WorkflowAsset Management & Maintenance

Condition Assessment Report Review

Condition assessment report review that puts every finding you paid for into the asset health index, each grade checked against the last survey

Every finding you paid for reaches the health index, each grade checked against the last.

See one case, screen by screen ↓
target100%of report findings in the asset health index, each tied to its page
demo7readingspast their limit flagged in one survey — a breaker tripping at 71 ms against ≤ 60 ms, transformer oil at 38 kV against ≥ 40 kV
demo6gradesquestioned against the 2021 survey and 214 work orders before any of them reached the EAM
demo142findingsand 38 readings taken from one 148-page consultant report, every one with its page and sentence
The problem

Why condition reports you paid for never reach the health index

Consultants, manufacturers and test crews hand a utility its condition evidence as long PDFs: a 148-page five-yearly survey of a water treatment works, 22 breaker timing and contact resistance certificates from a primary substation, a trunk-main wall thickness survey, a quarterly oil laboratory batch. Somebody has to type the grades and readings into the EAM. Often it happens weeks later, and much of it never happens at all, so the asset health index runs on the previous survey or on nothing.

Nobody re-reads the last report either. Grades are compared from memory, if at all, so a roof that goes from poor to good with no repair on record, or a breaker graded good that trips late on its own certificate, goes straight into the index. A replaced pump keeps its old nameplate in the register, and new plant is never handed over. Capital then goes to the wrong assets, and defects past their limits wait for the next outage.

demo148pagesin one five-yearly works survey, with 9 test certificates in its appendix
demo214work orderssince the last survey that each grade has to be checked against
typical6 + 6defectsgrade-1 and grade-5 pipe defects (NASSCO grading, 5 = worst) that can average to a Pipe Rating Index of 3, hiding the severe ones
Where the hours on one five-yearly survey goestimated
By hand50 days
With the solution5.5 days
  • Reading the report, its tables, photographs and appended certificates16 → 1 d
  • Matching each asset to the register by tag, nameplate and serial4 → 0.5 d
  • Re-keying grades and readings into the EAM12 → 0.5 d
  • Checking readings against standards and manufacturers' limits4 → 0.5 d
  • Comparing grades with the last survey and the work history8 → 2 d
  • Writing defects, consultant questions and the capital planning summary6 → 1 d

Estimated split, in working hours, for one 148-page site survey with about 140 findings, by hand and with the solution. With the solution, the hours left are the engineer's decisions on flagged findings and the steward's release.

How it works

How a report moves

Six specialist agents read, match, check and question every finding; the asset engineer decides and a data steward releases.

What comes in
Condition report in148 pages · survey, test certificates, photos, last report
Agents at work
Report readerpages, tables, photos
Then
Asset matcher
Findings extractor
Then
Limits checker
History checkerlast survey + work orders
Then
Update writerEAM file + summary
A person decides
Asset engineerdecides what is questioned
What comes out
EAM update
Defects raised
Summary for capital planning
One case, step by step

One five-yearly survey, from 148 pages to the EAM

Lumina Utilities runs Kestrel Bay Water Treatment Works. Arden Hale Consulting has finished its five-yearly condition assessment, KBW-CA-2026 Rev 0: 148 pages, surveyed 1–18 September 2026, issued 2 October, received 12 October. Here is what happens next, screen by screen, in the working solution.

  1. 01Tue 13 Oct

    The report opens beside its findings table

    Hannah Okafor · Asset engineer

    Hannah owns the treatment works in the south region and reads every consultant report for them. The review screen shows the report itself on the left, page by page, and the 63 assets in scope on the right, each with its 2021 grade from KBW-CA-2021. The 2026 column still reads “not read”.

    “Not read yet. Six agents will read all 148 pages, match every asset to the register, check each reading against its limit and compare every grade with the 2021 survey and the work history. You decide on anything they question.”

  2. 02One click

    Six agents read the survey, step by step

    Six agents

    She clicks Read the report. The report reader takes in 5 sections, 31 tables, 108 photographs and 9 test certificates in Appendix C. The asset matcher finds 63 of 64 assets in the register. The findings extractor pulls 142 findings and 38 readings, the limits checker tests the readings against 10 limits, and the history checker compares every grade with 2021.

    Asset matcher: “Matched 63 of 64 assets to the register · MCC4 is not in the register · P-03 serial differs.”

