SystemFinance, Procurement & Facilities

Facility Condition Assessment

Facility condition assessment software that keeps every building's condition current from work orders, and ranks the capital plan with its proof

Capital dollars go to the riskiest systems first, and every rank shows its proof.

See one case, screen by screen ↓
demo14work orderscorrective calls on one rooftop unit in 12 months, against a drift threshold of 6, in the sample plan
demo19 → 4rankwhere the $1.86M Technology Center HVAC renewal moved once its condition was current
target7daysfrom a failing asset's work orders to an updated condition and rank, not the next consultant cycle
typical$156per sq ftdeferred capital renewal on US campuses in 2025, up 8% in a year
In short

What is Facility Condition Assessment?

Facility Condition Assessment is facility condition assessment software for colleges and school districts: facilities teams turn condition data and work orders into a ranked, bond-ready capital plan. Seven agents read the assessments and work orders, keep each building's condition current, cost and rank the projects, argue against every rank change and draft the board list. The Director of Facilities approves every change and the vice president releases the plan.

AI in education: a buyer's guide to agentic AI for colleges, universities and school districts →

Updated

The problem

Why facility condition assessment software still leaves the capital plan stale

Facility condition assessment software usually starts from the same place: every three to five years a consultant walks every building and leaves a 300–700 page PDF and a spreadsheet, and the capital plan is built from them. The day they arrive they start to go stale. A rooftop unit called "fair, 6 years left" in 2022 can fail every month in 2026, and the plan does not know, because the best evidence of decline sits in the work order system, where nobody reads it against the plan.

Ranks then change in a spreadsheet or a meeting, and the Board of Trustees and the bond oversight committee get a list without the evidence or the trade-off — which project dropped below the funding line to make room. Facility Condition Assessment puts seven agents on that work: they keep each building's condition and facility condition index current, rank the projects on the board's own criteria, argue against every rank change, and draft the board list, while the Director of Facilities approves and the vice president releases.

demo$41,700of repairson one rooftop unit in 12 months while its renewal sat at rank 19, in the sample plan
demo23class sessionscanceled for 186 welding students while the shop was closed 9 days without makeup air, in the sample plan
typical73.5%of what US campuses needed to spend on existing buildings in 2025 to keep the backlog from growing
Where the days go between a failing asset and a board-ready rankestimated
By hand70 days
With the solution7 days
  • Spotting repeat failures in the work order system30 → 1 d
  • Confirming the cause with the maintenance supervisor5 → 1 d
  • Re-estimating the project with escalation and soft costs10 → 1 d
  • Re-scoring and re-ranking on the board's criteria10 → 1 d
  • Weighing the trade-off and the Director's approval10 → 2 d
  • Rewriting the board list line with its reason5 → 1 d

Estimated split, in calendar days, of one rank change made by hand and with the agents, assuming the failing asset is noticed at all between consultant cycles. The 'after' column totals 7 days, the target — our arithmetic, kept modest.

How it works

How the capital plan stays current

Seven agents read, track drift, cost, rank and challenge every move; the Director approves and the VP releases.

What comes in
Evidence in5 systems · assessments, work orders, space, budget, drawings
Agents at work
Reading agentfindings with pages
Drift agentwork orders nightly
Then
Cost agentescalation, soft costs
Space and use agentroom hours
Then
Priority agentfive criteria
Challenger agentargues every move
Then
Plan writer agentboard and state
A person decides
Director of Facilitiesapproves · the VP releases
What comes out
Ranked plan
Board list
Audit pack
One case, step by step

One failing rooftop unit, from work orders to the board list

Tuesday, March 16, 2027, at Brandvale Community College: 3 campuses, 41 buildings, 1.6 million gross square feet and $118.0M of deferred maintenance. Here is how the Technology Center's HVAC renewal moved, screen by screen, in the working solution.

  1. 01Morning

    Every building on three campuses, banded by system condition

    Marcus Delgado · Director of Facilities

    Each campus is a strip of building elevations drawn to their square footage, banded roof, envelope, HVAC, electrical and plumbing, each band with its condition word and the facility condition index underneath. The Technology Center is tagged for a change, its HVAC band hatched "poor?", and the proposal sits pinned on top of the ranked capital plan.

    Technology Center HVAC renewal, 19 → 4: rooftop unit 3 failed 14 times in 12 months. $1.86M, waiting for you.

  2. 025:14 a.m.

