- Before
- 30 to 60 findings on a patrol day, read one by one. “I spend my morning finding out which pole a photo is, and whether we already have a job for it.”
- Now
- Opens a board already sorted by clock, with every work request drafted and every repeat sighting on its open job. She decides, raises and sends.
One morning's findings, from the overnight inspections to a dated job
Lumina Utilities runs electricity and water in its Northern network from the Wexmoor depot. On Tuesday, October 13, 2026, at 07:40, maintenance planner Elena Marsh opens Inspection Finding Triage. Here is what happened overnight and what she decides, screen by screen, in the working solution.
- 0107:40
46 findings since 17:30, already sorted by their clocks
Elena Marsh · Maintenance planner, Northern networkSince Elena left yesterday, 46 findings arrived from 5 inspections. Each one was read, tied to its asset, given a priority from Lumina's rules and checked against 1,284 open work orders before any job was drafted. They sit in six lanes: Make safe · 24 hours (2), Within 30 days (12), Within 6 months (15), Next planned visit (6), Already open · evidence added (8) and Needs a look (3).
“35 work requests drafted · 2 sent · 8 added to open jobs · 3 need a look · 0 without a due date”
- 02Overnight
Five deliveries split into findings, each with its measurement
Report readerKestrel Ridge Aerial's drone patrol of the WX-33 Wexmoor–Halden 33 kV line — 212 images and a flight log — became 19 findings in 11 minutes. Oakline Pole Testing's 22-page PDF with a sheet of 88 poles became 14 in 1 minute 40 seconds. Ferrow Thermal Services' 38-page thermography survey of Halden Cross 33/11 kV substation became 6. Five patrol forms from Lumina line crews and the Tarn Hill pump-station inspection add the rest.
The report reader never invents a measurement that is not in the report, and every finding keeps a link to the page or frame it came from.
- 03Oct 12, 18:09
A hot clamp goes straight to make safe
Severity assessor and Clock watcherF-10421, image IR-0131: the red-phase palm clamp on 11 kV disconnector DS-4 is at 96.4 °C against 35.2 °C on the yellow phase — a 61.2 K rise at 58 % load. Rule TH-1, over 40 K between like components, makes it a 24-hour make-safe. The clock watcher paged the duty supervisor at 18:10; Tom Adeyemi confirmed at 18:22, a substation crew is booked for 08:00 and switching schedule SS-HC-1014 is issued.
Drafted task, WR-26-07726: “Make safe: move Section 4 load to CB-9, isolate DS-4 and re-make the red-phase palm clamp”
- 04Every finding
Checked against 1,284 open work orders before a job is drafted
Duplicate checkerReplayed on the board, each finding is dealt into its lane as it arrived. F-10418 — drone frame 0147 over pole WX-33/117, a cracked insulator with carbon tracking found at 11:42 — stops before it lands while the duplicate checker searches the open jobs on the same asset and component.
“Duplicate checker · F-10418 → WO-418833 · same pole tag · 4 m apart · same phase B insulator · 97 % match”
- 05Already open
A 97 % match with a job Gareth raised in September
Duplicate checkerWO-418833, “Replace cracked insulator, phase B”, was raised on Sep 22 by Gareth Lyle from a foot patrol: 6 months, due Mar 22, 2027, planned, no crew. Same pole tag, GPS 4 m apart, same phase B pin insulator. No new job is raised; the drone photo is added to WO-418833 as evidence. But the defect is worse now: Gareth's photo showed a hairline crack with no tracking, and the drone frame shows tracking down two sheds.
“F-10418 matched WO-418833 at 97 %. No second job was raised and no second crew will go.”
- 06One click
Elena raises the open job to 30 days
Elena Marsh · Maintenance plannerRule IN-2 puts an insulator cracked with carbon tracking or flashover marks at 30 days, so the duplicate checker proposes raising WO-418833 from 6 months to 30 days, due Nov 11. It cannot change the job itself. Elena compares the two photos side by side and raises it; Gareth is told his job moved up, and both photos stay on the job.
“WO-418833 raised to 30 days by Elena Marsh · due Nov 11.”
- 07Needs a look
Three findings wait for a person, with the reason
Tom Adeyemi · Inspection supervisorF-10414 is a drone frame soft from wind: a line across the second shed of phase A on WX-33/127, crack or shadow, at 0.58 confidence — under the 0.80 threshold, so it does not sit on its own. F-10435 has no pole tag and a GPS fix between two poles 11 m apart. F-10444's note names WX-35/216 but the photo's tag reads WX-35/215. Tom settles each one.
Choices on F-10414: “It is a crack · 6 months” · “Ask Kestrel Ridge to re-fly pole 127” · “No defect · close”
- 08Overdue
A patrol sighting brings an overdue job back to the top
Duplicate checker and Clock watcherPriya Shah's patrol form, F-10443 — “Crossarm soft at the phase C end, getting worse” — matches WO-418520, raised on Aug 14 at 30 days for WX-35/212 and now 30 days overdue with no crew booked. The sighting is added as evidence and the job is escalated to Elena. The work orders list shows every open corrective job with its clock and the evidence added overnight.
“WO-418520 · Replace crossarm + F-10443 · Overdue 30 days · no crew booked”
- 09Sent
The 30-day lane goes to work management in one pass
Elena Marsh · Maintenance plannerEach drafted request carries the task, crew, materials, outage need, the marked photo, the map position and the due date — “Replace the crossarm and king bolt”, “Cut back the vegetation to 3 m clearance”, “Replace the pole; mark it ‘no climbing’ until replaced”. Elena reviews the lane and sends the 12 requests, all due Nov 11. Nothing goes to the work management system until she does.
“12 work requests sent to work management · WR-26-07711 to WR-26-07740”
- 10Every hour
Every due date watched until the job is done
Clock watcherThe clock watcher checks every open job and finding against its due date each hour, alerts the planner 7 days before a 30-day job is due and lists what is at risk or overdue — the Tarn Hill kiosk door, 4 days overdue with a crew booked Oct 14; the Kellby reservoir roof hatch, due Oct 27 with no crew. Over 90 days: 23 of 23 make-safes raised within the hour, 94 % of 30-day jobs on time and 0 findings without a due date.
The clock watcher never extends a due date.