  3. 034 min 12 s later

    Twelve findings need her; the rest are ready

    Hannah Okafor · Asset engineer

    The screen opens on Needs you: 12 of 142 findings. Raw water pump P-03 shows Serial differs, MCC4 Not in register, and seven rows are Out of limit, including CB-03 contact resistance at 142 µΩ, transformer T1 oil at 38 kV and acetylene at 4 ppm, raw water pump P-02 at a polarisation index of 1.4 and the DN600 rising main wall at 6.1 mm.

    “Read by six agents in 4 min 12 s · 142 findings and 38 readings from 148 pages · 7 out of limit · 6 grades questioned against the 2021 survey · 12 need you”

  4. 04Any row

    Every reading, tied to its sentence and its limit

    Findings extractor and Limits checker

    Clicking transformer T1's insulating oil row scrolls the report to section 4.10 on page 32 and highlights the sentence: breakdown voltage 38 kV, certificate LAB-26-0912. The row shows the reading against the IEC 60422 limit of ≥ 40 kV for equipment below 72.5 kV, and the recommended action.

    Limits checker: “Filter and dry the oil; resample after treatment.”

  5. 05The question

    The roof rose from 2 to 4 with no repair on record

    History checker

    Arden Hale graded the filter building roof covering 4, good. In 2021 Pellow & Marsh Engineers graded it 2, with blistering, splits and water getting into the filter gallery. The work history shows only gutter clearing in March 2023 and a temporary patch in January 2024; roof replacement CP-2023-118 is deferred, not started. Photograph 5.4 shows a single-ply membrane, but the filter building has built-up felt.

    History checker: “The chemical building roof was relaid in single-ply in June 2024 (work order 4502216). The surveyor may have graded the wrong roof.”

  6. 06Decided

    Hannah keeps grade 2 and asks Arden Hale

    Hannah Okafor · Asset engineer

    Three sources sit side by side — this report's sentence on page 52, the 2021 sentence on page 28, and the work orders — and the asset history draws the grade over 2016, 2021 and 2026 with the questioned rise dashed. Hannah chooses Keep grade 2 and ask Arden Hale. Accepting grade 4 would have needed a written reason, shown to the condition assessment lead with the summary.

    “Kept grade 2 · question sent to Arden Hale · 11 still need you” — answer due in 10 working days under framework FW-0417.

  7. 07Since 2021

    Every grade that moved, and why

    History checker

    Changes since 2021 sets the two surveys against each other for the 63 assets in both: 49 held their grade, 9 got worse, 5 improved. Six grades are questioned, among them backwash pump P-07, which rose 2 → 4 while its vibration stayed the same (6.9 mm/s in 2021, 6.8 now), and CB-07, graded 4 while its trip time is 71 ms. Seven element grades that improved are explained by completed work, such as the CB-05 mechanism overhaul in July 2022.

    “Improved, with the work that explains it · 7 — accepted by the History checker”

  8. 08Seven defects

    Every reading past its limit becomes a defect

    Hannah Okafor · Asset engineer

    Readings shows the 38 readings against their limits, each with its standard, source page and recommended action: replace the L2 vacuum interrupter on CB-03 at the next outage; restrict CB-07 to manual switching until it trips within 60 ms; rewind or replace the P-02 motor and run P-01, P-03 and P-04 as duty. Hannah clicks Raise defects for all 7, and DN-8841208 to DN-8841319 are drafted for the maintenance planner.

    “7 defects drafted for the maintenance planner · 4 findings still need you”

  9. 09Released

    Wen releases the update; the health index recalculates tonight

    Wen Li · Asset data steward

    The EAM update file holds a condition update or reading for every finding, each with its source page. Hannah sends 138 ready updates to Wen Li; 4 stay held until they are decided. Wen releases them, and the register correction for P-03 (serial KX-22-80417, Kestner KS-450, installed 2024) and the new asset record for MCC4 are waiting for her.

    “Wen Li released 138 updates · Kestrel Bay WTW health index recalculates tonight”

  10. 10For capital planning

    A one-page summary, signed twice

    Graham Pell · Condition assessment lead

    The update writer drafts the summary from the findings and Hannah's decisions, every line linked to its page. It tells capital planning to keep filter building roof replacement CP-2023-118 in the 2027 plan, and says the DN600 rising main at 6.1 mm against 7.0 mm supports bringing its renewal forward. Hannah signs and sends it to Graham Pell, who signs and sends it to Imogen Shaw.

    In one line: “The filter building roof is not improved: it stays at grade 2 until the consultant explains a grade the work history does not support.”