    The work orders say the unit is failing; the assessment said fair

    Drift agent

    The Drift agent read 31 new work orders overnight. Rooftop unit 3, which supplies makeup air to the welding shop's fume extraction, had 14 corrective calls in 12 months against a threshold of 6, $41,700 of repairs, and a shop closed 9 days. It proposes HVAC fair → poor, with confidence 0.93: the building's index goes 0.21 → 0.34 and its deferred maintenance $2.22M → $3.59M.

    Ray Castellanos, Maintenance Supervisor, on the work order: "replace, not repair".

  3. 035:15 a.m.

    An estimate where every line has a source

    Cost agent

    The 2022 assessment priced rooftop unit 3 at $612,000 (page 47) and units 4 and 5 at $588,000 (page 48). Escalated at 3.0% a year to summer 2028, construction comes to $1,432,863; soft costs by board policy 6620 — design, contingency, project management, permits and testing, commissioning — bring the project to $1,862,722.

  4. 045:16 a.m.

    Why the score moved, criterion by criterion

    Priority agent

    On the board's five weighted criteria the score goes 61 → 84: life safety 17 → 26 of 30, condition and failure risk 13 → 27 of 30, with teaching use 19 of 20 (38 hours a week, 186 students), accessibility 4 and energy 8 unchanged. The project moves from rank 19 to rank 4, ahead of Lot C at 79.

  5. 055:18 a.m.

    An agent that argues against the move

    Challenger agent

    It raises three objections, each cited. Three calls were the condensate pump — conceded, but the score would still be 82 and rank 4. A $68,000 compressor could buy 3 years — answered: the unit runs on R-22, no longer produced, and units 4 and 5 are the same age. The third stands: Campus Center restroom accessibility ($0.92M, ADA transition plan item TP-31) would drop below the FY2027-28 funding line.

    Its alternative: split Lot C. The accessible stalls and route ($186,000) keep their rank; resurfacing ($934,000) scores 52 alone.

  6. 069:06 a.m.

    The Director approves with a reason

    Marcus Delgado

    Marcus asks Priya Raman to prepare the Lot C split, then approves the rank change with the reason code "Evidence supports the move". The decision is logged with the score, the three objections, the sources and the model versions, and the Plan writer agent updates the board line.

  7. 07After the approval

    The campus view, every move explained

    Marcus Delgado

    The Technology Center's HVAC band now reads poor and its index 0.34. In the ranked list the renewal sits at rank 4, marked "from 19" with its reason, and every project it passed shows the rank it came from.

  8. 08The five-year plan

    Funding by year, and the funding line

    Priya Raman · Capital Projects Manager

    Thirty-eight projects need $96.4M over five years; $71.8M is funded by the 2024 facilities bond, state capital outlay and scheduled maintenance reserves, and $30.3M waits for a future bond. FY2027-28 holds $14.46M of $14.6M. Priya can re-estimate or assign a project manager to many projects at once.

  9. 09Before April 13

    A board list where every project carries its reason

    Dr. Lena Whitfield · Vice President of Administrative Services

    The Plan writer agent drafts the FY2027-28 board list from approved decisions only, with the bond oversight note and the state five-year request beside it. Line 4 says why the project moved, in plain words. The release checklist reads "not ready" until the audit pack is built, and only Dr. Whitfield can send it.

  10. 10Sealed

    Every step on the record, in a pack for each audience

    Joan Pell · Internal Auditor

    The trail lists who, what, when, why and the evidence for people and agents alike. The pack for the Board of Trustees holds the board list with a cited reason per project, 23 rank changes with their challenger records and approvals, 1,184 findings with their pages and 214 cited work orders. Pack FCA-2027-03 is sealed.

Who it’s for

Built for everyone who signs the capital plan.

The same rank change, seen by the five people who carry it — what their day looked like, and what it looks like now.

