- Before
- Opens 40–60 new packs a week, ticks a 14-item checklist by hand and phones installers. “I spend my morning finding a missing stamp, and the feeder question waits for Marcus.”
- Now
- Opens each pack already checked, with every gap on its page and the feeder answer beside it, and sends one notice with everything missing and the routes that fit.
How DER interconnection application review works: one 2 MW pack, from arrival to notice
Lumina Utilities runs interconnection for the Eastvale district: 3 substations, 9 feeders, 186 open applications. On Tuesday 13 October 2026 at 08:06, Kestrel Solar & Storage submits a 2,000 kW solar and 1,000 kW / 2,000 kWh battery project for Harlow Cold Storage, 41 Quarry Road, on feeder ML-14. Here is what happens next, screen by screen, in the working solution.
- 0108:06
The queue map opens on capacity after the queue
Nadia Ferreira · DER interconnection coordinatorNadia's home is the Eastvale network drawn as a map: nine feeders coloured by the capacity left after every queued application, each open application a numbered pin in queue order. The new pack waits in the tray — DER-26-04417, 2,000 kW solar + battery on ML-14. The rail shows ML-14 already: hosting capacity 4.6 MW, existing generation 2.1 MW, seven in the queue, 1.4 MW left.
“1.4 MW left after the queue of 7” — the number a hosting-capacity map alone does not show
- 02One click
Check and place — the pin drops and seven agents start
Application pack readerNadia clicks Check and place. The pin drops onto ML-14 at queue place 8, and the run plays in the rail. The application pack reader reads 10 documents, 25 pages — the form, single-line sheets E-1 and E-2, three spec sheets, site plan, lease, insurance certificate and fee receipt — and records the page for every value it extracts.
Pack reader: marks anything unreadable for a person instead of guessing
- 0308:11 · 08:12
0.6 MW short on ML-14 — and room 600 m north
Capacity screener and Connection finderThe capacity screener nets the queue: 4.6 MW hosting − 2.1 MW existing − 1.1 MW queued in 7 ahead = 1.4 MW left; the project asks 2.0 MW, so it is 0.6 MW short and 3 of 6 screens fail. The connection finder searches 4 feeders within 1 km and draws a dashed route on the map to AV-07, 600 m north on Quarry Road, with 3.0 MW free.
“AV-07, 600 m north: 3.0 MW free · no upgrade” · Connection finder, 08:12
- 046 minutes after arrival
11 of 14 pass — three gaps, each on its page
Completeness checker and Account and meter verifierThe pack opens with the form beside the 14-item checklist. Meter LM-7730215, the address and the 2,500 A service match the account. But the form names Harlow Cold Storage LLC, and account 3-118-40562 is held by Harlow Logistics Holdings Ltd, with no letter of authorisation. Every item carries its evidence and page — Form p.1, Sheet E-1, Spec p.1.
Completeness checker: never marks an item complete without the evidence on the page
- 05Sheet E-1
The single-line shows 17 inverters, not 16
Completeness checkerThe single-line diagram is stamped by J. Okafor, PE, licence 0041877, signed 9 Oct 2026 — that item passes. But sheet E-1 draws 17 × Sorrel SPX-125-US at 125 kW each, 2,125 kW AC, while the form says 2,000 kW from 16 inverters. The margin note says what fixes it: correct the single-line, or state an export limit of 2,000 kW.
“17 inverters × 125 kW = 2,125 kW AC. The form says 2,000 kW (16).”
- 06Spec p.1
The inverter is on the list — but not this model or firmware
Equipment list matcherThe spec sheet is for the Sorrel SPX-125-US with firmware 2.8, certified to UL 1741 SA and IEEE 1547-2003. Lumina's approved equipment list, revision 30 Sep 2026, carries only the SPX-125-US-B with firmware 3.2 or later, listed to UL 1741 SB, IEEE 1547-2018 and IEEE 1547.1-2020. A suffix or a firmware difference is a mismatch; the matcher names the closest listed model.
Equipment list matcher: never accepts an unlisted model or firmware
- 07The upgrade route
Route C: stay on ML-14 at 2 MW, and pay for it
Marcus Oyelaran · Distribution planning engineerScreens and routes puts three routes side by side. Route C keeps the full 2,000 kW on ML-14: generation on the line section reaches 3.2 MW against a 15 % limit of 3.15 MW, and voltage rise at the connection is 2.6 % against 2.0 %. It fails 3 of 6 screens and needs a voltage regulator, 0.9 km of reconductoring and a supplemental review — an estimated $410,000 and 9–12 months.
“screening only — the engineer's study decides”
- 0808:24
Marcus chooses route B: connect to AV-07
Marcus Oyelaran · Distribution planning engineerRoute B connects to AV-07, 600 m north along Quarry Road: 2.0 of 3.0 MW, a line extension estimated at $96,000 and 3–4 months, full export with no curtailment, and all 6 screens pass. Route A stays on ML-14 with export held to 1,400 kW, using the battery for the midday surplus. Marcus chooses B; the notice now recommends it and offers route A as well.
“Moving the connection 600 m avoids the $410,000 upgrade that route C needs, and keeps the full 2,000 kW export.”
- 0908:31
One notice, every gap, and where the project fits
Nadia Ferreira · DER interconnection coordinatorThe deficiency notice writer has drafted the letter in plain words: the account holder, the AC rating and the inverter model, each with what to send and its page, then “Where your project fits” with the two routes. Nadia reads it and sends it to Tom Hale at Kestrel Solar & Storage at 08:31 — 25 minutes after arrival, on day 0 of 10. The clock pauses and queue place 8 is kept.
“The notice writer drafts; only you can send. Sending pauses the clock and keeps queue place 8.”
- 10This week
46 of 46 inside the completeness clock
Elena Brandt · Manager, DER interconnectionElena owns the clocks. The Clocks screen counts business days on each one, paused while an application is with the applicant, with holidays from Lumina's calendar: 46 of 46 answered inside the 10-day completeness clock, a median of 6 minutes from arrival to verdict, and 0 past any clock. The longest took 1.2 days — a hand-drawn single-line that Nadia read herself.
Screening clock — 15 business days from complete, closest to the limit first