WorkflowField Service & Work Management

Work Package Preparation

Work package preparation that checks every permit, locate ticket and material against the day the crew will work

Crews arrive with everything they need.

See one case, screen by screen ↓
demo186problemsfound before the day by the date checker in the first eight weeks — a permit lapsing, a part arriving late, an authorisation running out
demo78% fewercrews stood down since go-live: 2.6 a week against 11.8 before
estimated$1.05Ma yearin stood-down crew days avoided: 612 stand-downs × $2,150 a crew day, 80% fewer
demo94%of packs fully ready a week before the job, against a target of 95%
The problem

Why crews still turn up to a job they cannot start

Before a crew can replace a ring main unit, a pole or a 300 mm valve, a work planner builds the job pack by hand: the scope and steps from the standard job plan, the single-line diagram and GIS extract, the road opening permit, the locate ticket and the customer notice, the materials from stores, the method statement and risk assessment, and the switching programme the control room will carry out. Each piece comes from a different system and is copied, printed or attached one at a time.

Nobody checks the finished pack against the day the crew will actually work. A permit that was valid when the pack was built ends two days before the job. A joint kit reserved last week goes to a fault. A locate ticket requested too early expires before the dig. The crew finds out at the 06:45 briefing, stands down, and 212 customers have been told they will be off supply for nothing. OSHA 29 CFR 1910.269(c) has the employer give the employee in charge all available information on existing conditions, and has that person brief the crew on hazards, procedures, energy source controls and PPE before each job. A pack with a gap in it should never reach the crew.

demo612a yearjobs stood down before go-live because a prerequisite was missing or had lapsed — 4.2% of 14,600 planned jobs
demo$2,150a crew dayfor each stand-down: a crew of four, vehicles and plant hire, the customer notice sent again and planner rework
typical14–17dayslife of a one-call locate ticket in Tennessee, Oklahoma and Nebraska — request it too early and it lapses before the dig
Where a job pack's days goestimated
By hand8 days
With the solution2 days
  • Matching the standard job plan and writing the scope1 → 0.1 d
  • Pulling drawings, the GIS extract and unposted redlines1 → 0.1 d
  • Permits, locate requests and customer notices2 → 0.5 d
  • Materials and kitting across depots1.5 → 0.4 d
  • Method statement, risk assessment and switching programme1.5 → 0.6 d
  • Checking dates and chasing what is missing1 → 0.3 d

Estimated split for one planned job, in working days, from approved request to a pack ready to schedule — by hand and with the solution.

How it works

How a job pack is built

Seven agents assemble every job pack and check it against the job day; the planner releases it and the control room approves the isolation.

What comes in
Work request in5 sources · job plans, drawings, stock, permit rules
Agents at work
Job plan matcherscope + steps
Then
Drawings and GIS gatherer
Permit and consent checker
Kitting agent
Isolation planner
Then
Method statement writer
Then
Date checkeragainst the job day
A person decides
Work plannerfixes what is flagged and releases
What comes out
Six-tab job pack
Ready to schedule
Crew pack on the tablet
One case, step by step

One ring main unit replacement, from approved request to the crew's tablet

Lumina Utilities has to replace RMU-0417, an 11 kV ring main unit installed in 1987 with a condition score of 2 out of 10, at Kilnfield Lane on feeder KF-04. Crew 7 is booked for Tuesday 27 October, 07:00–15:00, with 212 customers off supply from 08:00 to 14:00 — two of them on the priority services list. Here is what happens, screen by screen, in the working solution.

  1. 01Approved for planning

    Every request arrives matched to a standard job plan

    Job plan matcher

    Marcus Hale approved work request WR-77104 for planning on 12 October at 16:40. On the Requests screen, each request waiting for a pack — fault follow-ups, asset inspections, new connections, water network and treatment jobs — already shows its best standard job plan and a match score. For the LV cable fault at Ellery Close it is SJP-LVJ-01 v3, LV straight joint in the footway, at 97%, with the carriageway joint at 71% as the runner-up.

    “Match from the asset class, the defect in the request and the last three jobs on this asset · Job plan matcher”

  2. 0206:12

    Seven agents build the pack at 06:12

    Seven agents

    From WR-77104 the agents assemble the pack in 6 min 40 s, and the run log shows each step as it happens. The job plan matcher takes SJP-RMU-11 v4 at 96%. The drawings gatherer collects five sheets. The permit and consent checker finds four permits and notices. The kitting agent reserves 17 of 18 lines. The isolation planner drafts SP-KF04-118 and sends it to the control room. Then the date checker holds nine dated items against Tue 27 Oct.

