agent confidence.
“Our SOP is stricter than the grid here.” The cell says unscripted, but the procedure asks for a script whenever a function controls who can approve GMP results.
- 04His call
He follows the SOP: a limited script for user access
Omar Haddad · Validation leadTwo options are on screen. Follow QA-SOP-0412 §6.2 with a limited script — three steps proving only Reviewers can approve results, +0.5 h — or keep it unscripted and send an SOP deviation request to IT Quality. Omar takes the recommended option. TS-2614-09 is drafted, F-09 moves to scripted, limited, and the total becomes 56 h.
“Decided by you: F-09 follows QA-SOP-0412 §6.2 — limited script TS-2614-09 added.”
- 05The plan
A validation plan drafted from the grid, every section cited
Test Strategist & Script WriterThe plan's eight sections — purpose and scope, system and intended use, risk determination, assurance approach, supplier evidence, records, roles, acceptance — each cite the passage they rest on. The supplier evidence section records 1,146 supplier tests with 0 open deviations and a SOC 2 report with no exceptions, and says plainly that customer configuration is tested by Northwind Bio. Any section can be redrafted; the plan exports to Word.
Results are recorded as digital evidence — test logs, system audit trails and exported reports — without screenshots unless a step needs one.
- 06Robust script
TS-2614-02 proves the pull windows step by step
Test Strategist & Script WriterPull-point schedule calculation is scripted because a miscalculated pull window means samples tested out of window, and the stability data behind the shelf life is lost. Five steps on template TPL-TS-03: the 3-month pull due Jan 1, 2027 with its ±7-day window, the 18-month pull due Apr 1, 2028 with ±14 days, a start-date change blocked without a reason, and the audit trail recording old value, new value and reason when one is given.
Every step names the requirement it proves. No step is written without one.
- 07Unscripted charter
A mission and a time box, not 40 screenshots
Priya Raman · CSA engineerSample login and labels is medium impact, medium likelihood: a wrong label is caught by the scan-to-confirm step at the chamber. So it gets charter UC-2614-01 on template TPL-UC-01 — explore logging and labelling a full 6-month pull for two conditions, trying wrong-sample scans and reprints — 45 minutes, tester Priya Raman, recorded as notes, issues and a conclusion.
- 08Trace matrix
42 of 42 requirements reach proof
Trace & Consistency CheckerEvery requirement traces to a script, a charter, supplier evidence or a recorded rationale, with its grid cell and proof id. The first draft had one gap: URS-031, keep records and their audit trail for 10 years. The checker closed it with the supplier's SOC 2 retention control C1.1 and evidence review VE-2614-01, in which the reviewer confirms that 10-year retention is configured. The matrix filters by method and exports to Excel.
An untraced requirement blocks signing.
- 09Sign as author
He signs with the meaning of his signature
Omar Haddad · Validation leadThe signature covers the validation plan and test strategy, the risk assessment of 15 functions, the trace matrix of 42 requirements, 9 scripts and 3 charters. Omar chooses the meaning — “I am the author of this validation plan, risk assessment and trace matrix” — and enters his password.
“Your name, the date and time, and the meaning are recorded with the signature and shown on every exported page.”
- 10Signed · 09:29
To the system owner and IT Quality
Dr. Maya Chen and Dana OkaforAll five checks before signing are green: every function placed with its cited passage, 42 of 42 traced, the SOP conflict decided, supplier evidence current, the intended use signed by the system owner. VP-2614 moves to QA approval. Dr. Maya Chen is next to sign, as reviewer — “I confirm the intended use and every grid placement” — then Dana Okafor, who approves it for testing. People and agents are on the same audit trail.
“Signed — VP-2614 moved to QA approval; Dr. Maya Chen and Dana Okafor notified.”