Large Load Interconnection Intake

Large load interconnection intake that screens every request against headroom and offers a staged ramp the grid can serve now

Every request screened against headroom, with a staged offer the grid can serve now.

See one case, screen by screen ↓
target100%of capacity offers checked against the planning case and the upgrade plan before a study starts
estimated$13.1Ma yearestimated minimum-demand revenue from a 120 MW first stage served from 2028, not all 300 MW from Q3 2030 — 120,000 kW × 80 % × $11.40 × 12
demo2,170MWof the 3,855 MW asked scores under 50 — the phantom load, with no site control, no deposit or duplicates elsewhere
target1dayfrom a complete request to a screening decision, against a median of 31 days before
The problem

Why large-load requests swamp planning before anyone knows which are real

Data centres, hydrogen electrolysers, district cooling plants and heavy industry ask for hundreds of megawatts at a time — often for the same parcel at two or three utilities at once, and with ramp schedules that run ahead of their own transformer orders. Each request arrives as an application form, a ramp schedule, a one-line diagram and a stack of land and finance documents. The key-account manager chases what is missing by email, the tariff analyst works out the deposit, minimum bill and collateral by hand, and nobody checks systematically whether the same site was asked of a neighbouring utility.

Headroom is checked last. Transmission planning runs its screen only once the request is complete, weeks after it arrived, and the answer is usually binary — “we can study 300 MW” or “not before 2030” — when a staged yes was available. Every speculative study uses planning engineers, the scarcest people in the utility, and every capacity reservation without collateral is stranded-cost risk carried by other customers. Tariff terms applied in spreadsheets are a non-discrimination risk in front of the commission.

typical30 → 13GWAEP Ohio's large-load queue, before and after its data-centre tariff billed at least 85 % of the capacity a customer claims
typical474.7GWin ERCOT's large-load queue by June 2026, 90 % of it data centres; in May more than 300 GW had no studies submitted
Where a large-load request's screening days goestimated
By hand31 days
With the solution1 days
  • Reading the application, ramp schedule and site and finance documents3 → 0.1 d
  • Readiness checks — site control, security, permits, equipment, water8 → 0.3 d
  • Checking for the same site at other utilities3 → 0.1 d
  • Deposit, minimum bill and collateral from the large-load tariff4 → 0.1 d
  • Headroom screen against the planning case and the capital plan10 → 0.3 d
  • Capacity offer, sign-off and study agreement draft3 → 0.2 d

Estimated split for one complete request, in calendar days, from complete to a screening decision — by hand (the sample utility's median was 31 days) and with the solution (the 1-day target).

How it works

How a large-load request moves

Six agents read, check and screen every large-load request against the network; the transmission planner signs every capacity offer.

What comes in
Requests in5 sources · application and ramp, site and finance documents, tariff, planning case, capital plan
Agents at work
Request readerfields + pages
Then
Readiness checker
Duplicate detector
Tariff terms checker
Then
Headroom screenerstaged ramp
Then
Study agreement drafternever sends
A person decides
Transmission plannersigns every capacity offer
What comes out
Signed staged offer
Study agreement
Missing-evidence letter
One case, step by step

One 300 MW data-centre request, from the queue to a signed staged offer

Lumina Utilities carries 14 open large-load requests for 3,855 MW against a 6.4 GW system peak. On Tue 13 Oct 2026, Kestrel Bay Data Partners' request for 300 MW at Harrow Ridge 230 kV — complete since 9 Oct — is next to screen. Here is what happens, screen by screen, in the working solution.

  1. 01Morning

    Fourteen requests, 3,855 MW asked — 875 MW ready

    Amara Okafor · Large-load account manager

    Amara's queue is ranked by readiness, in queue order under Schedule LL-1 §4.3. Seven requests score 70 or more for 875 MW; 2,170 MW scores under 50, with no site control, no deposit or duplicates. LL-2026-041, Kestrel Bay's Harrow Ridge Campus, asks 300 MW by Q4 2028 and is waiting to be screened.