    “Date checker · Held 9 dated items against Tue 27 Oct — Permit RO-26-3317 ends Sun 25 Oct — 2 days short · TJ-185 order arrives 30 Oct”

  3. 0309:05

    Six tabs and a date line, tested against the job day

    Nadia Ferreira · Work planner, Distribution North

    Nadia opens the pack to six tabs — Scope, Drawings, Permits, Materials, Method statement, Isolation plan — each marked ready, at risk, missing or waiting. Under them the date line runs from today to beyond the job, with the job day as a vertical rule. Road opening permit RO-26-3317 is valid 12–25 Oct, so its bar stops two days short. Because her rule extends an existing permit automatically, an extension to Fri 30 Oct already went to Calder Bay Highways at 06:14; their decision is due Tue 20 Oct.

    9 of 12 ready · “3 to resolve before the crew sets off”

  4. 04Scope tab

    14 steps, three hold points, four authorisations checked

    Job plan matcher

    The scope is copied from SJP-RMU-11 v4: 14 steps and 26 crew hours, from the pre-job briefing to redlining the as-built and logging the SF₆. Three hold points are marked — switching confirmation, proving dead and earthing, and tests signed before restoration. Below them, every crew member's authorisation is checked for the job day: Tomás Reyes as authorised person for 11 kV switching and earthing, Liam Doyle for HV jointing to 15 Nov 2026.

    “Copied from the job plan; hold points cannot be removed”

  5. 05Materials tab

    Three joint kits short — and three at another depot

    Kitting agent

    The ring main unit, a Norvale NX3 from Westmere, is reserved and on site Mon 26 Oct. But Calder North has no TJ-185 transition joint kits, and purchase order PO-88412 delivers on Fri 30 Oct, three days after the job. Harbour depot holds four with none reserved. The kitting agent proposes moving three on the Wednesday stores run; it cannot do it alone. Nadia approves, and transfer TR-2291 arrives Wed 21 Oct.

    “Joint kits TJ-185: none at Calder North; the order arrives three days after the job”

  6. 06Method statement

    The site's hazards, written into the method

    Method statement writer

    The method statement comes in the Lumina template, nine sections, as a draft for Tomás to review. The writer adds what only the site shows: the joint bay is 14 m from the Kilnfield Primary School entrance, so no vehicle moves during drop-off and pick-up and a banksman stands at the gate. A Calder Gas 125 mm PE main runs at 0.6 m, 1.1 m from the bay, so the crew hand-digs within 0.5 m.

    “Hold points are copied from the job plan and cannot be removed.”

  7. 07With the control room

    Grace approves the switching programme, not the paperwork

    Grace Lindqvist · Control-room authorised engineer

    The isolation planner drafted SP-KF04-118 from the network model: close the normal open point RMU-0419, open RMU-0418 and RMU-0416 towards the work, lock off and tag both points of isolation, prove dead and apply earths E1–E3. Grace sees the back-feed already checked — KF-05 carries 186 A of 400 A — and both priority customers listed for calls by 22 Oct. She approves, or returns it with comments.

    The isolation planner never issues a switching programme — only the control-room authorised engineer approves.

  8. 08Approved · 09:12

    Who goes off supply, and who is called first

    Isolation planner

    The isolation plan shows the feeder during the work and the 212 customers off at TX-0417: 197 homes and 15 businesses. Kilnfield Primary stays on, fed from TX-0420. Two priority services customers are listed by address — a home oxygen concentrator and home dialysis — with a call booked by 22 Oct and a generator offered. The planned interruption letter to all 212 posts Mon 19 Oct, five working days ahead.

    “Approved by Grace Lindqvist · Control-room authorised engineer · 13 Oct, 09:12 · SP-KF04-118 issue 1”

  9. 09Release

    Released to scheduling with one condition, watched every night

    Nadia Ferreira · Work planner

    Eleven of 12 checks are ready. The permit extension is still open, so Nadia releases WO-48213 to Owen Mercer for Tue 27 Oct with one condition: RO-26-3317 extended to 30 Oct by Tue 20 Oct. If Calder Bay Highways refuses it, the date checker warns Nadia and Owen the same night, a week before the crew sets off.

    “If it is refused — the date checker warns you and Owen the same night”

  10. 10Mon 26 Oct, 17:30

    The crew lead gets the whole pack on his tablet

    Tomás Reyes · Crew lead, Crew 7

    Tomás receives the crew pack the evening before: the cover sheet, five briefing points — the school entrance, the gas main, the three hold points, the 410 kg unit lifted by HIAB only, the priority customers already called — and the six sections behind them. He asks whether the HIAB is booked for 06:30 or 07:00 and gets the answer from the plant hire booking. Then he accepts the pack.