MD
Marcus DelgadoDirector of Facilities · 41 buildings, 9,800 work orders a year
Director of Facilities
Before
Plans from a consultant's snapshot and moves projects in a spreadsheet or a meeting, with the work orders that prove a system is failing sitting unread in another system.
Now
Sees what failed before anyone asks him to move a project, hears the counter-case, and approves each change with a reason.
LW
Dr. Lena WhitfieldVice President of Administrative Services · presents the plan to the board
Vice President of Administrative Services
Before
Takes a ranked list to the Board of Trustees and the bond oversight committee without the evidence or the trade-off behind each project.
Now
Releases a board list, a bond oversight note and a state five-year request where every line carries its reason and the person who approved it.
PR
Priya RamanCapital Projects Manager · prepares, never approves
Capital Projects Manager
Before
Re-keys findings from PDFs and rebuilds estimates by hand each time a project moves.
Now
Accepts the findings the agents read with their page, checks a cost build-up where every line is cited, and prepares changes for Marcus to decide.
RC
Ray CastellanosMaintenance Supervisor, North Campus · closes work orders
Maintenance Supervisor
Before
Knows which units are dying, but his work orders never reach the capital plan.
Now
Confirms a work order's cause when the Drift agent asks, and his "replace, not repair" travels with the proposal to the Director.
JP
Joan PellInternal Auditor · reads everything, changes nothing
Internal Auditor
Before
Reassembles who moved a project, and why, from emails and spreadsheet versions.
Now
Reads the trail and downloads a sealed pack for the board, the bond oversight committee or the state reviewer.
Built on the engine

7 agents. Each with one job, and hard limits.

Seven agents read, track drift, cost, rank and challenge every move; the Director approves and the VP releases.

Reading agent

Reads consultant assessments, roof reports and drawings into findings by building and system, each with its page.

  • Never infers a condition the source does not state
  • Below 0.90 confidence, a person accepts, corrects or rejects the finding
Drift agent

Reads each night's work orders, ties them to assets, and proposes a condition change when an asset crosses the threshold.

  • Proposes only
  • Preventive work orders never count
  • Asks the Maintenance Supervisor to confirm causes before a move to poor or critical
Cost agent

Escalates estimates with the construction cost index and adds soft costs from board policy.

  • Never moves a project
  • Cites every line
Space and use agent

Counts room hours and programs per building from the space inventory and class schedule, for the teaching-use score.

  • Room hours only, never student names
Priority agent

Scores and ranks every project on the board's five weighted criteria and shows what moves.

  • Uses weights only from approved settings
Challenger agent

Argues against every rank change of 3 or more places or across a funding line, and proposes an alternative that keeps the line whole.

  • Never blocks a decision
  • Cites every objection
Plan writer agent

Drafts the board list, the bond oversight note and the state five-year capital request.

  • Writes from approved changes only
  • Released by the vice president, never by an agent
Director and VP

Approve and release. The agents propose; a named person decides.

Ask in plain words

Ask about any building, system, project or rank

The assistant answers with the work orders, assessment pages and plan behind it, and opens the screen where the person can act.

Why did the Technology Center jump to rank 4?

Because rooftop unit 3 stopped being "fair": 14 corrective work orders in 12 months against a threshold of 6, the welding shop closed 9 days without makeup air, the 2022 assessment said fair with 6 years left, and the unit uses R-22, no longer produced. Score 61 → 84: life safety 17 → 26 and failure risk 13 → 27. It waits for your approval.

What drops below the funding line if I approve?

One project: Campus Center restroom accessibility, $0.92M, ADA transition plan item TP-31. It would move from rank 10 to 11 and into FY2028-29. The Challenger agent found a way to keep it: split Lot C. The accessible stalls and route ($186,000) keep rank 5; resurfacing ($934,000) scores 52 alone. FY2027-28 then holds $14.45M of $14.6M.

Which buildings are most likely to fail next winter?

Three, by heating failures and condition: the Aquatics Center's boiler B-1 (7 work orders, on watch), Central Plant North's pump P-3 (4 work orders, poor HVAC) and the East Gym's unit heaters (past their life). None crosses the drift threshold yet; a change is proposed the night one does.

Draft the note to the bond oversight committee

Drafted for April 21 on the Board screen. It says the Technology Center HVAC renewal ($1.86M, bond category 3) is pending approval, with its cited reason, and that every listed project carries its evidence and approval in the attached pack. Dr. Whitfield releases it.

Every screen

The working solution, as it ships.

13 screens from the working solution, on its sample data. Pick one to see it large.