Who it’s for

Built for everyone who owns a condition report.

The same survey, seen by the five people who touch it — what it looked like by hand, and what it looks like now.

HO
Hannah OkaforAsset engineer, treatment works, south region · accepts and questions findings
Asset engineer
Before
Owns 11 works and reads every consultant report for them, then types the grades into the EAM by hand. “I paid for 148 pages and I get to read them properly once.”
Now
Opens the report beside its findings, every row tied to its sentence, and decides only the findings the agents question — with the 2021 sentence and the work orders beside each one.
GP
Graham PellCondition assessment lead · runs the five-yearly survey programme and signs summaries
Condition assessment lead
Before
Runs the survey programme and the framework contract, and has no quick way to see which grades moved without cause. “If a grade goes up, show me the work that put it up.”
Now
Sees every grade that moved since 2021 with the work order that explains it, and signs a summary in which any accepted questioned grade carries its written reason.
WL
Wen LiAsset data steward · keeps the register and releases every change into the EAM
Asset data steward
Before
Keeps the register while replaced pumps keep old nameplates and new plant is never handed over. “Nothing goes into the EAM that I can't trace to a page.”
Now
Releases an update file in which every row carries its source page, held rows stay out, and register corrections and new asset records come to her with the evidence.
IS
Imogen ShawCapital planning manager · ranks the 2027–2031 renewals
Capital planning manager
Before
Ranks renewals on whatever grades reached the index. “One wrong ‘good’ and the roof slips another year.”
Now
Reads a signed one-page summary: what to act on now, what moves in the capital plan and why, and which grades are still open with the consultant.
RC
Rhys CastellaneConsultant, Arden Hale Consulting · wrote the Kestrel Bay report, answers questions under the framework
Consultant (guest)
Before
Hears about a disputed grade months later, if at all. “Send me the page and I'll recheck it.”
Now
Gets each question with the page, the 2021 grade and the work history behind it, and answers on his own reports only, inside the 10 working days the framework allows.
Built on the engine

6 agents. Each with one job, and hard limits.

Six specialist agents read, match, check and question every finding; the asset engineer decides and a data steward releases.

Report reader

Reads consultant, manufacturer and test reports of any layout — sections, tables, photographs and appended certificates — and keeps the page, paragraph and sentence for every statement and the caption for every photograph.

  • Never rewrites or summarises a consultant's finding — keeps their words
  • Cites page and sentence for every value
Asset matcher

Matches every asset the report names to the asset register by tag first, then nameplate, serial and location, and reports assets the register does not hold and nameplates that differ from it.

  • Never creates or edits an asset record — corrections go to the data steward
  • A mismatch always holds its findings
Findings extractor

Turns each statement into a finding — element, grade, defect, reading with its unit and certificate, and recommendation — converting another grading scale to Lumina's and showing the conversion.

  • A grade is only what the report says
  • No reading without its unit and source
  • Below the confidence threshold, a finding goes to the engineer first
Limits checker

Checks every reading against the limit in Lumina's engineering standards or the manufacturer's data — breaker timing and contact resistance, IEEE 43 insulation, IEC 60422 and ES-214 oil, ISO 10816-3 vibration, WS-118 wall thickness — and proposes a defect for the planner.

  • Limits come from Settings, never from the report
  • Never closes or raises a defect itself
History checker

Compares every grade with the last two surveys and the work orders since, questions grades the evidence does not support, and checks photographs against the asset's material and type. Each night it rechecks questioned grades when work orders close.

  • Never changes a grade
  • Every question shows its three sources
Update writer

Writes one condition update per finding with its source page, drafts a defect notification for each out-of-limit reading and a question to the consultant for each grade kept, and writes the one-page summary for capital planning.

  • Never writes to the EAM — a data steward releases the file
  • Held findings never enter the file
Asset engineer

Decides flagged findings; data steward releases to the EAM. The agents propose; a named person decides.

Ask in plain words

Ask about any asset, reading or grade, in plain words

Ask about any asset, reading or grade in the report, or say what to question. Every answer points to its page.

Why is the filter building roof questioned?

Arden Hale graded the roof covering 4, good. In 2021 Pellow & Marsh graded it 2, with blistering, splits and water getting into the filter gallery, and recommended replacement within two years. Since then the work history shows only gutter clearing in March 2023 and a temporary patch in January 2024; CP-2023-118 is deferred and not started. Photograph 5.4 shows a single-ply membrane, which is the chemical building roof relaid in 2024. I suggest keeping grade 2 and asking Arden Hale to recheck.