    “06:30 at Calder North, driver Pete Lowry, HR-5521 · answered from the plant hire booking.”

Who it’s for

Built for everyone between the work request and the crew.

The same job pack, seen by the five people who plan, schedule, switch, work and pay for it — what their week looked like, and what it looks like now.

NF
Nadia FerreiraWork planner, Distribution North · builds and releases job packs
Work planner
Before
Builds each pack by hand from the job plan library, the drawing store, GIS, the permit portal, the one-call centre and stores. “I spend a day building a pack and still find out on the morning that the permit ran out.”
Now
Opens a pack the agents built overnight, sees every dated item against the job day, fixes only what is flagged and releases it.
OM
Owen MercerScheduler · fills each crew's week from the ready backlog
Scheduler
Before
Fills the week from packs that look ready and finds the gaps when a crew stands down. “Give me packs that are really ready and I'll fill the week.”
Now
Receives released packs with any open condition written on them, and a readiness calendar that marks the jobs that will break before their day.
TR
Tomás ReyesCrew lead, Crew 7 · authorised person · briefs the crew at 06:45
Crew lead
Before
Reads the pack the evening before and hopes nothing is missing. “If one thing is missing we stand down and the customers lose their power for nothing.”
Now
Gets the crew pack on his tablet with the briefing points, the hold points and the switching programme, asks questions and accepts it.
GL
Grace LindqvistControl-room authorised engineer · approves every switching programme
Control room
Before
Checks switching programmes that arrive late and incomplete. “I approve the isolation, not the paperwork around it.”
Now
Gets each programme drafted from the network model, with the back-feed loading checked and every priority customer listed, and approves or returns it.
MH
Marcus HaleHead of Work Planning · owns stand-downs and the ready backlog
Head of Work Planning
Before
Owns the stand-downs and the ready backlog, and pays for every crew sent home. “Every stood-down crew is a day I paid for twice.”
Now
Sees packs fully ready a week ahead, stand-downs by cause, the ready backlog and the cost worked out from his own inputs.
Built on the engine

7 agents. Each with one job, and hard limits.

Seven agents assemble every job pack and check it against the job day; the planner releases it and the control room approves the isolation.

Job plan matcher

Reads the work request, the asset record and the inspection notes, scores every standard job plan for the asset class and the defect, and copies the best plan's steps, hold points, crew and hours into the pack.

  • Never edits a standard job plan
  • Shows its match score and the runner-up
  • Hold points are copied, never removed
Drawings and GIS gatherer

Pulls the current single-line diagram, a 1:500 GIS extract, cable records and the site layout for the asset, and searches for unposted redlines within 50 m.

  • Never marks a drawing current when a newer redline exists
  • Read-only access to GIS
Permit and consent checker

Lists what the job needs — road opening permit, traffic management, locate ticket, customer notice, priority customer calls, landowner consent — checks each validity window against the job date, and requests an extension when an existing permit ends early.

  • Never applies for a new permit without the planner
  • Extensions only while the planner's rule is on
  • Every date cites its permit
Kitting agent

Expands the job plan's bill of materials for the site, checks each line by depot for the day before the job including open purchase orders, reserves what is there, and proposes a depot transfer or an approved equivalent for a shortage.

  • Never raises a purchase
  • Transfers need the planner
  • Equivalents only from the approved list
Isolation planner

Finds the points of isolation, the back-feeds that keep other customers on and the earth points from the network model, drafts the switching programme in the control-room format, and counts customers and priority customers off supply.

  • Never issues a switching programme
  • Only the control-room authorised engineer approves
  • Lists every priority customer affected
Method statement writer

Writes the method statement and risk assessment in the utility's template — scope, access, hazards and controls, isolation, sequence, hold points, PPE, emergency arrangements, waste — adds site hazards from the drawings and the locate ticket, and writes five briefing points for the crew lead.

  • Never removes a hold point
  • Marks the draft until the crew lead accepts
Date checker

Collects every dated item in a pack — permit windows, locate ticket life, notice deadlines, material arrival, approvals due, crew authorisations, plant hire — compares each with the job date and the rules, flags any gap in days, and re-runs every night at 02:00.

  • Never moves a job's date
  • Warns the planner and the scheduler
Planner, control room and crew lead

Release, approve the isolation, accept. The agents propose; a named person decides.