Every building on three campuses, banded by system conditionEach campus is a strip of building elevations drawn to their square footage, every building banded roof, envelope, HVAC, electrical and plumbing with a condition word, its facility condition index underneath. Main Campus carries $73.4M of deferred maintenance at index 0.22. Beside it, the ranked capital plan with the FY2027-28 funding line and the pending proposal pinned on top.
The work orders that say a system is failing, against the assessment that said fairThe Technology Center after the Drift agent's run: each system as assessed in 2022 and as it is now, rooftop unit 3's 14 corrective work orders on a timeline, $41,700 of repairs and 9 days of shop closures, and the facility condition index moving from 0.21 to 0.34.
Why the score moved, criterion by criterionThe rank change the Director decides: the score on the board's five weighted criteria going 61 → 84, what moves if he approves — the Campus Center restrooms would drop to FY2028-29 — and the decision with its reason codes.
An agent that argues against every rank changeThe Challenger agent's three objections, each cited and answered — one conceded, one answered, one standing — and its alternative: split the Lot C parking project so the restroom accessibility project stays above the funding line.
The Director approves, with a reason, and the plan updatesMarcus Delgado approves at 9:06 a.m. with the reason "Evidence supports the move". The decision is logged with the score, the three objections, the sources and the model versions, and the board line is updated.
The capital plan after approval, every move explainedThe same elevations and ranked list after the decision: the Technology Center's HVAC band reads poor, the renewal sits at rank 4, and each project that moved shows where it came from.
A five-year capital improvement plan with funding by yearThirty-eight projects and $96.4M of need: funded against allocated for each year, the funding line, each project's top criterion, score, cost and how far it moved, and $30.3M that waits for a future bond.
A capital renewal estimate where every line has a sourceThe Cost agent's build-up for the Technology Center renewal, from the 2022 assessment's estimates on pages 47 and 48 through escalation and soft costs to $1,862,722, with a what-if on the escalation rate and the funding checks.
Work orders read every night, against a thresholdThe Drift agent's watchlist across 9,800 work orders a year: every asset with repeated corrective calls, its repairs as a share of replacement, its 2022 condition and what was done about it.
A finding read from a drawing, waiting for a personOf 1,184 condition findings, 8 wait below 0.90 confidence. Viewed as the Capital Projects Manager, a panel rating read from a drawing at confidence 0.71 sits beside the source, with Accept, Correct and Reject with a reason.
A board list where every project carries its reasonThe FY2027-28 board list drafted from approved decisions only, with the state five-year request and the bond oversight note, and the release checklist the vice president signs off.
Every step on the record, and a sealed pack for each audienceThe trail of people and agents with who, what, when, why and evidence, kept for the life of the bonds plus three years, and the export pack built for the Board of Trustees.
Separation of duties, enforcedWhat each role can and cannot do: the person who prepares a change never approves it, and the person who approves never releases the plan. Every settings change needs the vice president's approval.
Governance

Built for the board, the bond committee and the auditor: cited, approved, on the record.

Six roles, separated by dutyA maintenance supervisor confirms causes; the capital projects manager accepts findings and prepares changes; the Director of Facilities approves condition, cost and rank changes; the vice president releases the board list and approves settings; an internal auditor reads and exports; an administrator runs connections, with no plan decision.
A second person on every decisionThe person who prepares a change never approves it, and the Director who approves never sends the plan to the board. Settings changes are proposed by the administrator and approved by the vice president.
Every condition word cites its sourceCondition words, cost lines, scores and board lines each open the passage they came from: an assessment page, a roof report, a drawing sheet or a work order.
Every rank change is argued againstThe Challenger agent raises cited objections on every rank change of 3 or more places or across a funding line. It never blocks; its standing objections are kept with the decision.
FERPA-aware by defaultClass schedules are used as room hours only, never with student names. Work order requester names are hidden, accessibility requests are redacted to a category, and security system details are removed from public packs.
Sealed packs, replayable decisionsWho, what, when, why and which evidence, for people and agents alike. Packs for the board, the bond oversight committee, the state reviewer and the auditor are sealed with the settings version, and any decision can be replayed from its inputs.
Configuration

Your board's priorities, not ours

Every rule the agents work by is a setting, versioned and approved by the vice president. A new version is tested on last year's plan first.