    “Everyone wants 300 MW by 2028. I need to know who is real before planning spends a month on them.”

  2. 0210:02 · one click

    The file read, checked and screened in about a minute

    Six agents

    Amara presses Screen request. The request reader takes 9 documents and 214 fields: 300 MW at Harrow Ridge 230 kV, ramp 60 → 150 → 300 MW by Q4 2028. The readiness checker finds 6 pass, 3 pending and 3 short. The duplicate detector and the tariff terms checker follow, then the headroom screener — each step logged with its time, from 10:02:06 to 10:03:15.

    Readiness checker: “site option ends 31 Mar 2027; letter of credit $20.0M; no air permit for backup generators”

  3. 0310:03

    180 MW short in 2028 — and a staged offer the network can serve

    Headroom screener

    On the 2028 summer peak case, rev. 3 (N-1), Harrow Ridge has 120 MW for new load from Q2 2028, after the contracted Calder Valley Hydrogen load. The ramp is 30 MW above headroom in Q2 2028 and 180 MW short from Q4 2028, hatched red on the chart. The screener proposes three stages that follow the capital plan: 120 MW now, 240 MW with Harrow–Calder Line 2 in Q3 2029, 300 MW with autotransformer AT-2 in Q3 2030.

    “The network cannot carry 300 MW in 2028. It can serve the ramp in three stages as the planned upgrades come in.”

  4. 04Why Harrow Ridge

    The same request, re-screened at Calder

    Headroom screener

    Clicking Calder 345 kV on the map re-screens the request there: 360 MW of headroom at the end of 2028, but 350 MW held by requests ahead, so 10 MW free — and 18 km of new 345 kV line to reach it. Ardent AI's 450 MW at Harrow Ridge is earlier in time but missed its site-control date on 29 Sep, so it holds no capacity. Kestrel Bay's own transformer order covers 180 MW in 2028.

    “Kestrel Bay's own transformer order covers 180 MW in 2028: the 300 MW step is ahead of its hardware.”

  5. 05Duplicate check

    Same parcel, same 300 MW, another utility

    Duplicate detector

    The shared large-load register shows record CV-2026-0188: parcel HR-0417, 212 acres, 300 MW, filed with Corvane Electric Cooperative on 3 Aug 2026 — a 0.94 match against a threshold of 0.85. The two site outlines differ by less than 20 metres. Kestrel Bay's disclosure in Part 7 of the application says “none”. The detector recommends asking for an explanation and keeping the request in screening.

    “The detector flags; it never rejects.”

  6. 06The scorecard

    58 of 100 — real enough to study, staged

    Readiness checker

    Twelve readiness checks and six tariff checks, each cited to its document and page. Site control: a purchase option on parcel HR-0417 that expires 31 Mar 2027, before the facilities study ends. Financial security: a $20.0M letter of credit against $65.7M needed for 300 MW, or $26.3M for a 120 MW first stage. Backup generation: 24 × 2.5 MW diesel sets, air permit not filed.

    “Real enough to study as a staged request, not as 300 MW in 2028.”

  7. 07Tariff terms

    Schedule LL-1 applied line by line, for the staged offer

    Priya Venkataraman · Regulatory and tariff analyst

    Eligible at 300 MW against the 75 MW threshold; study deposit of $450,000 received 2 Oct; billing demand floor 80 % of contract capacity at $11.40 per kW-month — a $1.09M minimum bill a month for stage 1. Security is 24 months of minimum bills because the guarantor is not rated investment grade: $26.3M before stage 1, so Kestrel Bay is $6.3M short. Priya confirms the terms.

    “Staging cuts the security needed now from $65.7M to $26.3M; the rest is due 90 days before each later stage.”

  8. 0810:41 · signed

    The planner signs the staged offer

    Tomás Lindqvist · Senior transmission planning engineer

    Amara sends the staged offer to Tomás with the basis — the 2028 summer peak case rev. 3 (N-1) and the capital plan — and a note: Kestrel Bay asks 300 MW by Q4 2028; Harrow Ridge has 120 MW. Tomás signs at 10:41. His signature reserves no capacity by itself: stage 1 is reserved when $26.3M of security is in place.