Ask in plain words

Ask about any job pack, in plain words

Ask about any job pack, permit or material — or say what to change. Every answer points to its source.

What could stop the Kilnfield Lane job on the 27th?

Three things, and two are already in hand. Road opening permit RO-26-3317 ends Sun 25 Oct, two days before the job; an extension to 30 Oct went to Calder Bay Highways at 06:14 and their decision is due Tue 20 Oct. Joint kits TJ-185: none at Calder North, PO-88412 arrives Fri 30 Oct, and Harbour depot holds 4. Switching programme SP-KF04-118 is with the control room, due Fri 23 Oct.

Move the joint kits from Harbour depot

Done. Transfer TR-2291: 3 × TJ-185 from Harbour to Calder North on the Wednesday stores run, arriving 21 Oct, six days before the job. The Materials tab is ready. PO-88412 stays open to restock Harbour.

Which jobs in the next three weeks will break before their day?

Five of 41, from last night's check: Westmere Road, permit ends 16 Oct for a 19 Oct job; chamber lids arriving the day of the job; Kilnfield Lane, permit ends 25 Oct for a 27 Oct job; Quay Street, lane closure not booked; and pump station PS-07, a confined-space certificate ending 28 Oct.

Make permits stay valid two days after the job

Done. A permit must now be valid from the day before the job until 2 days after it, so a one-day slip does not void it. Re-checking the 13 permits, one more is now short — lane closure RO-26-3301 for WO-48190 ends Wed 21 Oct, one day after the job — and its extension is drafted for you to send.

Every screen

The working solution, as it ships.

13 screens from the working solution, on its sample data. Pick one to see it large.

The job packSix tabs, each ready, at risk, missing or waiting; the date line tested against the job day; the 12-item checklist and the planner's other packs.
Work requestsRequests approved for planning, each matched to a standard job plan with its score and the runner-up.
Agents at workSeven agents assemble the pack step by step, and the date checker holds every dated item against the job day.
Scope and authorisationsFourteen steps with three hold points copied from the job plan, and every crew member's authorisation checked for the job day.
MaterialsEighteen lines checked by depot; a shortage with the order date and a transfer from another depot waiting for the planner.
Method statementThe method statement in the utility's template, with the site's hazards added and the hold points that cannot be removed.
Control-room approvalThe switching programme step by step, with the back-feed loading checked, for the control-room authorised engineer to approve or return.
The isolation planThe feeder during the work, the switching steps, the customers off supply and the priority services customers to call.
Release to schedulingThe pack released with one open condition, and what happens if it is refused.
The crew packWhat the crew lead receives on his tablet: the cover sheet, briefing points, the six sections and his questions answered.
Readiness calendarThree weeks of electricity and water jobs coloured by readiness, re-checked overnight, with the jobs that will break before their day marked.
PerformancePacks fully ready a week ahead, stand-downs by cause, days to ready, the ready backlog and what stand-downs cost.
Your rulesThe date-check rules, what the agents may do on their own and who decides.
Governance

Built for switched and excavated work: released, approved, on the record.

Nothing reaches the schedule unreleasedA pack goes to scheduling only when the work planner releases it, and any open condition travels with it. The crew lead accepts the pack before the job.
Switching stays with the control roomThe isolation planner drafts and sends; only the control-room authorised engineer approves or returns a switching programme, with the approver, time and issue recorded.
Agents never buy or move a dateAgents never raise a purchase, never move a job's date and never remove a hold point. Depot transfers and equivalent equipment need a named person.
Extensions only under your ruleAn extension of an existing permit goes out automatically only while the planner's rule is on, and in the planner's name. New permits always wait for the planner.
Every item cites its sourceEach date and line in the pack links to where it came from — the permit, the purchase order, the depot stock record, the standard job plan, the switching programme.
Every step on the activity trailEach agent step and each decision — who approved a request, who released a pack, who approved a transfer or a programme — is recorded with its time, and every pack is re-checked against its job date each night.
Configuration

Your planning rules, applied to every pack, every night

How long a permit must outlast the job, when materials must be on site, how much notice customers get and what the agents may do on their own are settings chosen by the utility.