SettingDefaultChoose from
Priority weights (board policy 6610)Life safety 30 · condition and failure risk 30 · teaching use 20 · accessibility 10 · energy and operating cost 10Must total 100; the whole plan is re-ranked for comparison first
Drift threshold6 corrective work orders in 12 months, or repairs above 10% of replacementRolling window; preventive work orders never count
Cause confidence before proposing0.85Below it, the Maintenance Supervisor confirms causes first; required for any move to poor or critical
Finding confidence0.90Below it, the Capital Projects Manager accepts, corrects or rejects with a reason
Escalation and soft costs3.0% a year (mechanical); soft costs 30% (board policy 6620)Re-estimate a source older than 24 months; round to $10,000 or $1,000
Approvals due3 business daysThe vice president is told on day 4
Drift checkEvery night at 5:00 a.m.Twice a day, or on request
Keep plan recordsLife of the bonds + 3 yearsOr 10 years; work order history 7 or 10 years
Connections

Facility condition assessment software that works with the systems you already run

Work order systemwork orders and the 2,300 assets, read every night
Space inventory and class scheduleroom hours by program, never student names
ERP capital budgetfunding by source and year, read only
Document managementconsultant assessments, roof reports and drawings
Construction cost indexescalation for every estimate
State facilities reporting portalthe five-year capital request, as an export file
What it changes

The difference, in numbers.

Every figure is labelled: a target the solution is built to, an estimate, a typical published result, or a proven one.

target
100%
of FY2027-28 projects ranked on five criteria, each with a cited reason
Cited
rank → reason → source
target
7days
from a failing asset's work orders to an updated condition, not the next consultant cycle
Consultant cycle3 to 5 years
With agents7 days
target
0
rank changes without the Director's approval and a challenger's case on record

Sources: Higher Ed Dive, April 10, 2026, reporting a 2026 state-of-facilities study ($156 per gross square foot of deferred capital renewal in 2025, up 8%; spending on existing buildings at 73.5% of what keeps the backlog from growing) · US EPA, phaseout of HCFC-22 (R-22) · 28 CFR 35.150 (ADA Title II) · 29 CFR 1910.252(c) (welding ventilation) · FERPA, 34 CFR Part 99 · "target" = design goal, measured in the live solution · "demo" = seen in the working solution, on its sample data · "typical" = published figures · "estimated" = our arithmetic from published inputs. Brandvale Community College, its buildings and the people named on this page are fictional — characters and sample data in the working solution.

Questions

What facilities and finance leaders ask us.

What is Facility Condition Assessment?

Facility Condition Assessment is facility condition assessment software for colleges and school districts: facilities teams turn condition data and work orders into a ranked, bond-ready capital plan. Seven agents read the assessments and work orders, keep each building's condition current, cost and rank the projects, argue against every rank change and draft the board list. The Director of Facilities approves every change and the vice president releases the plan.

What is the facility condition index (FCI), and how is it calculated?

The facility condition index is a building's deferred maintenance divided by its current replacement value. In the method the working solution uses, below 0.05 is good, up to 0.10 fair, up to 0.30 poor and above that critical; published bands vary. When the Technology Center's HVAC moved from fair to poor, its deferred maintenance went from $2.22M to $3.59M and its index from 0.21 to 0.34.

How does it keep condition current between consultant assessments?

The Drift agent reads every night's work orders, ties each to an asset and proposes a cited condition change when an asset crosses the threshold — by default 6 corrective work orders in 12 months, or repairs above 10% of replacement. Preventive work orders never count, and a maintenance supervisor confirms the cause before anything moves to poor or critical.

How are capital projects prioritized?

The Priority agent scores every project on the board's five weighted criteria — life safety, condition and failure risk, teaching use, accessibility, and energy and operating cost — using only weights from approved settings. Every rank change of 3 or more places or across a funding line is argued against by the Challenger agent, with cited objections and an alternative, before the Director decides.

Does it change our work order system or our ERP?

No. The agents read the work order system, the space inventory, the ERP capital budget and document management; they never write to the work order system or the ERP, and never change a condition, cost or rank on their own. The five-year capital request leaves as an export file for the state portal.

Do people stay in control?

Yes. Agents propose, argue and draft; people decide. The capital projects manager prepares, the Director of Facilities approves every condition, cost and rank change with a reason code, and only the vice president can release the board list. The person who prepares a change can never approve it.

Can it produce the board list, the bond oversight note and the state five-year request?

Yes. The Plan writer agent drafts all three from approved decisions only, with a cited reason on every line, and the vice president releases them. A sealed pack for each audience — the board, the bond oversight committee, the state reviewer or the internal auditor — carries the evidence behind every project.

How long does it take to go live?

The Agentic Solution Engine builds and deploys it from your requirements and documents — your latest assessment, a year of work orders and your board's capital criteria — and it goes live once every quality gate has passed. We will walk you through it on your own buildings first.

See it on
your buildings.

We'll run Facility Condition Assessment on your last assessment and a year of your work orders.