    “Don't promise a megawatt I haven't seen in the case.”

  9. 09Missing evidence

    Four items, each with the clause that asks for it

    Amara Okafor · Large-load account manager

    The study agreement drafter has written the letter to Jonah Mercer, Kestrel Bay's project director, from the short and pending checks: site control through 30 Sep 2027, security of $26.3M for stage 1, an explanation of the request to another utility, and the air permit application for the backup generators — reply due Fri 13 Nov 2026. Amara reviews it and sends it herself.

    “Drafted by the study agreement drafter · Amara reviews and sends · agents never write to a developer.”

  10. 1011:03 · approved

    A study agreement for the staged scope, three signatures in order

    Helen Strand · Director, Grid Connections

    The facilities study agreement is drafted from template SA-LL rev. 4 and the signed offer, with every clause that differs from the request marked: 300 MW by Q4 2028 becomes 120 MW in Q2 2028, 240 MW in Q3 2029 and 300 MW in Q3 2030; security before reservation falls from $65.7M to $26.3M. Tomás signed at 10:41, Priya confirmed the tariff terms at 10:52, and Helen approves at 11:03.

    “This agreement reserves no capacity by itself.”

Who it’s for

Built for everyone who decides a large-load request.

The same 300 MW request, seen by the four people at Lumina who screen, sign, price and approve it — what their week looked like, and what it looks like now.

AO
Amara OkaforLarge-load account manager, Grid Connections · runs screening and sends to developers
Large-load account manager
Before
Carries 14 open requests for 3,855 MW, with a developer on the phone every hour asking “when?”, and chases missing documents by email.
Now
Screens a complete request in one click, sees who is real by readiness score, and sends a letter where every missing item cites its clause.
TL
Tomás LindqvistSenior transmission planning engineer · runs the 2028 summer peak case and signs every capacity offer
Transmission planner
Before
Studies the number the developer asked for, weeks after it arrived. “Don't promise a megawatt I haven't seen in the case.”
Now
Gets the ramp drawn against headroom from his own planning case, with the stages tied to the capital plan, and signs the offer with its basis in front of him.
PV
Priya VenkataramanRegulatory and tariff analyst · applies Schedule LL-1 and answers the commission's quarterly large-load report
Regulatory and tariff analyst
Before
Works out deposits, minimum bills and collateral in spreadsheets. “If we waive collateral for one, we have to for all of them.”
Now
Confirms a calculation where every line cites its clause of Schedule LL-1, for the request as asked and as staged — the same schedule for every customer.
HS
Helen StrandDirector, Grid Connections · approves study agreements and owns the queue rules
Director, Grid Connections
Before
Owns a queue that has to stand up to scrutiny. “The queue order has to survive a complaint to the commission.”
Now
Sees asked against ready megawatts by year and substation, where the phantom load sits, and approves study agreements after the planner and the analyst.
Built on the engine

6 agents. Each with one job, and hard limits.

Six agents read, check and screen every large-load request against the network; the transmission planner signs every capacity offer.

Request reader

Reads the application, ramp schedule, one-line diagram, site plan, site and finance documents and purchase orders, and extracts every field — applicant, parcel, point of delivery, contract capacity, ramp by quarter, load factor, equipment, security, disclosures — with its document and page.

  • Never edits the developer's numbers
  • Marks a field unreadable rather than guessing
Readiness checker

Scores 12 readiness checks — site control, security, land use, equipment, water, generation, disclosure — out of 100, and flags dates that fall before the end of the study.

  • Never accepts a document without a date and a signature
  • Never scores a request it has not fully read
  • Asks for missing evidence; never assumes it
Duplicate detector

Matches parcel, site centroid, applicant family (including parent companies), megawatts, ramp and contact against Lumina's queue and the shared large-load register, flags matches at or above 0.85 and compares them with the applicant's disclosure.