Which readings at Kestrel Bay are out of limit?

Seven of the 38: CB-03 contact resistance, CB-07 trip time, transformer T1 oil breakdown voltage and acetylene, clarifier 2 carbonation, the P-02 motor's polarisation index and the DN600 rising main wall. CB-07 is the one to watch: the consultant graded it good, but it trips in 71 ms against 60 ms, and it feeds the ozone plant.

Draft the questions to Arden Hale

Three questions under framework FW-0417, answer due in 10 working days: which roof photograph 5.4 shows, and the basis for grade 4; what supports grade 4 for backwash pump P-07 when vibration is 6.8 mm/s, as in 2021 (6.9); and what defect gives the sludge thickener bridge grade 2. The 2021 grades stay on all three until they answer.

What changes in the capital plan if we accept this report?

Two things move. The DN600 rising main, with 6.1 mm of wall against 7.0 mm at the river crossing, supports bringing its renewal forward. Taking the roof's grade of 4 as written would let CP-2023-118 slip again; the evidence says it should stay in 2027. P-02's motor, T1's oil and clarifier 2 are maintenance, not capital.

Every screen

The working solution, as it ships.

13 screens from the working solution, on its sample data. Pick one to see it large.

The review screenThe consultant's report beside its findings table, with the 12 findings that need the engineer — serials that differ, an asset not in the register and readings out of limit.
A report arrivesThe 148-page survey on the left, the 63 assets in scope on the right with their 2021 grades, the 2026 column not yet read.
Agents at workSix agents read, match, extract, check limits and compare with 2021, step by step, while the findings table fills in.
Every reading tied to its sentenceTransformer T1's oil at 38 kV against ≥ 40 kV, the sentence highlighted on page 32 and the recommended action.
A questioned gradeThe filter building roof's rise from 2 to 4, with this report, the 2021 report and the work history side by side, and the decision buttons.
Asset historyThe roof's grade over three surveys with the work orders on the timeline, what each report said, and the register record.
Changes since 2021Grade movement for the 63 assets in both surveys, the six questioned grades, and the improvements explained by work done.
Readings against their limitsThe seven readings past their limit, each with its standard, source page and recommended action.
Defects raisedA defect notification drafted for each out-of-limit reading, numbered for the maintenance planner.
The EAM updateEvery condition update with its source page, released by the data steward, with the held rows, register correction and new asset record alongside.
The report summaryOne page for capital planning — act now, the capital plan, questions with the consultant and the register — with sign-off.
Condition reportsEvery report, certificate and survey from received to in the EAM, with what is out of limit and questioned in each.
Your rulesThe grading scale, how an asset's grade is made, the confidence threshold and the rules for questioning a grade.
Governance

Built for asset data you can defend: cited, decided, released.

Every value keeps its page and sentenceEach grade and reading in the findings table, the EAM update file and the summary links to the report page and sentence it came from. Clicking a row scrolls the report to that sentence.
The asset engineer decides every flagged findingAgents extract, check and question. The asset engineer for the site accepts, holds or questions each flagged finding, and accepting a questioned grade needs a written reason, shown to the condition assessment lead with the summary.
Nothing reaches the EAM before a steward releases itThe update writer stages the file but never writes to the EAM. Only a data steward releases it, held findings never enter it, and asset records are created or corrected only by a data steward.
Every question shows its three sourcesA grade that improved with no work recorded, fell sharply with no defect described or does not match its reading is held, with this report's sentence, the last report's sentence and the work orders side by side.
Limits from your standards, never from the reportReadings are checked against Lumina's engineering standards and the manufacturers' data held in Settings. Changes to rules and limits are versioned and on the audit trail.
Consultants see only their own reportsConsultants and test contractors join as guests. A consultant uploads reports and answers questions on their own reports only; a test contractor uploads certificates. Every decision, release and signature is on the activity trail with its time.
Configuration

Your grading scale, limits and approvers, not ours

How grades are read, when one is questioned and who releases and signs are settings, chosen by the asset management team.

