- Before
- Reviews 40–60 closeouts each morning before planning the week. “I can't plan next month from a history that says ‘fixed’.”
- Now
- Opens 46 jobs already checked, accepts the 29 clean ones in one click and works the 17 with gaps — each gap with its photo, note or timesheet line.
One night fault, from the van to clean asset history
At 02:14 on Monday 12 October 2026, 23 properties on Larch Lane, Ashcombe lose supply. Crew N-14 — Dylan Marsh, crew lead, and Owen Pryce, lineworker — find a blown L2 LV fuse at pole-mounted transformer PMT T-48211 on pole AS-2207, restore supply at 04:40 and close the job from the van at 05:10. Here is what happens next, screen by screen, in the working solution.
- 0107:05
The morning opens on a checklist, not a list of jobs
Tomás Reyes · Maintenance planner, Distribution NorthForty-six jobs closed since 18:00 on Sunday across Distribution North and Water South, all checked by 07:05. Each is a row with six marks — codes, time, parts, photos, readings, follow-up — and a quality score, worst first. 29 are clean and ready to accept in one click; 17 have 21 gaps between them. The Larch Lane fuse job sits at the top, scoring 58.
“46 closed since 18:00 Sun · 29 clean · 17 for you · 21 gaps”
- 02One click
The crew's notes, read against the codes
Notes reader and coderDylan's note reads: “L2 LV fuse blown at PMT. Bird strike on LV mains span to pole AS-2208, remains at base. Replaced fuse, supply restored 04:40, all 23 on. Crossarm at the cutouts is cracked, wants changing.” Failure mode ELV-02 and activity REP-01 are coded; the cause is blank. The margin notes tie each sentence to a gap: the cause, a fuse-link not on the parts list, a defect not raised — and one that matches the fault record.
“Cause is blank. The notes name a bird strike. Suggested cause EXT-03 External — wildlife contact.”
- 033.8 seconds
Four photos, read like the planner would
Photo readerPhoto 1: the L2 fuse-link operated. Photo 2: a new fuse-link, its label “100A gG 415V” legible — not on the parts list. Photo 3: the crossarm at the cutouts with a crack about 40 cm long. Photo 4: 239.4 V L2–N after restoration. Van V-114 issued one LV fuse-link 100 A gG at 03:58; the job's parts list has only four cable ties.
The photo reader never books a part. Below 0.85 confidence it asks rather than proposes.
- 04Planned vs actual
Owen's hours were worked, not booked
Labour and materials reconcilerThe timesheets show Dylan Marsh and Owen Pryce on the job from 02:40 to 06:10 — 3.5 hours each. Only Dylan's 3.5 hours are booked. Against a plan of 4.0 hours for a standard LV fuse job, 7.0 hours worked is 75 % over plan, outside the ±25 % tolerance, so Grace Okafor, the work management supervisor, sees it too. The closeout summary is already written: issue, diagnosis, action and parts.
“Owen Pryce worked 3.5 h on this job and it is not booked.”
- 05Every step, timed
How this job was checked
Six agentsThe run trace shows each agent's work. The closeout checker applied the rules for Corrective · LV fuse operation in 0.4 s. The notes reader matched “bird strike on LV mains” to EXT-03 at 0.93 confidence. The follow-up finder found no open work on pole AS-2207 and drafted “Replace LV crossarm”, P3, 2 × 3.0 h. The repeat failure watcher found three LV fuse operations on T-48211 in seven months.
“Score 58 / 100 · Tomás Reyes decides: accept, or send back with the gaps”
- 06The history
The third fuse operation, and the first with a cause
Repeat failure watcherT-48211 is a 200 kVA, 11 kV / 415 V transformer feeding 23 properties, installed in May 2011. Its L2 fuse operated on 14 March and 2 August too, both closed before closeouts were checked: no cause, no parts. Today's closeout is the first to give one — a bird strike on the span to AS-2208 — and the watcher suggests a wildlife guard on that span, fitted with the crossarm change, for Henrik Solberg, the reliability engineer.
“Repeat failure · three LV fuse operations in 7 months”
- 07Three decisions
A part proposed, a cause accepted, work raised
Tomás Reyes · Maintenance plannerTomás adds the fuse-link for the crew to confirm: the line goes on the parts list as proposed, linked to photo 2 and the van V-114 issue. He accepts the suggested cause, EXT-03 External — wildlife contact. He approves the follow-up, and “Replace LV crossarm, pole AS-2207” is raised as WO 3318502, within 28 days.
“Follow-up raised · WO 3318502 · Replace LV crossarm, pole AS-2207”
- 08Sent back
Back to the crew with the exact gaps
Tomás Reyes · Maintenance plannerTwo items go to Dylan Marsh, crew lead, in the crew app and by text: book Owen Pryce's hours, +3.5 h, and confirm the LV fuse-link 100 A gG used. Each item goes with its evidence — the photo, the timesheet line, the note.
“When the crew replies the checks run again; nothing is booked until they confirm.”
- 0907:52
Confirmed from the van
Dylan Marsh · Crew lead, crew N-14On his phone Dylan sees the request from Tomás with the timesheet line for Owen's hours and photo 2 with the van issue. He taps Yes twice, and the job shows confirmed at 07:52. The checks run again on his reply and every gap on the job is closed.
“4 jobs sent back in the last 24 hours · 3 confirmed · median reply 47 minutes”
- 10Clean history
The part is on the job, the stock list goes to stores
Labour and materials reconcilerOn planned vs actual, the fuse-link line now reads confirmed. Three more parts seen but not booked overnight are still open — a pair of 150 mm repair clamps, a spindle seal kit and four ABC connectors — making four lines and $412.80 with the fuse-link. The stock adjustment list goes to the Ashcombe and Fenwick stores. T-48211's history now reads: LV fuse operated · external — wildlife contact · replaced LV fuse-link 100 A gG · 7.0 h · follow-up WO 3318502 raised.
An estimated $262,392 a year of parts put back on the right job and asset — Lumina's own pilot inputs.