  • Never rejects a request — it flags and asks
  • Never shares one developer's data with another
Tariff terms checker

Applies Schedule LL-1 for the request as asked and for any staged offer: eligibility, study deposit, minimum demand, security, term, exit fee and direct-assigned facilities, each line cited to its clause, with security held against needed.

  • Never waives or changes a tariff term
  • Treats every customer by the same schedule
Headroom screener

Draws the ramp against substation headroom from the planning case in force (N-1) and the approved capital plan, removes load held ahead in the queue, finds the shortfall by quarter and proposes a staged ramp that follows the upgrade dates; compares the nearest alternative substations.

  • Never reserves capacity
  • Every offer needs the transmission planner's signature
  • Never uses a planning case that is not in force
Study agreement drafter

Drafts the facilities study agreement from template SA-LL rev. 4 and the signed offer, marking every clause that differs from the request, and drafts the missing-evidence letter from the short and pending checks, each with its clause.

  • Never sends anything to a developer
  • Never drafts a scope the planner has not signed
Transmission planner

Signs every capacity offer. The agents propose; a named person decides.

Ask in plain words

Ask about any request, substation or tariff term

Ask in plain words — or say what to change. Every answer points to the planning case, the register or the schedule it came from.

Why can't Harrow Ridge take 300 MW in 2028?

Because it has 120 MW for new load from Q2 2028. The 2028 summer peak case (rev. 3, N-1) gives Harrow Ridge 135 MW on the existing network, and the contracted Calder Valley Hydrogen electrolyser takes 15 MW from Q2 2028. Line 2 adds 120 MW in Q3 2029 and AT-2 another 100 MW in Q3 2030. Kestrel Bay's 300 MW in Q4 2028 is 180 MW short, so the offer is staged: 120 MW now, 240 MW with Line 2, 300 MW with AT-2.

Has this site asked another utility for power?

Very likely. Register record CV-2026-0188 shows parcel HR-0417 and 300 MW filed with Corvane Electric Cooperative on 3 Aug 2026 — a 0.94 match. Kestrel Bay's application, Part 7, says “none”, and Schedule LL-1 §2.4 requires every such request to be disclosed. An explanation has been added to the missing-evidence letter; it is not a reason to reject on its own.

What security does the staged offer need?

$26.3M for stage 1. Schedule LL-1 §6 asks for 24 months of minimum bills unless the customer is rated investment grade: 120 MW × 80 % × $11.40 per kW-month × 24 = $26.27M. Kestrel Bay holds a $20.0M letter of credit, so it is $6.3M short. At the full 300 MW it would need $65.7M. Security for stages 2 and 3 is due 90 days before each stage.

Which requests are really ready?

7 of 14, for 875 MW of the 3,855 MW asked: Lumina Water's desalination stage 2 (92), Meridian Cooling (88), Pelham Logistics (85), Halcyon Edge (81), Tallis Cells (79), Northmoor Steel (75) and Solvane Hydrogen (71). Three requests for 2,050 MW score under 45 — Stonebridge, Brightwater and Ardent — with no site control, no deposit or duplicates elsewhere.

Every screen

The working solution, as it ships.

13 screens from the working solution, on its sample data. Pick one to see it large.

Headroom and the staged offerThe network map with each substation's headroom ring, the ramp plotted against Harrow Ridge's headroom with the upgrades marked, and the staged offer: 120 MW now, 240 MW in Q3 2029, 300 MW in Q3 2030.
Agents at workThe run log in progress: request reader, readiness checker, duplicate detector and tariff terms checker done, the headroom screener at work, each step with its finding and its time.
Compare another substationThe same request re-screened at Calder 345 kV: 360 MW of headroom, 350 MW held ahead, 10 MW free in 2028.
Send the offer to the plannerThe three stages with their basis — the planning case and the capital plan — and a note to the transmission planner.
The signed staged offerSigned by the transmission planner at 10:41, with stage 1 security of $26.3M ($6.3M short) and $13.1M a year in minimum demand revenue from 2028.
The large-load queueFourteen open requests ranked by readiness — megawatts, substation, capacity held, flags and next step — with asked against ready across the top.
The readiness scorecardTwelve readiness checks, each cited to its document and page, the score of 58 out of 100, the request at a glance and the documents read.
Duplicate checkThe request beside register record CV-2026-0188, field by field, with the parcel overlay and the decision still open.
Tariff termsSchedule LL-1 applied to the staged offer, every line cited to its clause, security held against needed and minimum demand revenue by year.
Missing-evidence letterThe drafted letter to the developer: four items, each with the clause that asks for it, reply due in 30 days.
Study agreementThe facilities study agreement for the staged scope, the sign-off in order and what changed from the request, clause by clause.
Pipeline and phantom loadMegawatts asked and ready by year, where the phantom load sits and the quarterly large-load report for the commission.
Your rulesSchedule LL-1's terms and the queue dates — eligibility, deposit, demand floor and charge, security, term and ramp — each a setting, every change logged.
Governance

