- Before
- “I don't need another spreadsheet. I need to know which standards are hollow, why, and who is fixing them.”
- Now
- Starts the day with the agents' note, accepts mappings with a reason and her signature, assigns each gap and watches the spines fill.
One IOSA standard, from a superseded reference to an owned fix
Corvane Airways, a network carrier with its hub at DEN, is 172 days from its risk-based renewal audit: remote document review March 1–19, 2027, on-site at DEN April 5–9, against ISM Edition 18. It is also folding in the manuals of Halvard Air, a regional airline it acquired in March 2026. Here is one Thursday morning, screen by screen, in the working solution.
- 0104:52
The morning note: what was checked, what could not be filled
Readiness AgentOvernight the agents re-checked all 871 standards that apply to Corvane. 742 are filled. The Readiness Agent could not fill 68: 23 have no valid manual reference and 45 are not shown as done in the records, and 19 of them come from Halvard Air. Marisa Calloway's Today screen lists five things that need her, starting with GRH 3.1.5.
“Three things need you today: the GRH 3.1.5 fix, 54 mappings you can accept in one decision, and 9 drafted corrective actions.”
- 02Morning
IOSA readiness at a glance, on one shelf
Marisa Calloway · Quality Assurance ManagerEvery applicable standard is a spine on a shelf by discipline: ORG, FLT, DSP, MNT, CAB, GRH, CGO and SEC. A spine is filled when it is documented and done, half filled when the manual says it but the records do not show it yet, hollow when no current paragraph documents it, and tinted when an agent has proposed a mapping that waits for her. Beside it, the Readiness Agent explains how it decides.
“Each night I check every spine three ways: a current manual paragraph documents it; records from the last 24 months show it done; and a second agent agrees. Only then is a spine filled.”
- 0303:57 overnight
GRH 3.1.5 cites a paragraph that no longer exists
Revision Checker and Mapping AgentGRH 3.1.5 covers fueling with passengers on board. The IOSA reference matrix still cites GOM 4.6.2, Revision 11. The Revision Checker found that Revision 12, effective July 1, 2026, deleted it when the Halvard fueling procedure was merged into the GOM. The Mapping Agent linked the current text, GOM 4.7.3, at 0.96 confidence, and the Revision Checker agreed it is current and covers the cabin crew notification.
The Mapping Agent only proposes. Below 0.85 confidence it asks instead, and no proposal is shown until a second agent agrees.
- 04She asks
Documented, but not yet implemented at one station
Evidence AgentThe Evidence Agent sampled 120 September fueling records. DEN and ORD are 40 of 40. At SEA, 37 of 40 show the cabin crew notification; 3 are on the Halvard form HV-GO-17, which has no field for it. Marisa asks why SEA is different, and the answer cites the record, the form and the revision.
“This is a stock and briefing problem at one station, not a procedure problem.”
- 05One decision
She accepts the mapping, with a reason and her signature
Marisa Calloway · Quality Assurance ManagerMarisa reads the sources and accepts GOM 4.7.3 Revision 12 with reason code A1, “Mapping correct as proposed”. The superseded reference GOM 4.6.2 comes off the matrix. The spine turns half filled: documented, not yet shown as done.
“I, Marisa Calloway, sign this decision. It is recorded with the time, the reason and the sources.”
- 06Assigned
The gap goes to Ground Operations, owned and dated
Marisa Calloway · Quality Assurance ManagerShe assigns CA-2026-061 to Ground Operations and Carmen Delacroix, due December 15, 2026, with a reminder three days before. The note to the liaison is already written: retire HV-GO-17 at SEA first; the December re-sample closes it. A manual change, MCR-2026-118, will correct the matrix row. When the re-sample comes back clean, a person verifies and closes the action, and the spine fills.
- 07Corrective actions
The IOSA corrective action plan, drafted with its root cause
Corrective Action DrafterThe Corrective Action Drafter wrote CA-2026-061 at 04:44: the root cause (the Halvard fueling log stayed in use at SEA after Revision 12 withdrew it), the action (remove the HV-GO-17 stock at SEA, brief the 14 SEA fueling supervisors), and the evidence that will close it (40 SEA records re-sampled, none failing). It now sits, assigned, among the 62 corrective actions drafted from the 68 gaps; 8 others still wait for Marisa to approve, edit or reject.
The Corrective Action Drafter drafts only. A person approves, edits or rejects it with a reason.
- 08With the owner
The manual change goes out as a redline with its reason
Sam Ostrowski · Manual Owner, GOMThe Revision Checker re-checked the 31 references into six revised manuals and found 9 broken. MCR-2026-118 shows the old and new text of GOM 4.7.3 step 6, which now adds “Form HV-GO-17 is not used at any station.”, and the matrix row from GOM 4.6.2 (Rev 11) to GOM 4.7.3 (Rev 12). Sam approves it in the manual system; the Revision Checker confirms the published text.
- 09Before November 1
The acquired airline's manuals, read against yours
Integration AgentThe Integration Agent read Halvard Air's 9 manuals: 486 procedures in IOSA scope, 401 matching a Corvane procedure, 52 already merged, 14 in conflict and 19 gaps on the shelf. Winter makes HAL-C-07 the first to decide: SEA and PDX still post the 2024–25 de-icing holdover table. Elliot Vance, the IOSA Coordinator, decides each conflict.
The Integration Agent never merges manuals; every conflict goes to the IOSA Coordinator.
- 10April 5–9
The audit week, rehearsed question by question
Audit Rehearsal AgentFrom the shelf and the people who own each discipline, the Audit Rehearsal Agent built the on-site week at DEN, 8 interviewees and 214 likely questions, and an evidence pack per discipline. Carmen Delacroix is 19 of 24 ready: the question “Show me how the cabin crew are told fueling has started at SEA” is marked record missing until CA-2026-061 closes.
The evidence packs are released to the auditor only when a person says so.