SettingDefaultChoose from
Grading scaleLumina 1–5 (5 = very good)Lumina 1–5 (5 = very good) · Lumina 1–5 (1 = very good) · A–E — reports on another scale are converted, and the conversion is shown on each finding
Asset gradeWorst elementWorst element · Weighted by element · Consultant's overall grade
Extraction confidence to accept without review90%Set up or down; below it a finding is shown to the engineer before it is loaded
Grade fell sharply with no defect described2 gradesSet the fall, in grades, that is questioned when the text describes no defect
Other questioning rulesAll onGrade improved with no work recorded · Grade does not match the reading · Nameplate or serial differs from the register · Photograph does not match the asset — each On or Off
Releasing the EAM updateWen LiWen Li · Marcus Adeyemi — nothing is written to the EAM before a data steward releases it
Report summary signed byGraham PellGraham Pell · Sunita Rao — signed before it goes to capital planning
Questions to the consultant10 working days5 · 10 · 15 working days, under the framework contract
Connections

Works with the reports and records your asset team already has

Contractor and OEM condition reportsfive-yearly site surveys, structural and pipe condition surveys, manufacturers' reports, in any layout
Test certificates and lab resultsbreaker timing and contact resistance, insulation, partial discharge, transformer oil analysis
Asset registertags, nameplates, serials, locations and criticality
Work order historycompleted and deferred work and capital projects since the last survey
Previous surveysthe last two reports for the same assets, quoted with their pages
Your EAMan update file of condition values and measurement readings, released by a data steward
What it changes

The difference, in numbers.

Every figure is labelled: a target the solution is built to, an estimate, a typical published result, or a proven one.

target
100%
of report findings in the asset health index, each tied to its page
142 of 142 findings
from one 148-page report
target
Sameday
out-of-limit readings in front of an engineer, not at the next outage
By handweeks, or never
With agentssame day
target
Every
grade change checked against the last survey and the work history before it is loaded

“demo” = seen in the working solution, on its sample data · “target” = the design goal, measured in the live solution · “estimated” = our estimate, for the split of hours only · “typical” = published figures (NASSCO PACP condition grading: an averaged Pipe Rating Index of 3 can hide six grade-5 defects behind six grade-1 defects). Context: CIGRE TB 761 via IEEE Access 2021 (incomplete records drive health-index uncertainty); Ontario Energy Board distribution system plan filings (asset condition assessments). Lumina Utilities, Kestrel Bay Water Treatment Works, the consultants, assets, records and the people named on this page are fictional — characters and sample data in the working solution.

Questions

What asset management teams ask us.

What is condition assessment report review software?

Software that reads the condition assessment reports and test certificates consultants, manufacturers and test crews deliver, and turns them into structured findings and readings for the EAM and the asset health index. Condition Assessment Report Review uses six agents to read, match, extract, check limits and compare with the last survey; the asset engineer decides what they question and a data steward releases the update.

How does condition assessment report data extraction work?

The report reader takes in the whole report, including scanned tables, photographs and appended certificates. The asset matcher finds each asset in the register by tag, nameplate, serial and location, and the findings extractor records the element, grade, defect, reading with its unit and certificate, and recommendation — each tied to its page and sentence.

How does it check a grade against the last survey?

The history checker compares every grade with the last two surveys and the work orders since. It questions a grade that improved with no work recorded, fell sharply with no defect described, does not match its reading, sits on an asset whose serial differs from the register, or comes with a photograph that does not match the asset.

Which limits does it check readings against?

Your own engineering standards and the manufacturers' data, held in Settings — for example breaker trip time ≤ 60 ms, contact resistance ≤ 100 µΩ, polarisation index ≥ 2.0, oil breakdown voltage ≥ 40 kV, acetylene ≤ 2 ppm and vibration ≤ 7.1 mm/s. Limits never come from the report itself.

Does it write to our EAM directly?

No. The update writer stages an update file with a source page on every row. Nothing is written to the EAM until a data steward releases it, held findings never enter the file, and asset records are created or corrected only by a data steward.

Do asset engineers stay in control of the grades?

Yes. Agents never change a grade. The asset engineer accepts, holds or questions each flagged finding, and accepting a questioned grade needs a written reason that is kept on the audit trail and shown to the condition assessment lead with the summary.

Does it work for water and electricity assets?

Yes. The sample works covers switchgear, transformers, motor control centres, pumps, pipework, civil structures and instrumentation, and the report list includes breaker certificates, a cable partial discharge survey, a trunk-main wall survey, oil laboratory results and a wood pole inspection.

How long does it take to go live?

The Agentic Solution Engine builds and deploys it from your requirements and documents — your grading scale, engineering standards, register and a sample of past condition reports — and it goes live once every quality gate has passed. We will walk you through it on one of your own surveys first.