Built for a queue the commission can audit.

Every number cites its sourceEvery check, every dollar and every megawatt cites its document and page, the clause of Schedule LL-1, or the planning case and its revision — the scorecard, the tariff calculation and the offer alike.
The planner signs every capacity offerA capacity offer goes out only with the transmission planner's e-signature, its meaning recorded. The tariff analyst confirms the terms, the director approves the study agreement, and only the account manager sends to a developer.
Agents never reserve capacityThe agents read, check, calculate and draft. They never reserve capacity, waive a tariff term, reject a request or write to a developer — and even a signed offer reserves stage 1 only once its security is in place.
One schedule for every customerThe tariff terms checker applies the same Schedule LL-1 to every request and cannot waive a term, so the deposit, minimum bill and collateral are calculated the same way for every developer.
Queue order you can defendQueue order follows Schedule LL-1 §4.3. A missed site-control or deposit date drafts a withdrawal notice for the account manager to review and send, and every change is logged.
One record for the commissionEvery agent step and every decision — who screened, who signed and when, who recorded a duplicate decision and why — is in the audit trail, and the commission's quarterly large-load report is drafted from the same records.
Configuration

Your tariff, your queue rules, your planning case

The large-load tariff, the queue dates, the readiness line and the planning basis are settings — changes are logged in the audit trail.

SettingDefaultChoose from
Eligibility threshold75 MWNew or added load at one site, in MW — set from your large-load tariff
Study deposit$150,000 + $1,000 per MW requestedDollars per MW requested, on top of the fixed deposit
Billing demand floor and demand charge80 % · $11.40 per kW-monthShare of contract capacity billed at minimum, and the demand charge per kW-month
Security24 months of minimum billsMonths of minimum bills, unless the customer is rated investment grade
Site-control and deposit dates90 days · 30 daysDays from receipt; when a date is missed, draft a withdrawal notice for the account manager — On · Off
Ready line70 of 100Score at which a request counts as ready; check weights: site control 20, security 20, disclosure 10, land use 10, equipment 10, water 10, generation 10, forms 10
Duplicate match threshold0.85Flag a register record at or above; the shared large-load register is read daily — On · Off
Planning case and criterion2028 summer peak · rev. 3 · N-1The case in use and its contingency; upgrade dates from the approved capital plan 2026–2031; offer a staged ramp when a request is above headroom — On · Off
Connections

Works with the documents and plans a large-load request already runs on

Load request and ramp schedulethe application form, ramp by quarter, load factor and one-line diagram
Site control and financial securitypurchase options, rezoning, letters of credit, guarantor standing, purchase orders
Large-load tariffthe schedule in force and its earlier versions, with commission orders
Planning case and capital planheadroom by substation and quarter, with the approved upgrade dates
Shared large-load registerrequests filed with neighbouring utilities, matched by parcel, site, applicant and MW
Study agreements and lettersyour study agreement template, missing-evidence letters and withdrawal notices
What it changes

The difference, in numbers.