SettingDefaultChoose from
Permits stay valid after the job1 daySet in days, so a one-day slip does not void a permit
Materials on site1 working day1 working day · 2 working days before the job, at the depot or on site
Locate request timing2 days · 14-day lifeRequested 2 working days before the ticket must be valid; ticket life 14 days (Calder One-Call)
Notice to customers5 working daysPlanned interruptions; priority customers are also called 3 working days before
Switching approval due2 working daysBefore the job, so the crew has the approved programme
Nightly re-check02:00 dailyEvery pack in the next three weeks
Extend an existing permit when it ends before the jobOnOn · Off — sent in the planner's name; new permits always wait for the planner
Reserve stock for released packsOnOn · Off — transfers and equivalents still need a person; purchases always do
Connections

Works with the systems a job pack is built from

Work requests and work ordersrequests approved for planning from asset inspection, faults, new connections and water networks
Standard job plansapproved plans with steps, hold points, crew, hours and bill of materials — 214 in the sample
Drawings and GISsingle-line diagrams, GIS extracts, cable records, site layouts and redlines
Permit and clearance rulesroad opening permits, lane closures, one-call locate tickets, landowner consents and customer notices
Material catalogue and storesstock by depot, reservations, open purchase orders and approved equivalents
Network model and priority servicespoints of isolation, back-feeds, customer counts and priority services customers
What it changes

The difference, in numbers.

Every figure is labelled: a target the solution is built to, an estimate, a typical published result, or a proven one.

target
100%
of packs checked for isolation, locate ticket and crew authorisations before the crew sees them
Every pack
checked nightly until the crew sets off
estimated
$1.05Ma year
in stood-down crew days avoided: 612 × $2,150, 80% fewer
Stood down today612 a year
With the date check≈ 122
target
2days
from approved request to a pack ready to schedule, not 8
By hand8 days
With agents≈ 2 days

“demo” = seen in the working solution, on its sample utility's data · “target” = the design goal, measured in the live solution · “estimated” = worked out from the utility's own inputs ($1.05M = 612 stand-downs × $2,150 a crew day × 80% fewer; the split of a pack's days is our estimate) · “typical” = published figures: one-call locate ticket life of 14–17 days (Tennessee 811, OKIE811, Nebraska). Regulatory context: OSHA 29 CFR 1910.269(c) job briefing and (m)(3) de-energising; UK street-works permit schemes require 3 days, 10 days or 3 months' notice by works category. Lumina Utilities, and every person, place, council, supplier and record named on this page, is fictional — characters and sample data in the working solution.

Questions

What work planning teams ask us.

What is work package preparation software for utilities?

Software that builds the job pack a crew needs for planned work — scope and steps, drawings, permits and notices, materials, method statement and isolation plan — and tells the planner whether it is ready to schedule. Work Package Preparation uses seven agents to assemble the pack from the work request and checks every dated item against the day the crew will work.

How does it check a job pack against the job day?

The date checker collects every dated item — permit windows, locate ticket life, notice deadlines, material arrival, approvals due, crew authorisations and plant hire — and compares each with the scheduled date and your rules. Anything that does not cover the day is flagged with the gap in days, and every pack in the next three weeks is re-checked at 02:00 each night.

Does it apply for permits and locate tickets on its own?

Only where your rule allows. When an existing permit ends before the job and automatic extensions are on, the permit and consent checker requests the extension in the planner's name and logs it. New permits always wait for the planner, and customer notices are drafted and scheduled so they can be stopped before they post.

How does it handle switching programmes and isolation?

The isolation planner drafts the switching programme from the network model — points of isolation, back-feeds and earths — and counts the customers and priority services customers off supply. It sends the draft to the control room. Only the control-room authorised engineer approves or returns it; the agent never issues one.

Does it work for water jobs as well as electricity?

Yes. The same planning board takes water network and treatment requests — a seized valve on a 300 mm trunk main, a passing non-return valve at a pump station — alongside electricity work, with their own job plans, permits, materials and crews on the readiness calendar.

What does it save a utility?

Mainly the cost of crews stood down because something was missing or had lapsed. On the sample utility's own inputs — 612 stand-downs a year at $2,150 a crew day — an 80% reduction is an estimated $1.05M a year avoided. The design goal is a pack ready to schedule in 2 days instead of 8.

Do planners and the control room stay in control?

Yes. Agents read, draft, reserve and propose. The work planner releases each pack to scheduling and approves depot transfers, a design engineer approves equivalent equipment, the control-room authorised engineer approves switching, and the crew lead accepts the pack. Agents never buy, never move a job date and never remove a hold point.

How long does it take to go live?

The Agentic Solution Engine builds and deploys it from your requirements and documents — your standard job plans, permit and notice rules, method statement template and a sample of past work requests — and it goes live once every quality gate has passed. We will walk you through it on your own planned work first.

See it on
your planned work.

We'll run Work Package Preparation on a sample of your own work requests and standard job plans.