Every figure is labelled: a target the solution is built to, an estimate, a typical published result, or a proven one.

target
100%
of capacity offers checked against headroom and the upgrade plan before a study starts
estimated
$13.1Ma year
estimated minimum-demand revenue from a 120 MW first stage, served two years sooner
Q2 2028, not Q3 2030
stage 1 of 3 energised early
target
1day
from a complete request to a screening decision, not 4–6 weeks
By hand4–6 weeks
With agents1 day

“demo” = seen in the working solution, on its sample utility data · “target” = the design goal, measured in the live solution · “estimated” = our arithmetic, inputs shown ($13.1M = 120,000 kW × 80 % × $11.40 per kW-month × 12, on the demo tariff; the days split is our estimate around the sample utility's 31-day median from complete to screened) · “typical” = published figures (Utility Dive / Enverus, Dec 2025: AEP Ohio's queue fell from 30 GW to 13 GW after its data-centre tariff; ERCOT interconnection and grid analysis update and Senate testimony, 2026: 474.7 GW of large-load requests by June 2026, about 90 % data centres). Regulatory context: Texas SB 6 (2025) sets standards for new loads above 75 MW, including site control and disclosure of similar requests. Lumina Utilities, its Schedule LL-1, substations, developers, sites and the people named on this page are fictional — characters and sample data in the working solution.

Questions

What connections and planning teams ask us.

What is large load interconnection intake?

It is the work of taking a large-load connection request — a data centre, hydrogen plant, cooling plant or industrial load asking for tens or hundreds of megawatts — and deciding whether it is real and what the network can serve before a costly study starts. Large Load Interconnection Intake does it with six agents that read the file, score readiness, look for the same site at other utilities, apply the large-load tariff and screen the ramp against substation headroom. The transmission planner signs every capacity offer.

How does it screen a data centre request against substation headroom?

The headroom screener reads the planning case in force and the approved capital plan, removes load held ahead in the queue and plots the requested ramp against the substation's headroom quarter by quarter, with the upgrades marked. In the sample case Harrow Ridge has 120 MW from Q2 2028, so a 300 MW ramp by Q4 2028 is 180 MW short. It can re-screen the same request at another substation for comparison.

What is a staged ramp offer?

Where the ramp outruns the network, the screener proposes stages that follow the upgrade dates instead of a plain no. For Kestrel Bay that is 120 MW on the existing network, 240 MW when Line 2 is in service in Q3 2029 and 300 MW after AT-2 in Q3 2030. The security is recalculated for the first stage — $26.3M instead of $65.7M — and the offer goes to the planner to sign.

How does it find speculative and duplicate large-load requests?

The readiness checker scores 12 checks out of 100 — site control, security, land use, equipment, water, generation and disclosure — and passes a check only with a dated, signed document. The duplicate detector matches parcel, site, applicant family and megawatts against the shared large-load register and compares them with the developer's disclosure. It flags and asks; it never rejects.

Does it apply our own large-load tariff?

Yes. The tariff terms checker applies your schedule — eligibility, study deposit, minimum demand, security, term, exit fee and direct-assigned facilities — for the request as asked and for any staged offer, each line cited to its clause. It never waives or changes a term, and your tariff analyst confirms the calculation.

Do people stay in control of capacity offers?

Yes. The agents read, check, calculate and draft; they never reserve capacity, waive a tariff term, reject a request or write to a developer. The transmission planner signs every capacity offer, the tariff analyst confirms the terms, the director approves the study agreement and only the account manager sends.

Can we set our own queue rules and planning basis?

Yes. The eligibility threshold, deposit, billing demand floor, demand charge, security months, term and ramp, site-control and deposit dates, the ready line and check weights, the duplicate match threshold, the planning case and contingency criterion, and who signs and sends are all settings, and every change is logged.

How long does large load interconnection software take to go live?

The Agentic Solution Engine builds and deploys it from your requirements and documents — your large-load tariff, application form, queue rules, planning case and study agreement template — and it goes live once every quality gate has passed. We will walk you through it on a sample of your own requests first.

See it on
your large-load queue.

We'll run Large Load Interconnection Intake on a sample of your own large-load requests, your tariff and your planning case.